Awarded But not Start

Status as on 01 June, 2023


All Lengths in Km.
S.no Project Name NH Total Length LOA Date Concessioner Name State
Bangalore Chennai Expressway (Phase-II Pkg-II) from
1 km.96.000 to Km 127.000 (Baireddypalle to TBD 31 15/09/2021 APCO Infratech Pvt. Ltd. Andhra Pradesh
Bangarupalem section)
4L of Kadapa – China Orampadu section of NH-716 Lakshmi Infrastructure & Developers
2 716 64.2 24/03/2023 Andhra Pradesh
(Package I of Kadapa-Renigunta section) India Pvt. Ltd.
4 L of China Orampadu-Renigunta section of NH-716 Lakshmi Infrastructure & Developers
3 716 57.735 24/03/2023 Andhra Pradesh
(Package-II of Kadapa-Renigunta section) India Pvt. Ltd.
6L Access Controlled Greenfield Highway from Kodur
4 (Ch. 0+000) to Vanavolu (Ch. 24+300) of [NH-544G] 544G 24.3 31/01/2023 Dilip Buildcon Ltd. Andhra Pradesh
(Package-1)
6L Access Controlled Greenfield Highway from
Megha Engineering and
5 Yerragudipadu (Ch. 129+000) to Audireddipalle (Ch. 544G 31 28/02/2023 Andhra Pradesh
Infrastructure Ltd.
160+000) of [NH – 544G] (Package-6)
6L Access Controlled Greenfield Highway from
Megha Engineering and
6 Nallacheruvu palli (Ch. 96+300) to Yerragudipadu (Ch. 544G 32.7 28/02/2023 Andhra Pradesh
Infrastructure Ltd.
129+000) of [NH-544G] (Package-5)
6L Access Controlled Greenfield Highway from
7 Odulapalle (Ch. 72+000) to Nallacheruvu-palli (Ch. 544G 24.3 31/01/2023 Dilip Buildcon Ltd. Andhra Pradesh
96+300) of [NH-544G](Package-4)
6L Access Controlled Greenfield Highway from
8 Vankarakunta (Ch. 45+700) to Odulapalle (Ch. 72+000) 544G 26.3 31/01/2023 Raj Path Infracon Pvt. Ltd. Andhra Pradesh
of [NH-544G](Package-3)
6L Access Controlled Greenfield Highway from Vanavolu
9 (Ch. 24+300) to Vankarakunta (Ch. 45+700) of [NH- 544G 21.4 31/01/2023 Raj Path Infracon Pvt. Ltd. Andhra Pradesh
544G] (Package-2)
6L Access Controlled Greenfield Highway from
Megha Engineering and
10 Narayanmpet (Ch. 203+500) to Chandrasekharpuram 544G 24.5 29/03/2023 Andhra Pradesh
Infrastructure Ltd.
(Ch. 228+000)(Package-10)
6L Access Controlled Greenfield Highway from
Max Infra (I) Limited - Bekem Infra
11 Kavulakuntla (Ch. 196+000) to Narayanmpet (Ch. 544G 7.5 31/03/2023 Andhra Pradesh
Projects Pvt. Ltd. (Consortium)
203+500)(Package-09)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6L Access Controlled Greenfield Highway from
Megha Engineering and
12 Mallapalle (Ch. 176+000) to Kavulakuntla (Ch. 196+000) 544G 20 29/03/2023 Andhra Pradesh
Infrastructure Ltd.
(Package-08)
6L Access Controlled Greenfield Highway from
13 Audireddipalle (Ch. 160+000) to Mallapalle (Ch. 544G 16 31/03/2023 Dilip Buildcon Ltd. Andhra Pradesh
176+000)(Package-07)
6L Access Controlled Greenfield Highway from
Megha Engineering and
14 Polavaram (Ch. 260+000) to Marripudi (Ch. 285+500) of 544G 25.5 28/02/2023 Andhra Pradesh
Infrastructure Ltd.
[NH-544G](Package-12)
6L Access Controlled Greenfield Highway from
Megha Engineering and
15 Chandrasekharapuram (Ch. 228+000) to Polavaram (Ch. 544G 32 28/02/2023 Andhra Pradesh
Infrastructure Ltd.
260+000)of [NH-544G] (Package-11)
6L Access Controlled Greenfield Highway from
Megha Engineering and
16 Somavarappadu (Ch.314.600) to Muppavaram 544G 28.64 28/02/2023 Andhra Pradesh
Infrastructure Ltd.
(Ch.343+240) of [NH-544G] (Package-14)
6L Access Controlled Greenfield Highway from
17 Marripudi (Ch. 285+500) to Somavarappadu (Ch. 544G 29.1 28/02/2023 KNR Constructions Limited Andhra Pradesh
314+600) of [NH-544G] (Package-13)
4L PS Mydukur - Badvel from Km 585.820 to Km 630.960
18 67 45.14 16/08/2022 RITHWIK-NSPR Consortium Andhra Pradesh
of NH-67
6L of Kumarajapet to Veera Kaveri Raja Puram from km
19 716B 17.58 28/08/2021 EKK Infrastructure Limited Andhra Pradesh
43.800 to km 61.380 of NH-716B (Pkg-II)
4L of Pileru to Kalur Section from Km 55.900 to Km Megha Engineering and
20 71 38.117 29/03/2022 Andhra Pradesh
92.800 & Km 94.500 to Km 95.717 of NH-71(Package-II) Infrastructure Ltd.
Development of 4L Road from Samarlakota to
Achampeta Junction as part of Kakinada Port
21 516F 12.25 29/09/2022 Rail Vikas Nigam Limited Andhra Pradesh
Connectivity to NH-16 (Rajanagaram Junction) in East
Godavari District
4L Access controlled Highway From Vakalpudi Light Aurobindo Realty & Infrastructure
22 House to Annavaram (on NH-16) section of NH-516F 516F 40.621 31/03/2023 Private Limited - KMC Constructions Andhra Pradesh
(From Km0+000 to Km40+621) Limited (JV)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6L of Naidupeta Junction - Turpukanupur Section from
23 71 34.881 13/02/2023 APCO Infratech Pvt. Ltd. Andhra Pradesh
km 57.046 to km 91.927
4Lof Chillakuru Cross Road to Turpu Kanupuru (Part 1
,Pkg-II) from Km 0.00 to Km 23.770 including 6L flyover
Megha Engineering and
24 and approaches on NH-16 and 6L of Turpu kanupuru to 516W 36.065 30/01/2023 Andhra Pradesh
Infrastructure Ltd.
Port South Gate (Part 2,Pkg-II) from Km 91.910 to Km
103.154
Improvement of 4L road to 6L road and 4L dedicated
25 Port Roads for the Port connectivity road from Convent 516C 9.58 14/03/2023 RKD Construction Pvt. Ltd. Andhra Pradesh
junction to Sheelanagar Junction
Repair And Rehabilitation Of Ambedkar Centenary
26 Bridge, Nehru Centenary Flyover & Ramp-A Flyover on 516C 10.35 02/03/2023 FRP-Tech india Private Limited Andhra Pradesh
Port Road, Visakhapatnam
Construction of Flyover/Underpass at Vizag Airport
SVS Mookambika Constructions
27 Junction to ensure Flow of container trailers to/from 16 1.935 31/03/2023 Andhra Pradesh
Private Limited
MMLP setup at NH-16
4L Greenfield Road connecting North and South
industrial cluster of Khandaleru Creek near
Krishnapatnam port at Thamminapatnam to Mollur AMR India Limited in JV with Rithwik
28 516W 15.95 31/03/2023 Andhra Pradesh
from Km 0.0 to Km 16.046, Part I & 6L extension of Projects Private Limited
dedicated port road of NH-67 (Km 18.0 to Km 19.3, Part
II)
4L Access Controlled Greenfield Highway section on NH-
163G (Khammam– Vijayawada) from Remidicherla Megha Engineering and
29 163G 29.709 29/03/2023 Andhra Pradesh
village at Design Ch. 280.200 Km to Jakkampudi village Infrastructure Ltd.
(on NH-16) at Design Ch. 309.909 Km (Package-III)
Rehabilitation and upgradation of 4L with PS from
30 Anantapur(Km.0.000) to Muchukota(Km.37.000) 544D 37 08/12/2022 SRC Infra Developers Private Limited Andhra Pradesh
(Package-I) of NH-544D
Rehabilitation and up gradation from
Megha Engineering and
31 Muchukota(Km.37.000) to Bugga(Km.69.000) (Package 544D 32 08/12/2022 Andhra Pradesh
Infrastructure Ltd.
II) to 4L PS of NH-544D
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L PS from Kurnool (Existing Km. 5.400 of NH- 40/Design
PSK Infrastructures and Projects
32 Km.0.000) to Mandlem (Existing Km.38.000/Design Km NH 340C 30.6 29/03/2023 Andhra Pradesh
Private Limited
30.600) of NH-340C (Package-1)

