PROJECT: THE EXECUTION AND COMPLETION OF CONTRACT FOR CIVIL & STRUCTURAL
WORKS FOR THE PROPOSED BIOGAS PLANT AT SOUTHERN MALAY PALM OIL
MILL, SIMPANG RENGGAM, JOHOR DARUL TAKZIM.
- Submission Of Revised Tender -
With rei'ence to the above-mentioned, we are pleased to submit herewith our revised tender amounting to RM5,l 38,8 I 2.20, based
on the final revised tender drawings and BOQ emailed to us on 2610712023.
We are pleased to attach herewith the revised BOQ for your kind consideration.
Trusting our above subrrission meets your kind requirement and we sincerely look fbrward to the early award of this prestigious
pro.ject.
Thank you.
l3-lF, Jalan Maju 3/3, (BLOK G), Taman Lembah Ma.iu, 56100 I(Lrala Lur.r.rpur.
Tel:03-4296 1268 (Hunting Line)
E,mai I : rubykhoosb@gmai l.conr
L
ENGHOLA BIOBRIDGE FRONT SDN. BHD.
Price quoted on
No Description 31"t July 2023
RM
Total 5,138,812.20
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
,|
ACCESS TO AND WITHIN SITE
The Contractor must ascertain the actual condition for being
materials, labour and plant to and within the site. Further, he
shall provide and maintain all necessasry temporary roads,
walkways, cross-overs stagings, bridges, surface water drains,
culverts and internal access for the construction of works and
clear away same on completion of the works.
Included
Attention is also hereby drawn that the Contractor will have to
share with other Contractors the use of common access and
approach roads to transport his materials, labour and plant etc. to
the site and no claims will be considered on the ground of
hindrance obstructions experienced due to the presence of other
Contractors being employed on or around the site.
ENGHOLA
SCHEDULE OF MTES : BILL NO. 1 - PRELIMINARY & GENERALS
5 TRIAL HOLES
The Contractor shall excavate all trial holes as directed by the
Engineer and shall perform all soil bearing tests to determine the
N/A
bearing capacity of the soil. The Contractor shall allow and
provide all the necessary equipment to carry out this test.
6 EXISTING SERVICES
The Contractor shall take all necessay steps to ascertain the
exact positions of existing cables, pipes, ducts, sewers, service
mains and the like and shall uphold, protect and maintain the
same during excavation and make good or pay for making good
all damage thereof and any consequential damage or loss arising
oul of such damage. lncluded
7 SEQUENCE OF WORK
The Engineer may, at his discretion direct the Contractor to give
priority to certain works or order the Contractor to do certain lncluded
works first.
8 PROGRAMME OF WORK
The Contractor shall submit as required, sufficiently detailed
works programme in triplicate showing the order or sequence tn
which he proposes to carry the various parts of the works, and to
the best of his knowledge the anticipated times for completion of lncluded
work including Prime Cost programme by the Engineer is
necessary.
It will be revised thereafter, as it is necessary when further
information becomes available but the Contractor shall not depart
from it and will be held responsible for the satisfactory progress
and completion of the works in accordance with the Condition of
Contract
dj'\
*"i'"'95o-r.A,
)g
'x-it'*a.z9
ENGHOLA
SCHEDULE OF RATES: BILL NO.1 - PRELIMINARY& GENERALS
9 PROGRESS REPORT
The Contractor shall prepare and submit to the Engineer daily
progress reports for the works at weekly intervals. The works
shall be including those of Nominated Sub-Contractor and Lump
indicating the number of workmen employed, materials and sum
1
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
The Contractor shall allow for an shall comply with all the
requirement as set out in the Act. The Contractor and Site
Supervisor equally responsible of their Building were to collapse N/A
and can be fine up to Rlvl500,000.00 orjailed 10 years or both.
16 INSURANCE
16.1 Contractors's All Risks
The Contractor's attention is specially drawn to his responsiblities
under Clause 22 and 23 of the Conditions of Contract for Works
of Civil Engineering Construction (FlDlC 4th Edition 1987).
