REKAPITULASI PERMOHONAN PEMBAYARAN / INVOICE

Pekerjaan : FS Relokasi Pemukiman Rawan Bencana


Lokasi Kegiatan : Kecamatan Kembang Janggut dan Kecamatan Tabang
Nomor Kontrak : 640.3-459/800.2-DCKTR/VIII/2015
Tanggal Kontrak : 20 Agustus 2015
Nama Konsultan : PT. FASADE KOBETAMA INTERNASIONAL

PERMOHONAN PEMBAYARAN /INVOICE


NILAI KONTRAK JUMLAH BIAYA
NO URAIAN SISA
S/D YANG LALU SAAT INI S/D SAAT INI
[Rp.]
A BIAYA LANGSUNG PERSONIL
1 Biaya Tenaga Profesional Rp 348,000,000.00 Rp - Rp 87,000,000 Rp 87,000,000 Rp 261,000,000
2 Biaya Tenaga Pendukung Rp 130,000,000.00 Rp - Rp 32,500,000 Rp 32,500,000 Rp 97,500,000

SUB TOTAL I Rp 478,000,000 Rp - Rp 119,500,000 Rp 119,500,000 Rp 358,500,000


B BIAYA LANGSUNG NON PERSONIL
1 Biaya Kantor Rp 9,200,000.00 Rp - Rp 2,300,000.00 Rp 2,300,000 Rp 6,900,000
2 Biaya Operasional Lapangan Rp 184,000,000.00 Rp - Rp 59,500,000.00 Rp 59,500,000 Rp 124,500,000
3 Biaya Presentasi Rp 28,500,000.00 Rp - Rp 9,500,000.00 Rp 9,500,000 Rp 19,000,000
4 Biaya Laporan Rp 29,000,000.00 Rp - Rp 4,000,000.00 Rp 4,000,000 Rp 3,850,000

SUB TOTAL II Rp 250,700,000 Rp - Rp 75,300,000.00 Rp 75,300,000.00 Rp 154,250,000


TOTAL = I + II Rp 728,700,000 Rp - Rp 194,800,000.00 Rp 194,800,000.00 Rp 512,750,000
PPN 10 % Rp 72,870,000 Rp - Rp 19,480,000.00 Rp 19,480,000.00 Rp 51,275,000
TOTAL Rp 801,570,000 Rp - Rp 214,280,000.00 Rp 214,280,000.00 Rp 564,025,000
DIBULATKAN Rp 801,570,000 Rp - Rp 214,280,000.00 Rp 214,280,000.00 Rp 564,025,000
PROSENTASE PRESTASI PEKERJAAN [%] 100.00 0.00% 26.73% 26.73% 70.37%
Terbilang: Empat Ratus Lima Puluh Tujuh Juta Tiga Ratus Dua Puluh Ribu Rupiah

Jumlah Biaya Prestasi Rp 214,280,000.00


Tingkat Penyelesaian Prestasi Pekerjaan = x 100 % = x 100 %
Nilai Kontrak Rp 801,570,000.00

= 26.73 %

Disetujui Oleh Dibuat Oleh


Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
Dinas Cipta Karya dan Tata Ruang PT. FASADE KOBETAMA INTERNASIONAL
Kabupaten Kartanegara

AFFIT ADRIANI, ST. Ir. MOCH RIZA FIRDAUS


NIP. 19830427 201101 1 002 Direktur Utama
Pekerjaan : FS Relokasi Pemukiman Rawan Bencana
Lokasi Kegiatan :Kecamatan Kembang Janggut dan Kecamatan Tabang
Nomor Kontrak :640.3-459/800.2-DCKTR/VIII/2015
Tanggal Kontrak :20 Agustus 2015
Nama Konsultan : PT. FASADE KOBETAMA INTERNASIONAL
Periode : 8/20/2015 s/d 9/19/2015