4L PS from Mandlem (Existing Km. 38.000/Design


PSK Infrastructures and Projects
33 Km.30.600) to Atmakur (Existing Km.73.000/Design Km NH 340C 35.515 29/03/2023 Andhra Pradesh
Private Limited
66.115) of NH-340C (Package-2)
Rehabilitation work for Damaged Road sections AS-
27(KM 40+000 to KM 60+500),AS-25 (KM 83+400 to KM
34 NH-54 1.034 17/03/2023 Dhariwal Buildtech Limited Assam
111+000),AS-24 (KM 111+000 to KM 126+450) & AS-23
(KM 126+450 to KM 140+700)
Permanent rectification of 3 nos. of black spots in
project Highway NH-27 of U.P border - Dewapur - Kotwa
section from Km.360.915 to km.440.000 (Total Length of
35 79.085 Km) of NH-27& Permanent rectification of 5 nos. 27 13.604 03/03/2023 EVRASCON - UARPL JV Bihar
of black spots of project Highway NH-27 of Kotwa -
Mehsi - Muzaffarpur Section from km.440.000 to
km.520.000 (Total length 80.00Km) of NH-27
6L Greenfield Varanasi-Ranchi-Kolkata Highway from
36 Anarbansalea village to Sagrampur village (From KM. TBD 33.5 31/03/2023 G R Infraprojects Limited Bihar
151+200 to KM. 184+700)(Package-7)
6L Greenfield Varanasi-Ranchi-Kolkata Highway from
37 Pachmon village to Anarbansalea village (From KM. TBD 35.2 31/03/2023 PNC Infratech Pvt. Ltd. Bihar
116+000 to KM. 151+200) (Package-6)
6L Greenfield Varanasi-Ranchi-Kolkata Highway from
junction with Chandauli-Chainpur Road near Khainti
38 TBD 27 31/03/2023 PNC Infratech Pvt. Ltd. Bihar
village to junction with Bhabhua-Adhaura road near
Palka village (from Km. 27.000 to Km. 54.000) (Pkg-2)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6L Greenfield Varanasi-Ranchi-Kolkata Highway from
39 junction with Bhabhua-Adhaura road in Bhairopur village
Yet to be decided 36 31/03/2023 PNC Infratech Pvt. Ltd. Bihar
to Konki village (From KM. 54.000 to KM. 90.000)(Pkg-3)

6L Bridge and its approaches across River Ganga as Part


40 of Patna Ring Road (NH-131G) starting from Km 8.480 131G 14.52 27/03/2023 Singla constructions Limited Bihar
near Sherpur to Km 23.000 near Dighwara

4L Greenfield Alignment of Shivrampur to Ramnagar Megha Engineering and


41 119D 54.322 22/03/2022 Bihar
from Km. 55.002 to Km. 109.300 of NH 119 D (Pkg-II) Infrastructure Ltd.
4L of Greenfield Alignment from Km. 45.000 to Km.
Ram Kripal Singh Construction Pvt.
42 89.090 of Tal Dashara to Bela Nawda Section of NH- 119D 42.21 06/05/2022 Bihar
Ltd
119D
Rehabilitation and Upgradation of Chroma - Bairgania
43 Section of National Highway No 227F to 2 lane with 227 F 34.566 27/03/2023 Dhariwal Buildtech Limited Bihar
paved shoulders from Design Ch.0.000 to Ch. 34.566