The Contractor shall effect and maintain a "Contractor's All Risks Lump
1 5,500.00
Policy" in the joint names of the Employer, the Contractor, their Sum
appointed Sub-Contractors and Nominated Sub-Contractors and
shall arrange the Policy with an lnsurance Company to be
approved by the Employers and covering particularly the
following;
(i) The Total value of Works in accordance with the Contract Sum.
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
(iii) Bodily injury and/or personal injury including death and property
Qi-#9
{sg9
ENGHOLA
SCHEDULE OF RATES: BILL NO.1 - PRELIMINARY& GENERALS
The Contractor shall ensure that the policy taken should cover at
least 15% of Contract Sum for Estimated total salaries, wages
and other money earnings.
The Contractor shall provide all necessary labour, plant and tools
for the proper and efficient execution of the works. He shall
provide for all transport for labour and for the movement of plant
and equipment to and from site.
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
Tenderer to take back the cabjn container from site after project
completion. The cabin must remain at site untal the Control
Engine Room is fully energized to facilitate meetings.
22 EXISTING ROADS
The Contractor shall diverts as required all drains and other
walerways encountered during the progress of the works. Where
such diversions are temporary, the Contractor shall subsequently
reinstate to the approval of the Engineer.
The Contractor shall take over and maintain all the new roads
and shall be responsible for any damage to existing roads, kerbs,
drains, crossing, culverts, etc. caused by his workmen, vehicle or
plant or that of Nominated Sub-Contractors and Nomrnated
Suppliers, approaching or leaving the site and to maintain, repair
and reinstate the aforesaid to their original conditions to the
satisfaction of the Engineer for alternatively to bear the cost of lncluded
such maintenance and restoration as a deduction from any
money due to or become due to the Contractor under his
Contract.
ENGHOLA
SCHEDULE OF RATES: BILL NO.1 - PRELIMINARY& GENERALS
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENEMLS
25 WORKMANSHIP
All workmanship related to the permanent shall be skilled in so
far as the work required in the opinion of the Engineer. The
standard of workmanship shall be the best obtainable in the lncluded
region and to the requirement of British Standard Code of
practice.
29 SIGNBOARD
The Contractor is to provide and fix in a position to be determaned
by the Engineer a framed signboard size of required design and
wordings. The Contractor shall also pay all fees as required by Lump
local authonty for putting up the signboard. No other boards or 1 3,500 00
Sum
advertisement wlll be permited to be displayed on or around the
works. All boards are to be removed on completion of the works.
30 ORDERING MATERIALS
The Contractors shall place his orders for specified materials at
the earilest possible date after notification of acceptance of
tender or at such time as may be specifically stated elsewhere
herein for any particular materials.
The Contractor shall not enter into any agreement for the supply
lncluded
of materials to the site unless written approval has been given by
the Engineer on those materials and the Employeer shall not be
held responsible for rejected material delivered to site and for
materials which have been over ordered by the Contractor.
31 SITE MEETINGS
The Contractor shall attend all site meetings to be called by the
Engineer at which a senior member of his staff and the foreman
rn charge will attend to bring abount the proper management and
full co-ordination ofthe Contract as well as to check the progress I ncluded
of works and resolved any problems. The Contractor shall inform
Nominated Sub-Contractors when their presence at the meeting
'ffiq
are required.
'W
ENGHOLA
SCHEDULE OF RATES : BILL NO. '1 - PRELIMINARY & GENERALS
32 SAFETY MEASURES
The Contractor shall comply fully as regards providing all
necessary safety measures, safety helmets, safety boots, safety
belts, proper signboards and the like for workmen carrying out
the Works and any special precaution necessary for the safety of
Lump
the public. The Contractor shall provide sufficient safety 1 10,000.00
Sum
equipment on the work site and have taken proper care to
include the cost of such equipment in this item. The contractor is
responsible to employ a Safety Officer approved by DOSH on
site if required by DOSH.
33 INSTRUMENTS
The Contractor shall make available and maintain a theodolite
and dumpy level, levelling staff and 100'long measuring tape in a Lump
6,000.00
satisfactory condition on site throughout the duration of the
1
Sum
Contract and for as long thereafter as the Enqineer require.
/,
r!
