Shandong Alles Energy Technology Co.LtSHANDONG&ALLES CNC MACH
VALUES
WAR EBS RRS AL PR ASME ES
ALDGATE She
/ be the Leading Manufactur
er of CNC lathe Industry
FBR RONE SS
BSRRNrR
Affordable Price.Better Quality
— %
z
‘
ERREPMS I ¥
Five-stor Service —) — 4
| -_ .—. iB SE RIMMIRBA Equipment Name and Appearance
(Only for reference)
Unit Price $
Name of Product IVY ne OL Ca Ce oT
| ALCK6140"1
Cnc lathe machine 1 | Set
000 |
Commercial Items
1. Payment: 50% TT in advance, 50% balance before machine delivery.
2. EXW: Jinan factory
3. Warranty: 12 months.
4. The charge standard for engineers to repair the machine on the customer site
is $90/day.
5. Delivery time: 60 working days.
6.0ffer Date: 2021-9-18
=. &RBERBRSX Configuration&echnical ParametersParameter
No Item Unit
ALCK6140/1000
1 Max swing over bed mm 400
2 X-direction rail span mm 210
3 Z.direction rail span mm 400
4 Maximum swing over slide mm 0180
5 Center distance mm 1000
6 Maximum turning length mm 850
From bed 20 150
7 | Center height
Off the ground 1100 1065
8 Spindle hole diameter mm 048
9 Bar diameter mm 045
1o._| With hollow chuck pull rod through |, a
hole
n Spindle end type A2-6
12 Chuck mm Ordinary @200/chuck
B Taper of spindle taper No Chuck
14 Spindle speed limit rpm 2000
6 Diameter of tailstock sleeve mm 65
16. | Taper of inner foe of tailstock sleev | 4, me
7 Tailstock sleeve stroke mm 140
18 Tailstock configuration Ordinary hand crank
19 Electric tool post knife number Set 4
20 Knife square size mm | [20x20 (four stations)Shandong Alles CNC @g
Screw mo X direction mm FDC2506-P3
a del Z direction mm FDC3210-P3
22 | xIZ direction fast moving speed | _mimin 6/8
2B X stroke mm 240
24 Minimum setting unit mm 0.001
25 main motor power KW 55
26 Total power KW 10
7 Machine weight Kg 1800
og | Dimensions (ero x width « heigh am »7600=1800%1650
t
Machine structure characteristics and functional requirements
1. The whole machine has compact structure, beautiful appearance, large sp
indle torque, high rigidity, stable and reliable performance, and excellent acc
uracy retention.
2 Optimized design of the headstock, suitable for turning of disc and shaft pa
rts. It can process straight, circular, metric and inch threads, and multi-thread
ed. It can be suitable for turning discs and shafts with complex shapes and h
igh precision requirements. Parts Processing.
3 Both the machine tool guide rail and the sliding saddle guide rail adopt har
d guide rails made of special materials, which are high-frequency quenched,
super hard and wear-resistant, durable, and have good machining accuracy
retention.
4 The CNC system adopts GSK980TC3 system, domestic famous ball screw a
nd high-precision screw bearing.
5 The spindle adopts high-precision spindle bearing set and has been precis
ely assembled and dynamically balanced to ensure that the spindle has hig
h precision, low noise and strong rigidity.
| La6 Each lubrication point adopts a forced automatic lubrication device for fixe
d-point and quantitative lubrication of the lead screw and guide rail. When t
here is an abnormal state or the amount of oil is insufficient, a warning signa
lis automatically generated.
7 Standard configuration adopts domestically made three-jaw self-centering
manual chuck.
8 The guide rail is equipped with a scraping device to prevent the guide rail f
rom being corroded by iron filings and coolant, and to facilitate the cleaning
of iron filings.
Machine accuracy
Test items ‘Standard tolerance (mm)
Periodic axial movement of the spindle 0.005
Radial runout of the positioning cone of the spi
0.005
ndle chuck
Repeat positioning accura
Position accuracy 40.005
cyA
Diameter consistency 0.01/150
Flatness 0.025/g300
Thread pitch product error 0.010/100
Surface roughness Rat.éum
fai fi Tr
Name Specification model Qty | Brand | Origin
Domesti
Control System Guangshu 980TC3 Iset | Hiroshi
c
Domesti
Spindle structure Promise Iset | PrutDomesti
Screw bearing —_| Ball screw special bearing | 1set
c
Domesti
Spindle motor 5.5 KW Iset | Faucet
c
Domesti
guide Induction hardening iset | Prut
c
Domesti
Ball screw 2506/4008 Iset
c
Four-station electric tool p Domesti
Tool holder Iset
ost c
‘Automatic lubrication Domesti
RBCLB-2B2K Iset | Hejin
device c
Three-jaw manual chu Domesti
k11200 Iset
ck c
Domesti
Cooling pump P=90W Iset
c
Acceptance of machine
1 The machine tool is checked and accepted according to the GB/T25659.1-20
10 standard, which is divided into two stages: pre-acceptance and final acce
ptance.