4L Elevated Corridor and at-grade improvements from


Design Ch:0+000 to Design Ch: 19+870 of Danapur –
Bihta Section, Design Ch:0+000 to Design Ch:0+231
connecting the existing RoB near Danapur station ,1.35
44 Km ramps and at-grade improvements to 4-lane section 922 25.081 25/01/2023 Ashoka Buildcon Limited Bihar
on Danapur side and Upgradation of existing Two lane
carriageway to Four Lane carriageway from Design
Ch:19+870 to Design Ch:23+500 of Bihta - Koilwar
section
4L of Siwan- Masrakh section of Ram Janki Marg from Megha Engineering and
45 227A 50.12 29/12/2022 Bihar
Km 230.385 to Km 281.391 of NH-227A Infrastructure Ltd.
Umagaon-Saharsa (Package-I) Umagaon-Basopatti- Ram Kripal Singh Construction Pvt.
46 227L and 227J 47.745 31/03/2022 Bihar
Kaluahi & Sharghat-Benipatti-Rahika Ltd
S.no Project Name NH Total Length LOA Date Concessioner Name State
Umagaon-Saharsa (Package-II) Rahika & Madhubani Ram Kripal Singh Construction Pvt.
47 527A 14.88 31/03/2022 Bihar
Bypass (Rahika-Pokharauni-Rampatti) Ltd
Umagaon-Saharsa (Package-III) Bideshwar Asthan (NH- Ram Kripal Singh Construction Pvt.
48 527A 26.04 30/03/2022 Bihar
27, E-W) to Bheja Ltd
Umagaon-Saharsa (Package-V) Bakaur-Parsarma-
49 327E 39.08 29/12/2022 Dhariwal Buildtech Limited Bihar
Bangaon-Bariyahi & Spur to Mahishi
Umagaon - Saharsa Package - I (Combined) Umagaon-
Kaluahi(0.000KM to 21.609Km) of NH227L;Saharghat-
Rahika(0.000 Km to 26.130KM) of NH227J;Rahika- Ram Kripal Singh Construction Pvt.
50 227L 88.655 30/03/2022 Bihar
Rampatti (0.00 KM to 15.00KM) of Ltd
NH527A;Bideshwarsthan-Bheja(0.000KM to 25.915KM)
of NH527A.
Durg-Raipur Bypass Section (Package - 1) from km. 0.00 SMS Ltd. in JV with Mehrotra
51 53 44.5 27/12/2022 Chhattisgarh
to km. 44.50 (near Tendesara to near Khatti Village) Buildcon Pvt. Ltd.
Durg-Raipur-Arang Package - 2 from km. 44.50 to km. Kalyan Toll Infrastructure Ltd. -
52 53 47.73 27/12/2022 Chhattisgarh
92.23 (near Khatti Village to near Aurang) Shelke Construction (JV)
4L of Urga - Pathalgaon from Km. 70.200 to km. 157.745
53 130A 87.545 16/12/2022 Dilip Buildcon Ltd. Chhattisgarh
of NH-130A
Development of 6L of Basanwahi – Marangpuri Section
54 130CD 25.161 30/03/2022 KMV Projects Ltd. Chhattisgarh
from km 99.500 to km 124.661 of NH-130-CD

Vadodara Mumbai Expressway (Jujuwa to Gandeva)


55 NE-4 36 27/05/2021 Roadway Solutions India Infra Ltd. Gujarat
(Phase IB - Pkg VIII) [Km 154.600 to Km 190.000]

Vadodara Mumbai Expressway (Karvad to Jujuwa)


56 NE-4 26 30/07/2021 Roadway Solutions India Infra Ltd. Gujarat
(Phase IB - Pkg IX) [Km 128.000 to Km 154.600]

Widening to 6L of Existing 4L Jetpur - Gondal - Rajkot Engineering Projects (India) Ltd. -


57 27 67.4 31/03/2022 Gujarat
Section from Km. 117.600 to Km. 185.00 on NH-27 Varaha Infra Limited (JV)
6L with PS of Samakhiyali to Santalpur section from km.
58 27 90.4 24/02/2023 IRB Infrastructure Developers Ltd. Gujarat
339.700 to Km. 430.100 of NH-27
S.no Project Name NH Total Length LOA Date Concessioner Name State
Construction of Greenfield Connectivity to Jewar
59 International Airport from DND-Faridabad-Ballabhgarh 148NA 31.43 01/08/2022 APCO Infratech Pvt. Ltd. Haryana
Bypass KMP Link - Spur to Delhi Mumbai Expressway
60 4L PS of Ambala Ring Road of New NH-44 44 22.524 27/03/2023 Ram Kumar Contractor Haryana
61 Karnal ring road (Lot-4/Pkg-1) 44 34.5 29/12/2022 H.G. Infra Engineering Limited Haryana
4L Ismailabad to Ambala Section of NH-152 (Lot- Amar infrastructure Ltd. - PS
62 152 42.5 27/03/2023 Haryana
4/Package-1) Constructions JV
Construction of service road near Guru Jambeshwar
University at Hisar from km.178.850 to km.180.050
63 09 1.2 09/03/2023 Suraj Construction Company Haryana
(LHS) and from km.179.450 to km. 180.050 (RHS) on
Hisar-Dabwali section of Old NH-10 (new NH-09)
Construction of Vehicular Underpass (VUP) (6-Lane) 1
64 No on Hisar-Dabwali section of old NH-10 (new NH-09) 09 57 29/05/2023 Himalayan Infracorp Private Limited Haryana
at Chainage-218+276
6L access Controlled Greenfield Highway from Ranipur
65 Barsi to Adhoya Musalmana section of Shamli -Ambala 344GM 38.9 29/07/2022 APCO Infratech Pvt. Ltd. Haryana
(Package-II) (Design Ch. Form km 45.500 to km 84.400)

Operation & Maintenance of Rohtak-Panipat section of


66 709 80.858 04/05/2022 DS Enterprise Haryana
NH-709 (Old NH-71A) from Km. 0.000 to Km. 80.858
4L (Greenfield) Jalbhera – Shahbad section from km.
67 152G 22.85 02/06/2022 Ceigall India Ltd. Haryana
0.000 to km. 22.850 of NH-152G
68 4L Bhiwani-Hansi road section of NH-148B NH-148B 42.934 07/03/2023 Gawar Construction Ltd Haryana
Junction Improvement works at 02 locations i.e. Chirao
69 Mod and Nagla Chowk on Jind-Karnal section in the 709A 1 25/05/2023 Welkin India Incorporate Haryana
State and Haryana
Improvement of section from km 173.050 to 177.770
(design ch. 42.280 to 47.000) and from km 212.130 to
70 NH-334B 97.864 29/03/2023 Suraj Construction Company Haryana
213.130 (design ch. 81.360 to 82.360) of Jhajjar-Loharu
section of NH-334B
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L Ambala - Kalaamb from Km. -0.800 to Km. 33.015 of
71 344 33.815 28/11/2022 DCC Infra Projects Limited Haryana
old NH-72
Overlay work on Jagadhri-Poanta Sahib old NH-73A
(New NH-907) form Km 2.500 to Km 5.000 and from Km.
72 907 11.255 06/04/2023 Mahipal Construction Co. Haryana
5.000 to Km. 7.520 LHS and from Km.9.400 to Km
15.635
Rectification of 11 nos. of Blackspots on 6L Panipat-
73 4,444 2 27/12/2022 Dhingra Brothers (India) Haryana, Punjab
Jalandhar Section of NH-1 from KM 96.000 to 387.000
Installation of Traffic Impact Attenuators in the State of
74 44 291.1 23/01/2023 Dhingra Brothers (India) Haryana, Punjab
Haryana on Pilot basis.
Rectification/closure of unauthorized Median Cuts and
unauthorized access from Main Carriage on Six laning of
75 44 9.05 25/05/2023 Satish Aggarwal & Co Haryana, Punjab
Panipat-Jalandhar old NH-1 (New NH-44) from Km
96.000 to Km 387.100 (length-291.100 km)
Rehabilitation and Upgradation to 4L configuration &
76 Strengthening of Sihuni to Rajol from Km 51.000 to Km 154 18.45 25/03/2022 Gawar Construction Ltd Himachal Pradesh
72.000 of NH-154
Rehabilitation and Upgradation to 2L PS configuration &
77 Strengthening of Padhar to Bijni section from Km 154 19.05 20/07/2022 Gawar Construction Ltd Himachal Pradesh
180.000 to Km 202.815 of NH-154 (Pkg-VA)