:]
{L
r.""""*
l.i;,i;i!il
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
The Contractor shall as part of the site fire prevention and fire
fiohtino facilities institrrie the fnllowino maacrrrpq'-
Keep entrances, gangways, staircases, hydrants or other water
supply clear and in partly completed buildings, ensure that
access to upper floors does not become impeded by stacked
materials.
lncluded
Provide separate metal containers for each form of flammable
waste and organise regular collection and disposal.
Make daily fire inspection, once in the morning and the other just
as work is finishing for the day, to make sure that rubbish fires
have been properly extinguished, stores locked, windows closed,
no lighted cigarette ends left about.
lnstall a suitable fire alarm system such as an audible warning
system, with a clearly distinctive note, to warn all personnel and
to summon assistance in fighting the fire until fire brigade arrives.
38 POLICE REGULATIONS
The Contractor shall observe and comply with any police
regulations governing the loading/unloading of or waiting by
vehicles on public roads, highways and the like including the I ncluded
carriage of any materials, protective covering warning displays
etc. and to pay for all costs involved.
39 ANTI.POLLUTION MEASURES
The Contractor shall make adequate provision by spraying,
hosing, erecting screens or other suitable methods as directed by
the Engineer, against any nuisance or damage by dust or other Lump
pollution for work under this Contract and to persons or Sum
1 Omitted
properties in the vicinity, and he will be held solely responsible for
any complaint damage or claim in this connection.
ffi
Sub-total carry forward 218,390.00
/+'
,\/
rrt I
r\,
\*
:ar<a/
ENGHOLA
SCHEDULE OF RATES: BILL NO.1 - PRELIMINARY& GENERALS
levels are not known or water arising from any other source) at all
times to ensure that, so far as practicable all work is carried out
in the 'dry'.
He shall employ whatever means that may be necessary to keep
the site dry including baling, pumping (including power pumping)
provision of temporary earth drains (including precast concrete
drains where they are deemed necessary by the Engineer,
drainage pits, water courses and any other means which the
Engineer may direct.
The Contractor shall ensure that the water drained from the site
shall be kept reasonably free form earth, debris etc. He shall be
responsible for finding outlets for the discharge of the water
drained from the site to the public drains, he shall be responsible
for making arrangements with the Authorities to do so including
paying all necessary fees and making good damages to the
roads, drains etc.
ffis
\da
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
43 SILTING
The Contractor shall be deemed to have visited the site and to
have ascertained the extent of desilitng to be done to the existing
monsoon drains so as to keep all the drains free of mud and
other obstruction before commencement of works. Lump
1 Omitted
The Contractor is also to keep all drains, streams and waterways Sum
free from mud, silt and other obstructions and make good where
necessary to the satisfaction of the Engineer during the currency
of the Contract.
45 DISCREPANCIES IN DRAWINGS
The Contractor shall be responsible for checking all drawings
issued to him and if he finds discrepancies in the Drawings he
shall before proceeding with the Works, inform the Engineer of
such discrepancies and the Engineer's ruling shall be taken as
final. I ncluded
No claim by the Contractor for any extra costs incurred as a
result of discrepancies in drawings will be entertained if he fails to
inform the Engineer of such disrepancies before proceeding with
ENGHOLA
SCHEDULE OF RATES : BILL NO. 1 - PRELIMINARY & GENERALS
49 COVER.UP
Where items of works have been provided as provisional or
where provisional sums have been allowed for in the Schedule of
Works, such works done shall not be covered up until the I ncluded
Engineer has been notified and has taken measurements and
other information.
50 SAMPLES
Where materials and fittings ar specified to be 'approved',
samples shall be submitted for approval at the earliest possible
date after acceptance of tender and before any order bulk
deliverv is made.
All samples which are approved will indicate the standards to be
maintained in the execution of the works and shall be so marked
and retained by the Engineer. In cases where samples are
rejected, further samples must be provided until they are lncluded
approved.
All samples submitted shall be free of charqe.
Where reference is made to trade names or manufacturer's
catalogue numbers, the Contractor may use materials or goods
similar and equal in standard to those described only if
specifically approved by the Engineer in writing.