2 Pre-acceptance (optional): carried out in the factory of Party A, and accept
ed according to the machine tool product inspection certificate;
3 Final acceptance: It will be carried out in Party B's factory in accordance wi
th the requirements of the technical agreement. After the acceptance is pass
ed, the representatives of both parties will sign it into effect. The final accept
ance is over. At the same time as the final acceptance, Party A will conduct aShandong Alles CNC : GG
technical training for the relevant personnel of Party A (one person for each
machine tool, no more than 1 day), the training of operators can be operated
independently, and simple equipment maintenance.
Installation and commissioning
1 Installation: The user is responsible for foundation manufacturing, machine
components in place, and installation of the machine tool in accordance with
the technical requirements of foundation installation; the user is equipped wi
th machine tool power, compressed air, hydraulic oil, lubricating oil, coolant, e
tc., and the user prepares qualified blank parts and tools as required. Good pr
eparation before debugging;
2 Commissioning: Party A is equipped with installation and commissioning p
ersonnel who are responsible for guiding the on-site installation of the machi
ne tool, level adjustment, and trial cutting of workpieces, and meet the requir
ements of the agreement.long Alles CNC @F
#5 Midinstallation and commissioning
1.232188 Installation and commissioning
ALCK6140*1000H RRS MSNA BERS. RED. DROP) B (BG
MARS MABNBTRA) BERIT.
The installation and operation of ALCK6140*1000 is in accordance with the two national standards
(CNC machine product radiation safety, equipment classif tation, requirements and user's guide and
(CNC machine equipment and facilities electrical safety ).
() SHEMGHEREN RARE. HEARSE IPA MRE ROE
a.
(1) Determine the specific installation location of the equipment after the contrac
t takes effect. The equipment installation guide shall be provided within 7 working
a
(2) RAOAM, ARLADONKSFSRSRRER,
(2) Before installation and debugging, ensure that the installation site can meet the in
stallation requirements.
a
GESAARRAMIRSN RA. Wil, RAST HD Jail, MUON
Ae
(3)Responsible for the equipment installation, debugging, technical index test, triage, trai
n u -ceptance and delivery to the buyer for use within 5 days.
(NRMHARAMGS, RADA RRTREWRAA LARAMSHR, ARR.
(4)After the goods arrive at the delivery site, our company personnel shall install and deb
ug the equipment, the buyer shall provide the unloading of the machine, and the person
rel shall have room and board.
(OQUBRRAE, RATANRSTARTESARARSINANSARREKG, tH
ARASH LEH THRREB.
(®)After the installation and debugging , our company shall first carry out self-inspection
of the equipment, and after the technical indicators meet the technical requirements of t
he contract, both parties shall conduct acceptance and use of the equipment.
“|() REOR, CAFES, OM, OA, ie. BATRADE, HBL TBOWMBE
‘BBL.
(2) MA, Ba. APM. KSieG, SSBMRBSPHER.
(3) SHOREAN-HEBRAESHRESEE. FAREPMARSKHERAHARAS
A. RESEARE, SHEEOREA.
(1) standard packing, suitable for long-distance bus transportation, moisture-proof, rust-proof a
nd shock-proof. Applicable to the whole lifting, and indicate the lifting center of gravity and |
ifting parts.
(2) transportation method, Air transportation, automobile transportation, railway transportation,
sea transportation according to customer needs.
(8) A detailed packing list and quality certif tate shall be attached to each package. The equ
ipment instruction and ail other documents and materials are enclosed in the packing case. T
he packing list is outside the packing box and the certif tate of conformity is inside the pack
ing box.
2.64 S12 BH Packaging.transportation and equipment installation
3.BRMISMRFive stor fost service system
R24. ATK. —EIOSAMA A AM OTME BS OD ZA SWART IS. Wat
WEAR, IB Lea
24/7 service, someone will answer the repair call at any time, within 10 minutes, a professional techn
ical engineer to reply:1 hour to determine the maintenance plan,1 working day engineer dispatched.