Rehabilitation and Up-gradation to 4L configuration & Universal Contractors and Engineers


78 Strengthening of Thanpuri to Paror section from Km 154 16.275 10/08/2022 Private Limited - Shree Riddhi Siddhi Himachal Pradesh
85.135 to Km 100.840 of NH-154 (Pkg-IIC) Buildwell Ltd (JV)
2L PS of Hamirpur Bypass from Km 121.175 to
79 103 17.12 07/10/2022 Jandu Construction India Pvt. Ltd. Himachal Pradesh
Km.138.295 of NH-103&3
One Time Improvement from km. 79.000 to 95.000 on
to be bypassed section from Brahmpukhar (Km 71.00 )
80 205 16 15/03/2023 State PWD Himachal Pradesh
to Bhager Flyover (km 97.300) section of NH-88 on
Shimla Mataur corridor to HP PWD
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L of Shakral Village to Dhalli Section from Km 146.300
Gawar Construction Ltd. - Bharat
81 to Km 156.560 (Shimla Bypass - Pkg II) and Shimla 05 10.985 11/07/2022 Himachal Pradesh
Construction (India) (P) Ltd. (JV)
connectivity from Km 0.000 to Km 0.725 of NH-5

4/6L Access Control Expressway from Design Chainage


Km 515.000 to 528.300 (Kunjwani to Sidhra Section of
82 144 28.92 01/08/2022 APCO Infratech Pvt. Ltd. Jammu and Kashmir
NH-44) and from Design Chainage Km 550.900 to Km
566.520 (Domel to Katra Section) (Phase II-Package XVII)

Delhi Amritsar Katra Expressway (Phase-II Pkg XVIII)


Development and Upgradation of Four lane Access
83 44 15.3 21/03/2023 Gawar Construction Ltd Jammu and Kashmir
Control Expressway from Design Chainage KM 530.00 to
KM 545.300 (Sidhra to Domel Section of NH-44)

2L NH-1 from km 8.660 to km 33.775 (Sumbal to Wayul)