51 PRESS STATEMENTS
The Contractor, his workmen or agents will not make any public
or press statement of any form or description which are
exasperative and detrimental to the intests of the Employer,
lncluded
supervisory staff or any Engineers connected with this contract
nor will divulge any information to the public concerning this
contract before or after the completion of the works.
w
-.dElir'
ENGHOLA
SCHEDULE OF RATES: BILL NO.1 - PRELIMINARY& GENERALS
53 CLEANING UP PERIODICALLY
All rubbish shall be cleared from the site and buildings under
construction from time to time as it accumulates and as the
Engineer may direct. Lump
1 10,000.00
Sum
The terms rubbish shall also be held to include all debris and
waste incurred on the works, including the cut off lengths of piles.
ENGHOLA
SCHEDULE OF MTES : BILL NO. 1 - PRELIMINARY & GENERALS
57 AS-BUILT DRAWINGS
On completion of the works, Contractor must prepare and submit
to the Engineer 3 sets of as-built drawing for all scope of
construction works. For infrastructure works layout, the drawing
shall be prepared and certjfifed by a licensed surveyor. For
structural works all the drawings must be duly endorsed by the Lump
1 18,000.00
Contractor Site Agent and License Surveyor. The As-Built Sum
drawings shall include a set of soft copy (AutoCad R2000 or
above). Note: This is a compulsory item to be quoted.
ENGHOLA
SCHEDULE OF MTES : BILL NO. 1 - PRELIMINARY & GENERALS
59 MOSQUITO PREVENTION
All excavation and portion of site where water stagnates or
accumulates will be kept dry by pumping, baling or other
operations.
Allow for taking such precautions as maybe deemed necessary
or desirable by the Engineer for the prevention of breeding of
mosquito and pay all charges as may be required by the Local
Authority concerned for any antimalaria measures taken.
Lump
The Contracor must refrain from dumping or depostting rubbish, 1 3,500 00
Sum
spoil, unused materials, empty bottles, cans and other containers
capable of collecting liquids which afford breeding places for
mosquitoes. The Contractor will be held responsible for mosquito
nuisance at the site and surroundings arising from non-
observance of the provisions of this Clause and will be required
to empty whatever mosquito destructive measures to the
Engineer's direction at the Contractor's own expenses.
60 WORKING HOURS
No restrictions are placed on the Conractor on the working hours
on site, but he shall comply with all current Bye-laws, Rules and
Regualtions affecting work and labour and also the
National/Public Holidays etc. of the state. The Contractor shall
also note that there may be residence, Mosque, Schools,
Hospital, Offjces and the like at close take these into lncluded
consideration whilst performing work which may be a cause of
public disturbance.
61 STAMPING CHARGES
The Contractor shall allow for stamping charges for preparing
contract documentations (minimum 4 copies). The Contract Lump
Documents will be prepared by the Employer / Engineer. Sum
1 6,000 00
(Charges are 0.1a/o of the Total Contract Value)
'ffi1^U\
W
Konsultant Proses Sdn Bhd 17 of 17 Revised on 26 July 2023
ENGHOLA BIOBRIDGE FRONT SDN, BHD,
ENGHOLA
SCHEDULE OF PRIGES : BILL NO.2 - PILING WORKS
aa Pay Length
2.3.1 The payable length for the supply, deliver, unload, handle,
transport and pitch of pile shall be the actual number and length
delivered and subsequently incorporated into the works.
2.3.2 The payable length for driving shall be measured for the actual
penetration lengths of each pile into the ground from the toe of
driven pile to piling commencement level at particular pile pojnt.
Allow for moving and handling piling equipment, plant, tools and
ancillary equipment about the site as often and whenever
necessary for the execution of the whole piling operation
2.4.2 Item 5,000.00
including any excavation and filing required for moving the plant,
tools, differing levels of the site, erecting of any staging required
and dismantling and removal on completion.
Notes :
ENGHOLA
SCHEDULE OF PRICES : BILL NO.2 - PILING WORKS
ENGHOLA
SCHEDULE OF PRICES : BILL NO. 3 . BUILDING WORKS AND APPURTENANCE
OESCRIPTION
1 GUARD HOUSE
1.1 Construction of one unit of Guard House as per the details m'? 9 44,704 00
shown on lhe relevant Arch tectural and Structural drawings and
1.5
Supply and lnstall D[,4] Wheather Span 0 47mm TCT Primamaju
metal roofing or equivalent roofing materia complete wilh 50mm
rock wool and alumtnium foil insulation for the building as per
dela drawings and all ln accordancewith the specf cations.