ERPREWRS: MESPAMAR, TACERSAR,
RSLAIMMEGA: S—-SRAL LSPS, REL,
SLAMS: RMELELS, KS LAAM RR HALL AIS sil,
St—-N-BS: CHF RHRRLIEPMUBS, DASRMSAAESSPeRag,
RE: RE-RMRE, AI RieH.
Exclusive customized service: customized service plan is made according to the specif t situation of
customers;
Service engineer certif cation system: each service engineer after strict training and assessment, wit
ha certificate;
FAQ training: according to the equipment model, the FAQ will be made into a book and trained by th
e certified engineer to the customer;
Online one-to-one guidance: experienced senior engineers guide customers to solve problems by tel
ephone, video and other network methods;
Once is good: the equipment is debugged once, similar problems are fixed once.
HBR: BSAA HS, SAMS ZHI ARAB RRREES. EPL RU,
MARS: EMAAR. SLITS. SHH
ARS: REREAHRRS, BRB RRS. TERRI
Pre-service: operation training of theory + practical operation, self-diagnosis training of common faul
| LaShandong Alles CNC pe ne PCO ee eet
ts, quick repair guidance of difficult faults, reminder of use matters ;
Regular service: regular maintenance reminder, regular door-to-door service, regular promotional ac
tivities;
Value-added services: hardware and software upgrade , f nancial leasing services, delayed warranty
services.Shandong Alles CNC
1, kB _ Introduction
ALT IOMMT SORT, &
SOHRNSODOOT A, AaMRACE RTA
RIOT FOOSE, we
SMSO REMI. RO. wR
aM, GUNNS, QUST
FRSS MONE, RESOOOIRMER
AREOURRRREMKR, ATL
thrmeMR.
. SMH corporate strength
‘Shandong ALES CNC has independent machining w
‘orkshop and sheet metal workshopcovering an area
of about 30,000 square meters. We have invested te
1s of millions of yuan to build a modem machining w
‘orkshop and sheet metal workshop, with a number
f precision five-axis machining center, gantry milling,
boring and milling machine, bending machine and ot
her advanced, automatic equipment. Shandong ALL
ES fully carry out fine management of "6S", cooperat
with [S09001 quality management system and inte
llectual property standard management system, so a
sto establish a strict quality assurance system.indong Alles CNC
2, MKF RH Products
Hard guide way CNC lathe
Slont bed end inecr guide way CNC lathe High precision slant bed ene athe
= . -
Hard guide way CNC athe Flt bed inecr guide way CNC lathe Hard guide woy CNC lathe
a
=F
as
ALCKserieslarge CNC lathe One-plece casting and hard guide way CNC lathe
‘one piece casting and hard guide woy CNC lathe
High precision large scale CNC lathe
large CNC the3.BK
ERIM Shipment in Europe‘HthithER A242 Shipment in other regions4, S8BIRIEMedia coverage
OER RUE ATM m
GW, QSPRS, ER
RSTO, ERT
WRIA. 2017 520184
FoR ESOL RDS THE, IM
BT SuSE
RHR TUR RRO OTA
SWER RENEE, ARURER
HoRRats. SIERO TI
OMSSEN, Base EMWOR
A REBIRTH
CNC lathe industry isa green new eneray industry song
ly supported by the state. As the pioneer in north China, A
LLES CNC has been committed to driving the productivit
y of the industry with scientific and technological innovati
Con and continuously contributing its own strength to the |
athe industry. Reports by CCTV and Shandong satelite TV
in 2017 and 2018 confirmed the value of Shandong ALLE
Sin the industry
The report shows that Shandong ALLES CNC achieves th
e enterprise development with 100% annual growth rate
rough independent innovation, highlighting the courage
‘and wisdom of Shandong ALLES CNC high-end equipme
It, leading the north China CNC lathe industry to enter th
e world industry, and leading the north China CNC lathe
manufacturing industry to accelerate and leap towards thAlles CNC pe ne PCO ee eet5. iE
ALLES CNC i8i¢'T fb] B PESGSiIAE
ALLES CNC has passed Alibaba SGS certification:
https://www.youtube.com|watch?v=tNvW7iZ0a%Alles CNC pe ne PCO ee eetAlles CNC ee
Tonos acct
4H, KAAXContact information
BRAM: +86 15966602397
thy Pm, SPIRBSBIS: 0531-55535866 ae’ mm