Rajinder Infrastructure Private
84 to 4L dual carriageway NH standard as part of Srinagar 44 25.1 13/01/2023 Jammu and Kashmir
Limited - Satish Aggarwal & Co. (JV)
Ring Road Phase–II [Design Ch. 41.907 to Ch. 66.609]
Construction of twin tube tunnels on Jammu Kashmir
Ring Road (NH-244A) Between Design Ch. 50+600 to
85 51+700 and design Ch. 53+535 to 55+700 on EPC mode 244A 3.36 03/03/2023 Bharat constructions (India) pvt. Ltd Jammu and Kashmir
under residual NHDP component of Bharatmala
Pariyojna
4L of Ormanjhi-Gola section from Km 81.450 to Km
86 320B 27.85 29/03/2022 Barbrik Projects Ltd. Jharkhand
53.600 of NH- 320B(PKG-II)
4L of Gola-Bokaro(Jaina More) section from Km 53.600
87 320 32.49 29/03/2022 NG Projects Ltd. Jharkhand
to Km 21.110 of NH-320(PKG-1)
6 Lane Greenfield Varanasi- Ranchi- Kolkata Highway
from Donoreshan village to junction with NH-20 in
88 TBD 36.9 31/03/2023 Ceigall India Ltd. Jharkhand
Bongabar village from km 288.600 to km 325.500 (Pkg -
11)
6 Lane Greenfield Varanasi- Ranchi- Kolkata Highway
89 from Deoria village to Donoreshan village from km TBD 35.6 31/03/2023 H.G. Infra Engineering Limited Jharkhand
253.000 to km 288.600 (Pkg -10)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6 Lane Greenfield Varanasi- Ranchi- Kolkata Highway
Ram Kripal Singh Construction Pvt.
90 from Chatra to junction with NH- 100 in Deoria village TBD 31 31/03/2023 Jharkhand
Ltd
from km 222.000 to km 253.000 (Pkg -9)
6L Greenfield Varanasi- Ranchi- Kolkata Highway from
Tracks & Towers Infratech Private
Sonepurbigha village to junction with NH- 22( Chatra
91 TBD 37.3 31/03/2023 Ltd. - Rail Vikas Nigam Limited Jharkhand
Bypass) near Chatra from km 184.700 to km
(Consortium)
222.000(Pkg -8)
6L Greenfield Varanasi- Ranchi- Kolkata Highway from
junction with NH-20 in Bongabar village to junction with
92 TBD 33 31/03/2023 Ceigall India Ltd. Jharkhand
NH-30 in Lepo village from km 325.500 to km 358.500
(Pkg -12)
6L Greenfield Varanasi- Ranchi- Kolkata Highway from
junction with NH-320 in Lepo village to Kamlapur
93 TBD 28.7 31/03/2023 H.G. Infra Engineering Limited Jharkhand
village(JH/WB border) from km 358.500 to km 387.200
(Pkg -13)
4L from Km 219.600 (Khajuri) to Km 260.483
94 75 41.06 29/04/2022 MG Contractors Pvt. Ltd. Jharkhand
(Wyndhamganj) on NH-75 (Sec-V)
4L from Km 147.450 (Bhogu) to Km 196.870 (Sankha) on Dineshchandra R. Agrawal Infracon
95 75 49 31/10/2022 Jharkhand
NH-75 (Sec-III) Pvt. Ltd.
4L from Km 95.400 (Udaipura) to Km 147.450 (Bhogu) Dineshchandra R. Agrawal Infracon
96 75 52 29/03/2023 Jharkhand
on NH-75 (Sec-II) Pvt. Ltd.
Rectification of Blackspot (JH-02-033) by Construction of
97 Ramps (Slip Roads) to Kothar-Bridge from Km. 89.500 to 33 0.5 29/11/2022 Jai Mata Dee Construction Jharkhand
Km. 90.000 of NH-33
98 4L of Basukinath- Deoghar Section of NH-114A 114A 45.16 17/03/2023 Gawar Construction Ltd Jharkhand
4L/6LBypass for Belagavi city from km 11.773 (km 11
99 Goa side of NH-4A)to km. 46.253 (km 516 Pune side of TBD 34.48 29/03/2023 G R Infraprojects Limited Karnataka
NH-4) (design length 34.480 km)– Pkg-I
Bangalore Ring Road (STRR)-NH-948A- Package-I of
Montecarlo Vadodara Mumbai
100 Phase-III from Belagondapalli (TN) to TN/KNT border 948A 35.489 30/03/2022 Karnataka
Expressway Private Limited
from km 144.480 to 179.969
S.no Project Name NH Total Length LOA Date Concessioner Name State
4 Lane with PS from Des. Ch 228.500 to Des. Ch.
101 273.400 of Belgaum-Hungund-Raichur Section of NH 748 748A 44.9 29/03/2023 GR Infraprojects Ltd Karnataka
A (Package-6 )
4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500
102 of Belgaum-Hungund-Raichur Section of NH 748 A 748A 46.2 29/03/2023 GR Infraprojects Ltd Karnataka
(Package-5)
4L of Left-Over Works of Hospet-Bellary -Karnataka/AP
103 border from Km.280.080 (Dec.Ch.) to 67 95.37 29/03/2023 SRC Infra Developers Private Limited Karnataka
Km.375+450(Des.Ch.) of NH-63 (New-67)
Road connectivity from Kasarkoda side of Honavar Port
104 66 4.58 08/12/2021 Viva Infraventure Pvt. Ltd. Karnataka
to NH-66 at Km 195.5
4L PS from near Hemmige Village Periyapatna - Hassan
Ramalingam Construction Company
105 Road Jn. to near Hunsur - KR Nagar Jn section from Km. 275 24.1 10/03/2023 Karnataka
Pvt. Ltd
144.900 to Km. 169.000 of NH-275 ( Pkg. III )
4L PS from Near Guddehosur to Start of Kushalnagara
Bypass to near Hemmige Village Periyapatna - Hassan
106 275 22.7 10/03/2023 KMC Construction Ltd. Karnataka
Road Jn from Km. 122.200 to Km. 144.900 of NH-275 (
Pkg. II )
4L PS from near Hunsur - KR Nagar Junction to near
107 Yalachahalli village KR Nagara - Yelawala Road Junction 275 26.55 10/03/2023 KNR Constructions Limited Karnataka
fcrom Km 169.000 to Km 195.550 of NH-275 (Pkg-IV)
4L PS from near Yalachahalli village KR Nagara - Yelawala
Road junction to Srirangapatna Bypass Near Paschima
108 275 18.985 10/03/2023 KNR Constructions Limited Karnataka
Vahini from km 195.550 to Km 214.535 of NH-275 (Pkg-
V)
Akkalkot – MH/KN border New Greenfield corridor from
Karnataka,
109 Km 512.000 to Km 548.400 of NH-150C (part of Akkalkot 150C 36.4 29/03/2023 G R Infraprojects Limited
Maharashtra
– KN/TS Border section) (Package – XIV)
S.no Project Name NH Total Length LOA Date Concessioner Name State
Widening/Development of Existing NH-85 from Km
0.000 to Km 124.636 section to 2L/@L+PS section in the
110 85 124.636 19/12/2022 EKK Infrastructure Limited Kerala
state of Kerala on EPC Mode under Bharatmala
Pariyojana
111 Rayroo - Nayagaon (103+200km to 130+100km) 46 28.35 04/10/2018 R R Infraa Construction Madhya Pradesh
Improvement of bypassed town portions in Shivpuri-
112 Guna (Kolaras, Lukwasa, Badarwas) & Guna-Biaora( 3 16.5 18/02/2021 DIC-NCC Madhya Pradesh
Ruthiyai and Binagan) section of NH-3
Maintenance of road passing through Sarangpur City
113 52 7.2 20/07/2020 Shri Sanjay Vijayvargiya Madhya Pradesh
Portion
Construction of additional 3 lane with paved shoulder
(design length 8.87 km) as realignment of Bakaner ghat
Kaluwala Construction Private
114 (between Indore to Khalaghat Section from existing Km 52 8.87 31/03/2023 Madhya Pradesh
Limited
59+190 to Km 66+120) of NH 52 (Old NH 3) on EPC
mode in the State of Madhya Pradesh
Megha Engineering and
115 Indore - Edlabad (Pkg-II) [Tejajinagar to Balwara] 347BG 33.4 31/03/2022 Madhya Pradesh
Infrastructure Ltd.
4L Boregaon Buzurg to Shahpur (Pkg I of Boregaon
116 753L 47 23/12/2022 Kalyan Toll Infrastructure Ltd. Madhya Pradesh
Buzurg to Muktainagar) of NH 753L
4L Shahpur to Muktainagar from Km. 186.000 to km BNA Infrastructure Pvt. Ltd. in JV
117 216.278 of NH 753L (Pkg II of Boregaon Buzurg to 753L 30.14 23/03/2023 with Agroh infrastructure Madhya Pradesh
Muktainagar) Developers Pvt. Ltd.
4L Greenfield Rudhi to Deshgaon (Pkg V of Betul- DG Belhekar and Company - Shree
118 Greenfield 28.68 16/02/2023 Madhya Pradesh
Khandwa/Deshgaon) Associates (JV)
(i) 4L Vidisha to Hinotiya from km 0.000 to Km 27.000
(Vidisha – Mehulwa-Talbehat Pkg-I) Section of NH- 346
119 1,46,346 47.476 24/03/2023 Bansal Construction Works Pvt. Ltd. Madhya Pradesh
and (ii) 4L Vidisha to Morikori from Km 39.000 to 59.476
section of NH-146
4- Laning of Mohari to Satai Ghat section NH-934 from
Shree Girrajjee Infra Heights Private
Km 50+300 to Km 89+875 (Total length 39.575 km)
120 34 39.575 31/12/2022 Limited in JV with Jeet Asia Private Madhya Pradesh
(Package-2) in the State of Madhya Pradesh on EPC
Limited
Mode
S.no Project Name NH Total Length LOA Date Concessioner Name State
4 -Laning of MP/UP Border to Kabarai section of NH-
34&35 from km 197.000 to km 242.991 (Length= 45.991
121 34 45.991 24/03/2023 Bansal Construction Works Pvt. Ltd. Madhya Pradesh
Km) (Sagar-Kabrai Package-5) under Bharat Mala
Pariyojana (EC) in MP & UP on HAM
Outer Ring Road of Jabalpur Town from Manegaon to
122 TBD 20.53 31/03/2023 NKC Projects Private Limited Madhya Pradesh
NH-45 (Pkg-2)
Outer Ring Road of Jabalpur Town from NH45 to
123 TBD 36.3 20/03/2023 ISC Projects Pvt. Ltd. Madhya Pradesh
Kushner (Pkg-3)
Outer Ring Road of Jabalpur Town from Kushner to
124 TBD 23.47 30/03/2023 Vijai Construction (India) Pvt. Ltd. Madhya Pradesh
Amjhar Road including Airport Connectivity (Pkg-IV)
Shreeji Infrastructure India Pvt. Ltd. -
Indore - Harda (Pkg-II) [Raghavgarh to Nanasa from km.
125 47 63.67 27/03/2023 PRL Projects & Infrastructure Pvt. Madhya Pradesh
29.30 to km. 92.30]
Ltd.
2L PS of Hinotiya-Mehulwa section of NH-346 from Km.
126 27.000 to Km 75.700 (Vidisha – Mehulwa-Talbehat Pkg- 346 48.7 24/03/2023 SMC Infrastructures Private Limited Madhya Pradesh
II) Section of NH- 346
4L PS Balaghat- Gondia Section from Km. 0.00 to Km.
127 543 41.21 29/03/2023 Shiv Build India Pvt. Ltd. Madhya Pradesh
41.210 of NH-543
4L of Indora Chowk to Pachpaoli and Agrasen Chowk -
128 44 8.9 27/03/2023 NCC Limited Maharashtra
Ashoka Chowk
4L PS from existing km 88.400 (Savali Vihir) to km Rudranee Infrastructure Ltd. -
129 160 75 22/02/2023 Maharashtra
163.400 (start of Ahmednagar bypass) section of NH-160 Manisha Construction Co. (JV)