1.7 Any other items whrch are shown on the drawings and specified
but not included n the above mentioned ltems of this Schedule oi
Prices (to be detatled by Tenderer)
* Notes:
a) To use clay bricks for all bul dino and construction works
c) Table top with glass panel c/w additional aluminium frame with
slidino qlass at bottom.
e) To include painiing one coat of primer and two (2) finishing coats
ENGHOLA
SCHEDULE OF PRICES ; BILL NO. 3 - BUILDING WORKS AND APPURTENANCE
DESCRIPTION
Any other items which are shown on the drawings and specified
2.7 but not inciuded in the above mentioned items of this Schedule of
Prices (to be detailed bv Tenderer)
* Notes ;
b) To include paintino one coat of primer and two (2) f nishinq coats
ENGHOLA
SCHEDULE OF PRICES : BILL NO. 3 . BUILDING WORKS AND APPURTENANCE
DESCRIPTION
Su b-tota I b ro u g ht f o N a rd 84,300.00
Any other items which are shown on lhe drawings and specified
but not included n the above mentioned items of this Schedule of
Prices (to be delailed by Tendere0
i) Acoustic roller shutters. nr 3 32,200 00 96 600 00
Noies
Each Acoustic roller shulters motors to have dedicated power
supply (S/O p ug point) beside the shutter
3.'1C Construclion of Manhole (RC cast rn-stu) c/w HDpE pipe lot 1 7,800.00 7,800.00
Sleeves embbeded c/w PC slab cover wrth appropriate lrf|ng
hook to be constructed on the ground to facltate laying of
transmission cables behind Electrica Room leadino to another
Electrical manhole beside Tx Room
ENGHOLA
SCHEOULE OF PRICES : BILL NO. 3 - BUILDING WORKS AND APPURTENANCE
DESCRIPTION
4
4.1 Construclion of one unit of Transformer buildino as pet the 62 1 56 600 00
details shown on the relevant Architeciural and Structural
drawings and in accordance with the specifications (Single Tx
Chamber)
ENGHOLA
SCHEDULE OF PRICES : BILL NO. 3 . BUILDING WORKS AND APPURTENANCE
DESCRIPTION
46 Any olher items which are shown on the drawings and specified
but not included in the above menlioned items of thls Schedule of
Pnces (to be detailed bv Tenderer)
0 Roof slab to be water proof type with roof upsland, roof scupper
drain appropriate slope of roof slab and down-comer pipe to
drain.
s) Cable i\ilanhoLe size1.5m x x1 5m x 1m c/w 16 nos x 0150
HPPE Pipe Sleves Embosed on both enlrance and exit of the
manhole. The HDPE pipes at the exit of the manhole is 1o be
connecled lo the Tx Room trench opening
h) Cab e Trench opening at transformer room and swttchgear room.
entrance and exit to have 1m width for'14 nos x @150 HDPE pipe
sleeves and 4 nos x O'150 l-'IDPE pipe seeves respeclively
i) The perimeler drain at the side near the manhole and dratn
behind the Tx Building is to be omitted. Perimeter drain is
provided at two sides only. (Refer to dwg).
ENGHOLA
SCHEDULE OF PRICES : BILL NO. 3 - BUILDING WORKS AND APPURTENANCE
DESCRIPTION
7 OPEN FLARE
Conslruction of reinforced concrete foundalion plinlh and beams I 13 700 00
7.1 and other relaied works as per drawings and all in accordance
with the soecifications
I TANK AREA
Constructton of reinforced concrete foundalion tank, pump as per
delail drawings and all in accordance with the specifications.
Notes:
a) Embedded Plate dimensions at the AD Tank foundation slab is to
be provided by Technolgy Provrder The sealing-off of the groove
using SICAFLEX with Water prooving is to be done by the
Technoloqy provlder
Notes
a To consider leaving stafter bars exposed from the ground slab
for casting of the Vibrating Super Structure made of RC by
Technology Provtder.