I BIAYA LANGSUNG PERSONIL


NILAI KONTRAK PERMOHONAN PEMBAYARAN/ INVOICE SISA
JUMLAH BIAYA JUMLAH S/D BULAN YANG LALU SAAT INI S/D SAAT INI JUMLAH
NO. NAMA JABATAN
SATUAN ORANG BULAN SATUAN BIAYA BULAN / JUMLAH BIAYA BULAN / JUMLAH BIAYA BULAN / JUMLAH BIAYA BULAN / BIAYA
[Rp.] [Rp.] HARI [Rp.] HARI [Rp.] HARI [Rp.] HARI [Rp.]
A.1 Biaya Tenaga Profesional
1 Ir. Heri Permana Team Leader O.B 1.0 4.0 bln 15,000,000 60,000,000 - bln - 1.0 bln 15,000,000 1.0 bln 15,000,000 3.0 bln 45,000,000
2 Shony Mandala, ST. Tenaga Ahli Arsitektur O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000
3 Didin Saepudin, SE.,M.Si. Tenaga Ahli Ekonomi Pembangunan O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000
4 Ricky Rukmandar, ST. Tenaga Ahli Geodesi O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000
5 M. Zaenal Hakim, A.Ks, MS Tenaga Ahli Sosial Budaya O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000
6 Churchil Pebrion, ST Tenaga Ahli Teknik Lingkungan O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000
7 Oka Purwanti, ST.,MT. Tenaga Ahli Teknik Sumber Daya Air O.B 1.0 4.0 bln 12,000,000 48,000,000 - bln - 1.0 bln 12,000,000 1.0 bln 12,000,000 3.0 bln 36,000,000

TOTAL 348,000,000 - 87,000,000 87,000,000 261,000,000

A.2 Biaya Tenaga Pendukung


1 Hardiansyah, ST. Estimator O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
2 Iim Madrohim, ST. Estimator O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
3 Henri Budianto Drafter O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
4 Ade Irmansyah Drafter O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
5 Adri Nugraha, A.Md Surveyor O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
6 Bagus Budi Jatmiko, A.Md. Surveyor O.B 1.0 4.0 bln 5,000,000 20,000,000 - bln - 1.0 bln 5,000,000 1.0 bln 5,000,000 3.0 bln 15,000,000
7 Stephanie Eka Wulandari, ST. Administrasi O.B 1.0 4.0 bln 2,500,000 10,000,000 - bln - 1.0 bln 2,500,000 1.0 bln 2,500,000 3.0 bln 7,500,000

TOTAL 130,000,000 - 32,500,000 32,500,000 97,500,000


TOTAL I 478,000,000 - 119,500,000 119,500,000 358,500,000

II BIAYA LANGSUNG NON PERSONIL


B.1 Biaya Kantor
1 Komunikasi Kantor 1.0 4.0 Paket/Bln 1,000,000 4,000,000 - Paket/Bln - 1.0 Paket/Bln 1,000,000 1.0 Paket/Bln 1,000,000 3.0 Paket/Bln 3,000,000
2 Bahan Habis Pakai 1.0 4.0 Paket/Bln 1,300,000 5,200,000 - Paket/Bln - 1.0 Paket/Bln 1,300,000 1.0 Paket/Bln 1,300,000 3.0 Paket/Bln 3,900,000

TOTAL 9,200,000 - 2,300,000 2,300,000 6,900,000


B.2 Biaya Operasional Lapangan
1 Sewa Kendaraan Roda Empat 1.0 2.0 Unit/Bln 12,000,000 24,000,000 - Unit/Bln - 1.0 Unit/Bln 12,000,000 1.0 Unit/Bln 12,000,000 1.0 Unit/Bln 12,000,000
2 Sewa Alat - alat Survey 1.0 1.0 Paket 30,000,000 30,000,000 - Paket - 0.5 Paket 15,000,000 0.5 Paket 15,000,000 0.5 Paket 15,000,000
3 Biaya Akomodasi Survey 1.0 1.0 Paket 130,000,000 130,000,000 - Paket - 0.25 Paket 32,500,000 0.25 Paket 32,500,000 0.75 Paket 97,500,000

TOTAL 184,000,000 - 59,500,000 59,500,000 124,500,000


B.3 Biaya Presentasi
1 Presentasi Laporan 1.0 3.0 Presentasi 9,500,000 28,500,000 - Presentasi - 1.0 Presentasi 9,500,000 1.0 Presentasi 9,500,000 2.0 Presentasi 19,000,000