4L of Ratnagiri - Kolhapur section from km 67.140 to km J M Mhatre Infra Pvt Ltd - Thakur
130 166 45.2 30/03/2022 Maharashtra
112.340 of NH-166 (Pkg – II) Infraprojects Pvt. Ltd. (JV)
4L of Ratnagiri - Kolhapur section from km 112.340 to Megha Engineering and
131 166 32.96 29/03/2022 Maharashtra
km 145.300 of NH-166 (Pkg–III) Infrastructure Ltd.
4L of Bamni - Rajura - Warur - Devada upto M.S. Border
132 930D 33.425 30/03/2022 GR Infraprojects Ltd Maharashtra
of NH - 930D (from km 19.000 to km 52.425)
S.no Project Name NH Total Length LOA Date Concessioner Name State
One time improvement of existing highway of Jamankira
bypass from Km.514+110 to Km.517+540 of Teleibani -
133 NH-53 3.43 24/03/2023 Ashok kumar Jalan Odisha
Sambalpur section of NH-06 (New NH-53) in the State of
Odisha
Construction of 6 lane PUP including RE Wall approaches
134 at Km. 152.590 in Luhamunda Village of Angul 55 1.22 01/03/2023 Agrawal Infrabuild Private Limited Odisha
Sambalpur section of NH 55
Development of road connectivity from Chhatrapur on
135 16NB 6.47 31/03/2023 Shivam Condev Pvt Ltd. Odisha
NH-16 to Gopalpur Port (Greenfield alignment)

Construction of Underpass at Km.06+853 along with


136 approaches from Km.06+205 to Km.07+495 on Panikoili- 20 1.29 15/11/2022 Shivam Condev Pvt Ltd. Odisha
Rimuli Section of NH-215 (New NH-20)

Construction of Underpass at Km. 100.880 along with


137 approaches from Km.100.370 to Km.101.260 on 20 0.89 16/11/2022 Durga Condev Pvt Ltd. Odisha
Panikoili-Rimuli Section of NH-215(New-NH-20)

Rehabilitation and Up gradation from 4 to 8 laning of


138 Chandikhole – Paradip Section of NH-53 (Old NH – 5A) 53 21 31/03/2023 Rajbir Construction Private Limited Odisha
from Km.39.000 to Km.60.00 (Package-3)
Rehabilitation and Up gradation from 4 to 8 laning of
Chandikhole – Paradip Section of NH-53 (Old NH – 5A) PSK Infrastructures and Projects
139 53 21 31/03/2023 Odisha
from Km 18.00 to Km 39.00 in the State of Odisha on Private Limited
HAM mode (Package-2)
Rehabilitation and Up gradation from 4 to 8 laning of
140 Chandikhole – Paradip Section of NH-53 (Old NH – 5A) 53 18 31/03/2023 Agrawal Infrabuild Private Limited Odisha
from Km.0.00 to Km.18.00(Package-1)
Construction of LVUP at Baisingha (Km.339+360) in the
Kumar Piyush Construction Private
141 stretch of End of Kamakhyanagar bypass to Duburi 53 0.8 15/12/2022 Odisha
Limited
section of NH-53 in the state of Odisha
S.no Project Name NH Total Length LOA Date Concessioner Name State
Delhi-Amritsar-Katra Expressway (Phase-I Pkg-XII) from
Junction with Amritsar-Mehta-SriHargobindpur-Tanda OJSC Euro-Asian Construction
142 road (NH-503A) near SriHargobindpur to Junction with 503A , 54 35.28 23/04/2021 Corporation Evrascon - MKC Punjab
Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km Infrastructure Ltd. (JV)
362+420 to km 397+700)

Delhi-Amritsar-Katra Expressway (Phase-I Spur-II) from


Junction with Kapurthala- TarnTaran road(NH703AA)
Ceigall India Ltd. - Krishna
143 near Goinwal Sahib to Junction with AmritsarJalandhar 3 30 12/05/2021 Punjab
Constructions (JV)
road (NH-3) near Bhishambarpura [Km 41+000 to Km
71+000 of Amritsar connectivity]

Costruction of 3L ROB at Km. 0.440 i/c widening


construction of VUP at Km. 0.400 & ramps at LHS & RHS
144 44 0 20/04/2021 KRC Infraprojects Pvt. Ltd. Punjab
and merging of alignment with PAP flyover at Km. 0.710
on Panipat - Jalandhar section of NH-44
FOB near Bus Stand ISBT at design km 4.900 of Elevated
145 Samrala Chowk section of NH-95 (new NH-05) in the 95 0.1 15/11/2022 Preeti Buildcon Pvt. Ltd. Punjab
State of Punjab
6L of Jodhpur Romana (Bathinda) - Mandi Dabwali
146 (Punjab Haryana Border) section of NH-54 from km. 54 27.4 26/02/2021 Ceigall India Ltd. Punjab
0.000 to km. 27.400 of NH-54
6L Amritsar-Bathinda Greenfield section from Jn. with
Moga Jalandhar road (NH-703) near Dharamkot to Jn.
147 NH-754A 54 23/09/2021 Krishna Constructions. Punjab
with Bhagta Bhai Ka-Bhadaur Road near Dyalpura Bhai
Ka from km 39.000 to km 93.000 of NH-754A (Pkg-2)
6L Amritsar-Bathinda Greenfield section from Jn. with
Bhagta Bhai Ka-Bhadaur Road near Dyalpura Bhai Ka to
148 Jn. with Mandi Dabwali Bathinda Road on NH-54 near NH-754A 61.866 22/09/2021 Krishna Constructions. Punjab
Sangat Kalan from km 93.000 to km 154.866 of NH-754A
(Pkg-3)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6L of Southern Ludhiana bypass connecting NE-5 and NH-
149 44 , NE-5 25.24 02/06/2022 Ceigall India Ltd. Punjab
44
6L Access Controlled Ludhiana-Bathinda Greenfield
highway from Jn. with Amritsar-Bathanda Greenfield
150 Road (NH-754A) near Rampura Phul to Jn. with Moga- NH754AD 30.3 11/11/2021 Ram Kumar Contractor Punjab
Barnala Road (NH-703) near village Tallewal from Km 0.0
to Km 30.3 of NH-754AD (Pkg-1)