ENGHOLA
SCHEDULE OF PRICES : BILL NO. 3 - BUILDING WORKS AND APPURTENANCE
DESCRIPTION
Any olher items which are shown on the drawinas and specified
bui not included in the above mentioned items of this Schedule of
Prices (to be detailed bv Tenderer)
10 RAW POME PUMP SUMP (A) c/w PUMP PLINTH (3m x 2.5m
x3mD)
101 Construction of reinforced concrete structure as per detaii Lot I 71,200 00
drawings and all in accordance with the specifications (location
at lhe exit of Buffer Pond)
Notes
a To install Sure Stop PVC Water prooftng during wall casting.
10.2 Any other items which are shown on the drawings and speclfied
but not included in the above mentioned items of th s Schedule of
Pr ces (to be detailed bv Tenderer)
Note : Sump to be built on the slope area below effluent pond
ENGHOLA
SCHEDULE OF PRICES : BILL NO.4 - EXTERNAL WORKS (All Provisional)
,|
SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL)
1.1 Clearance of all roots, bushes, undergrowth trees, roots stumps,
tree chopping, rubbish, debris and grubbing and disposal of
m2 9300 10.50
material all in accordance with the specification or as directed by
the Enqineer.
Strip top soil to an average depth of 150 mm (6") and stock pile
for reuse or dispose all in accordance with the specification or as
97,650 00
directed by the Engineer. (Site Clearance)
Note: To allow cost for all the debris from the site clearance ie. (trees,
woods, rubbish, etc.) to be transpoied and dumped at the designated
dumping area location which is within 5 kilometer radius from project site
as approved by client at latter stage. The size of the dumping area will
be confirmed by client after site possesslon
2.2 Move the excavated material to filling area spread leveled and
compacted with 1oton roller compactor for every 225mm layer as 16.50 4,250.00
m' 4,500 7
described all as per S.O.'s approval
3 PREMIX ROAD
3.1 Construction of premix road inside the plant as shown in the
drawings and in accordance with the specification. m2 4BO 210.O0 100,800.00
Notes
a) Premix Road Profile
Premix Wearing Course : 40mm Thk
Pemix Binder Course : 50mm Thk.
Compacted Crusher Run : 300 mm Tck.
Sand Bedding : 100 mm Tch
Polysheet TS 60 Geotextile Separator : 1 layer
ENGHOLA
SCHEDULE OF PRICES : BILL NO.4 - EXTERNAL WORKS (All Provisional)
t DRAINAGE
Item 4.1 & 4.2 pricing shall include excavation in all materials,
concrete bedding, backfilling, disposal of surplus materials,
stepping of anverts, etc. and any other inverts, etc. and any other
works necessary for the completion of construction of drains as
per detail drawing and specification
Supply and lay 300 mm half round reinforced concrete drain as
41 shown on drawings, all in accordance with the specjfication or as m 670 562.00 376,540.00
directed by the Engineer.
5 SUMP
Item 5.1. 5.2 & 5.3 pricjng shall include excavation rn all
mateilals, concrete bedding, backfilling disposal of surplus
material, stepping of inverts, m.s grating, etc. and any of the
works necessary for completion of construction of the sump as
per detail drawinqs and specification.
5.1 600 mm x 600 mm R.C. sump nr 7 2,770.00 19,390.00
5.2
900 mm x 900 mm R.C. sump (omitted due to the new
NT 0
arrangement)
a) Back door gate, 1 nos x Single Leaf Door at the back side of the
plant - location to suit at site.
b) Concrete beam / slab at the bottom of the fencing is removed.
7 CULVERT
Item 6.1 prlcing shall include excavation in all materials, concrete
bedding, backfilling, disposal of surplus materials, stepping of
inverts, etc and any other works necessary for the completion of
construction of drainage as per detail drawing and specificatron.
7.1 Supply and lay 600 mm RC pipe culvert Class 'Z' Heavy Duty
type and all associated works as shown on the drawings, all in
accordance with the specification and as directed by the m 6 900.00 5,400.00
Engineer. (for the road - drain crossing the first entrance of the
project site as indicated in the layout)
ENGHOLA
SCHEDULE OF PRICES : BILL NO.4 - EXTERNAL WORKS (All Provisional)
10 SEPTIC TANK
10 1 Supply and install Septic Tank (PE 5-7) WEIDA or equivalent as
per drawings and specification c/w construction of Inlet & Ouflet
Lot 1 7,800.00 7,800.00
RC lnspection Chamber as stated in the supplier catalogue.