TOTAL 28,500,000 - 9,500,000 9,500,000 19,000,000


B.4 Biaya Laporan
1 Dokumentasi 10.0 1.0 Buah 200,000 2,000,000 - Buah - - Buah - - Buah - 1.0 Buah 200,000
2 Laporan Pendahuluan 10.0 1.0 Buah 200,000 2,000,000 - Buah - 1.0 Buah 2,000,000 1.0 Buah 2,000,000 - Buah -
3 Laporan Bulanan 10.0 4.0 Buah 200,000 8,000,000 - Buah - 1.0 Buah 2,000,000 1.0 Buah 2,000,000 3.0 Buah 600,000
4 Laporan Akhir 10.0 1.0 Buah 200,000 2,000,000 - Buah - - Buah - - Buah - 1.0 Buah 200,000
5 Gambar DED Perencanaan 10.0 1.0 Buah 200,000 2,000,000 - Buah - - Buah - - Buah - 1.0 Buah 200,000
6 Bill Of Quantity (BOQ) 10.0 1.0 Buah 100,000 1,000,000 - Buah - - Buah - - Buah - 1.0 Buah 100,000
7 RAB 10.0 1.0 Buah 100,000 1,000,000 - Buah - - Buah - - Buah - 1.0 Buah 100,000
8 RKS Teknis 10.0 1.0 Buah 200,000 2,000,000 - Buah - - Buah - - Buah - 1.0 Buah 200,000
9 Dokumen Kompilasi Data FS + Resum 10.0 1.0 Buah 750,000 7,500,000 - Buah - - Buah - - Buah - 1.0 Buah 750,000
10 HD Data 1 Tera 1.0 1.0 Buah 1,500,000 1,500,000 - Buah - - Buah - - Buah - 1.0 Buah 1,500,000

TOTAL 29,000,000 - 4,000,000 4,000,000 3,850,000


TOTAL II 250,700,000 - 75,300,000 75,300,000 154,250,000
TIME SCHEDULE
Pekerjaan : Pengawasan Teknis Pembangunan Jogging Track dan Taman Kota Di Tepi Sungai Mahakam
Lokasi Kegiatan : Kecamatan Tenggarong Kota
Nomor Kontrak : 640-765.4/03/BANG-SP/VIII
Tanggal Kontrak : 1-Aug-13
Nama Konsultan : CV Jasa Pribhuni
Periode : 1 Desember 2013 s/d 30Desember 2013 (bulan Ke V)

Bobot BULAN KE
NO. URAIAN PEKERJAAN KETERANGAN
(%) 1 2 3 4 5

A. BIAYA LANGSUNG PERSONIL Masa


I. Biaya Tenaga Ahli 25.60% 5.12% 5.12% 5.12% 5.12% 5.12% Pelaksanaan
II. Tenaga Penunjang 54.22% 10.84% 10.84% 10.84% 10.84% 10.84% 150 Hari Kalender
BIAYA LANGSUNG NON PERSONIL
I Biaya Kantor 7.08% 1.42% 1.42% 1.42% 1.42% 1.42%
II. BiayaTransportasi 3.01% 0.60% 0.60% 0.60% 0.60% 0.60%
IV Biaya Pelaporan 10.09% 1.81% 1.81% 1.81% 1.81% 2.86%

Jumlah 100%
Rencana kemajuan mingguan 19.79% 19.79% 19.79% 19.79% 20.84%
Rencana kumulatif kemajuan mingguan - 19.79% 39.58% 59.37% 79.16% 100.00%
Realisasi kemajuan mingguan 19.79%
Realisasi kumulatif kemajuan mingguan - 19.79%
Deviasi (Kemajuan / Keterlambatan) 0%

Disetujui Oleh Di Buat Oleh


Pejabat Pembuat Komitmen Konsultan Pelaksana
Dinas Cipta Karya dan Tata Ruang CV. Jasa Pribhuni
Kabupaten Kutai Kartanegara

Agus Sujarwo, ST Yoyok Suyoso, ST


Nip. 19760820 200801 1 016 Direktur