6L Access Controlled Ludhiana-Bathinda Greenfield


highway from Jn. with Moga-Barnala Road (NH-703)
151 near village Tallewal to Jn. with Delhi-Katra Expressway NH-754AD 45.243 09/11/2021 Ceigall India Ltd. Punjab
(NE-5) near Ludhiana (village Ballowal) from Km 30.300
to Km 75.543 of NH-754AD (Pkg-2)
Repair and Overlay work on Existing portion of Proposed
zirakpur Bypass sectionof PR-07 starting from Birchatt Rajinder Infrastructure Private
152 PR-07 5 01/04/2023 Punjab
Junction from Km.0.000 to Km 5.000 in the state of Limited
Punjab
Construction of 4L VUP at Bhankarpur Junction at
Gaanesh Kartikey Construction
153 Km.33.275 on Ambala-Chandigarh section of Old NH-22 152 0.865 24/01/2023 Punjab
Private Limited
(new NH-152)
4/6L Greenfield Ludhiana–Rupnagar Highway from Jn.
with NE-5 village near to Manewal (Ludhiana) to Jn. with
154 NH-205 near Bheora Village (Rupnagar) from Km 37.7 to 205K 47.24 31/12/2021 Ceigall India Ltd. Punjab
Km 66.0 i/c spur to Kharar with Ludhiana bypass from
Km 0.0 to Km 18.5 of NH-205K(Pkg-2)
Prakash Asphaltings and Toll
155 4L of Phagwara - Hoshiarpur 344B 48.622 29/03/2023 Punjab
Highways (India) Ltd.
6L of Ambala-Chandigarh greenfield section from Km.
0.000 to Km. 25.000 with 4L spur to Lalru from Km.
156 TBD 30.828 14/12/2022 VRC Constructions (India) Pvt. Ltd. Punjab
0.000 to Km. 5.828 & spur to PR-7 road from Km. 0.000
to Km. 11.157
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L of Fazilka to Abohar section of NH-07 including
157 07 44.96 23/03/2023 Gawar Construction Ltd Punjab
construction of Greenfield Abohar & Fazilka Bypasses

4L of Beas-Mehta-Batala-Dera Baba Nanak from


intersection with Jalandhar-Amritsar Highway (NH-3) Ganeshgarhia Construction Private
158 TBD 31.3 25/03/2022 Punjab
near Beas till start of Batala Bypass near Village Acchhal Limited
(from Km. 0.000 to Km. 31.300) (Pkg-1)

4L of existing Beas – Baba Bakala - Dera Baba Nanak


Section from start of Batala Bypass till intersection with
159 Ajnala Gurdaspur Highway (NH 354) near Dera Baba NH - 503D 47.8 31/03/2022 Varaha Infra Ltd. Punjab
Nanak ( from Km. 31.300 to Km. 69.100 ) with Additional
batala Bypass (Pkg-II)
Megha Engineering and
160 2/4L of Ghoman-Tanda 503A 31.5 31/03/2022 Punjab
Infrastructure Ltd.
2L/4L of Hoshiarpur to Una section including Hoshiarpur Amar infrastructure Ltd. - PS
161 503A 27.923 29/03/2023 Punjab
Bypass of NH 503A Constructions JV
Construction of VUP Service road at km.17.325 in village
162 344A 1.083 23/01/2023 Associated Engineers Punjab
Behram on Phagwara- Rupnagar section of NH-344A

6L Elevated highway from km 414.000 (Beas) to km


438.850 (Jandiyala) including VUP at km 432.300 at
Gaanesh Kartikey Construction
163 Chouhan and flyover at km 425.880 at Khilchanon on 3 1.62 30/11/2021 Punjab
Private Limited
Amritsar Jalandhar section from km 413.100 to km.
439.990 of NH-03 New (Rectification of Blackspot)
6L access controlled Highway from Km 40+080 to Km Joint Stock Company Industrial
164 148B 46.433 30/01/2023 Rajasthan
86+513 (Mator to Barodameo Section) Association Vozrozhdenie
6L accesscontrolled highway from km 0+000 to km
Joint Stock Company Industrial
165 40+080 (Paniyala to Mator Section) of Paniyala- 148B 40.08 30/01/2023 Rajasthan
Association Vozrozhdenie
Barodameo ICR
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L of left-over works including additional structures
166 from Kerala/Tamil Nadu border to Kanyakumari Section 66 23.67 31/03/2023 M. Muthukrishnan, Tirunelveli Tamil Nadu
from Km 43.0 to Km 96.174 of NH66
Mahabalipuram - Pondicherry (Pkg-II) [Mugaiyur to
167 332A 31 10/11/2021 SPL Infrastructure Pvt. Ltd Tamil Nadu
Marakkanam]
6L of Tuticorin Port Road section of NH-7A (New NH-
168 138 6 31/03/2023 P.S.T Engineering Construction Tamil Nadu
138) from Km 0.000 to Km 6.140
Balance works in AP Portion and punch list items in TN &
169 205 7.35 24/02/2023 Lekcon Infrastructure Pvt. Ltd. Tamil Nadu
AP portion of NH-205
4L of Karimnagar-Warangal section from km 49.500 to
170 563 68.32 15/12/2022 Dilip Buildcon Ltd. Telangana
km 117.820 of NH-563
4L Access Controlled Greenfield Highway Section
(Mancherial – Warangal) from Pangidipalle village at Megha Engineering and
171 163G 39.89 29/03/2023 Telangana
Design Ch. 72.350 Km to Oorugonda village at Design Ch. Infrastructure Ltd.
112.240 Km(Package-III)
4L Access Controlled Greenfield Section (Mancherial –
Warangal) from Puttapaka village at Design Ch. 35.300 Megha Engineering and
172 163G 37.05 29/03/2023 Telangana
Km to Pangidipalle village at Design Ch. 72.350 Infrastructure Ltd.
KmPackage-II)
4L Access Controlled Greenfield Section (Mancherial –
Megha Engineering and
173 Warangal) from Narva village at Design Ch. 3.834 Km to 163G 31.466 29/03/2023 Telangana
Infrastructure Ltd.
Puttapaka village at Design Ch. 35.300 Km (Package-I)

4L Access Controlled Greenfield Highway section on


NH163G (Warangal-Khammam) from Oorugonda village
Megha Engineering and
174 in Hanamkonda District at Design Ch. 112.240 Km to 163G 38 31/03/2023 Telangana
Infrastructure Ltd.
Venkatpur village in Warangal District at Design Ch.
150.240 Km(Package-I)
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L Access Controlled Greenfield Highway section on NH-
163G (Warangal-Khammam) from Venkatpur village in
175 Warangal District at Design Ch. 150.240 Km to 163G 39.41 31/03/2023 G R Infraprojects Limited Telangana
Thallasenkesa village in Mahabubabed District at Design
Ch. 189.650 km(Package-II)
4L Access Controlled Greenfield Highway section on NH-
163G (Warangal-Khammam) from Thallasenkesa village
176 at Design Ch. 189.650 km to V.Vekatayapalem village in 163G 30.83 31/03/2023 VDB Projects (P) Ltd. Telangana
Khammam District at Design Ch. 220.480 Km(Package-
III)
Dineshchandra R. Agrawal Infracon
177 Khammam - TL/AP Border TBD 50 29/03/2022 Telangana
Pvt. Ltd.
4L Access Controlled Greenfield Highway section on NH-
163G (Khammam– Vijayawada) from V. Venkatayapalem Dineshchandra R. Agrawal Infracon
178 163G 29.92 29/03/2023 Telangana
village at Design Ch. 220.480 Km to Brahmanapalli(K) Pvt. Ltd.
village at Design Ch. 250.400 Km (Package-I).