SCHEDULE OF PRICES
Bill No. 5 - Electrical Works
i)
ii)
d Supply and install Cable From IVISB Panel to DB TX & Switgear Room : 'l BO m 70.00 5,600.0(
( 4C x10 mm, PVC/SW JPVC Cu. Cable + E in gatvanised cabte
rayltrunking
rower point using 2 x1C 4mm sq PVC + CPC Cable in G.l Conduit
7 nos 495.00 3,465.00
f qircond points 2 x '1x 4mm sq.pvc + CPC Cable in Concealed pVC 5 nos 4'10.00 2,050.00
londuit
I points 2 x 1c 6mm sq.pvc+ CPC Cable in G.l Conduit 2 nos 265.00 530.00
h High Speed HDlVll Cable 1 0m at Meeting room c/w projecter hook and 1 no 750.00 750.00
service box
o supply and install light flttings, and compound lighling c/w cabling, as
the light fittings shown on the tender drawings complete with control
, ancillaries and accessories, etc as specifled in the tender
work not listed above but are necessary for the complete
of the system. OtheMise it's deemed inclusive in the tender.
Notes:
1) To use RCCB instead of ELCB.
ENGHOLA
SCHEDULE 0F PRICES : BILL N0. 6 . COLD WATER SERVICES
1 Tapping Point
2 Guard House
2.3
425 mm PVC Class C pipe (consealed into wall) - Guard
lot 1 650.00 650 00
House to PE Tank at above Toilet
2.4 @25 mm lsolatinq Gate Valve before tank
- Bronze nr 1 1 10.00 1 10.0c
425 mm PVC Class C pipe (consealed into wall) - PE Tank
2.5 lot 1 450.00 450.0c
to Toilet
2.6 @25 mm Stopcock - Bronze nr 1 95.00 95 0C
2.7 415 mm PVC Class C pipe (consealed into wall)
i) to Water Closet ooint lot 1 450.00 450,0c
ii) to Bidet Sorav ooint lot 1 450.00 450.0c
iii) to Hand Wash Sink point lot 1 450.00 45U.UU
28 Water Closet - Ceramic - Seatinq Type - Floor Standinq lot I 1960.00 1,960.0C
2.9 Water Control Valve - Bronze - A15 mm nr 1 165.00 165,00
2.10 Bidet Spray Chrome Hvqienic - A15 mm nr 1 195.00 195 00
Hand Wash Sink - Ceramic - (Dim. 34cm x 30cm) c/w SS
211 lot I 650 00 650.00
304 tap.
2.12 Other lnter-Connecting Piping Accessories and Necessary
Fittinos to comnlete the ahorre wnrks
lot 1 000 000
7ry"\
'
,
't 'l'1'
\L\ i
r.t 1/ ;:{' ,
ENGHOLA
SCHEDULE OF PRICES : BILL N0. 6 . COLD WATER SERVICES
3.2
@25 mm HDPE pipe - submerged in ground - tee-off from
(Main Line) to Control & Fnoinp Rnom lot 1 850.00 850.0c
425 mm PVC Class C pipe (consealed into wall) - from
(Main Pioe) to PE Tank ai above Toilet lot 1 620.00 620 00
3.4 @25 mm lsolating Gate Valve - Bronze nr 1 1 10.00 1 '10.00
3.5
425 mm PVC Class C pipe (consealed into wall) - PE Tank
lot 1 620.00 620.00
to Tee point.
@25 mm PVC Class C pipe (consealed into wall) - from Tee-
36 lot 620.00 620,00
off point to Toilet.
1
3.2 Kitchen Faucet Tap - @15 mm - SS 304 - Top Mount nr 2 490.00 980 00
3.2C Kitchen Sink - Top Mount SS 304 - Sinqle Bowl nr 2 1350.00 2,700.0c
Other lnter-Connecting Piping Accessories and Necessary
3.2 lot I 0.00 0.0c
Fittinqs to comDlete the above works
ENGHOLA
SCHEDULE OF PRICES : BILL NO, 6 - COLD WATER SERVTCES
Notes :