4L Access Controlled Greenfield Highway section on NH-


163G (Khammam – Vijayawada) from Brahmanapalli(K) Megha Engineering and
179 163G 29.8 29/03/2023 Telangana
village at Design Ch. 250.400 Km to Remidicherla village Infrastructure Ltd.
at Design Ch. 280.200 Km(Package-II)
Megha Engineering and
180 Hyderabad - Maneguda 163 46.39 17/03/2022 Telangana
Infrastructure Ltd.
Construction of Ring Road around Kanpur from
181 Ch.68.650 to Ch.93.209 (Jarkala to Pakari) (Package-IV) TBD 24.559 29/03/2023 Raj Corporation Ltd. Uttar Pradesh
in State of Uttar Pradesh.
Construction of Ring Road around Kanpur from Km.000
182 to Km. 23.325 (Chachendi Sachendi I to Maharajpur) TBD 23.325 29/03/2023 RCL - PPIL JV Uttar Pradesh
(Package-I)
S.no Project Name NH Total Length LOA Date Concessioner Name State
4L Green Field Northern – East side Gorakhpur Bypass
183 (26.616 Kms) starting from NH-29E (Chainage 83.308) NH-29E 26.616 29/03/2023 Vijai Construction (India) Pvt. Ltd. Uttar Pradesh
and end at NH-28 (Chainage 285.100)
6L full access control provisions in stretches from
184 Saharanpur bypass to Ganeshpur section of NH-344 344 13.89 28/02/2023 SHRI KRISHNA AND COMPANY Uttar Pradesh
(package-1)
6L access Controlled Greenfield Highway from Gogwan
Jalalpur (Shamli) to Ranipur Barsi (Saharanpur) of Shamli
185 344GM 44.9 29/07/2022 Raj Shyama Constructions Pvt. Ltd. Uttar Pradesh
-Ambala section (Package-I) (Design Ch. Form km 00.600
to km 45.500)
Construction & upgradation of carriageway km 180.200
186 to 188.700 of Raebareli - Prayagraj section of NH-30 (Old 30 8.5 20/03/2023 P. P Pandey Infrastructure Pvt. Ltd. Uttar Pradesh
NH-24B)
4L of Bareilly-Pilibhit-Sitarganj from Km. 0.000 to Km.
187 30 32.5 28/03/2023 Raj Corporation Ltd. Uttar Pradesh
32.500 of NH-30 (Pkg-1)
Improvement and Up-Gradation of Existing Road to 4L
188 PS from Km 123.650 to 175.080, from Start of Shahabad 731 51.43 30/11/2022 Raj Corporation Ltd. Uttar Pradesh
Bypass to End of Hardoi bypass of NH 731 (Pkg-2B)
Improvement and Up-Gradation of Existing Road to 4L
PS from Km 88.750 to 123.650, from Start of
189 731 34.9 30/11/2022 Raj Corporation Ltd. Uttar Pradesh
Shahjahanpur Bypass to start of Shahabad bypass of NH
731(Pkg.-2A)
4L from Devinagar Bypass (End) (Existing Km. 208.000 of
NH 530B/Design Km. 66.000) to Kasganj Bypass (End)
190 530B 57.97 29/03/2023 G R Infraprojects Limited Uttar Pradesh
(Existing Km.150.100 of NH 530B/ Design Km. 123.100)
of NH 530B
Construction of Four Lane Highway form Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Ravi Infrabuild Projects Private
191 NH-31 42.5 12/12/2022 Uttar Pradesh
Package I [from Hridaipur (km 0.000) to Shahapur (km Limited
42.500)] on EPC Mode in the state of Uttar Pradesh.
S.no Project Name NH Total Length LOA Date Concessioner Name State
Construction of Four Lane Highway from Ghazipur- Ballia-
UP/Bihar State Border (Greenfield) section of NH-31: Ravi Infrabuild Projects Private
192 NH-31 35.65 23/01/2023 Uttar Pradesh
Package II [from Shahapur (km 42.500) to Pindari (km Limited
78.150)] on EPC Mode in the state of Uttar Pradesh.

Construction of Four Lane Highway from Ghazipur- Ballia-


UP/Bihar State Border (Greenfield) section of NH-31:
193 Package III [from Pindari (km 78.150) to Rawalganj NH-31 38.97 30/11/2022 NKC Projects Private Limited Uttar Pradesh
Bypass (Km 117.120)] on EPC Mode in the state of Uttar
Pradesh.

Construction of Four Lane Highway from Ghazipur- Ballia-


UP/Bihar State Border (Greenfield) section of NH-31:
194 NH-31 17.27 07/12/2022 BCPL-PRL (JV) Uttar Pradesh
Package IV [from Buxur Spur of length km 17.270 on EPC
Mode in the state of Uttar Pradesh.

4L (Greenfield) Western Side spur of Rampur-Rudrapur Dev Yash Projects and Infrastructure
195 Section from Km 0.000 to Km 13.700 connecting NH-24 - 13.7 04/03/2022 Pvt. Ltd. - Raj Shyama Constructions Uttar Pradesh
to NH-87 bypassing rampur town Pvt. Ltd. (JV)
Meerut - Najibabad from km. 39.24 to km. 86.59 of NH-
196 119 39.56 29/03/2023 Gawar Construction Ltd Uttar Pradesh
119 (Pkg-II)
2L PS of Najibabad Kotdwar section from 112.575 to Km.
197 119 15.56 23/03/2022 AJAY PRAKASH ASSOCIATES Uttar Pradesh
138.635 of NH 119
4L of Moradabad-Thakurdwara-Kashipur Section from
198 734 38.77 07/12/2022 Raj Corporation Ltd. Uttar Pradesh
Km. 0.000 to Km. 38.77 of NH-734 (Pkg-II)
4L of Kashipur Northern side spur connecting NH-734 & Raj Corporation Ltd. & PRL Projects
199 734 14.49 29/03/2023 Uttar Pradesh
NH-121 (Pkg-III) Infrastructure Limited (JV)

4L of Moradabad western side spur connecting NH-734


200 734 33.724 07/12/2022 KCC Buildcon Pvt. Ltd. Uttar Pradesh
& NH-24 from Km. 0.000 to Km. 33.200 (Pkg-I)
S.no Project Name NH Total Length LOA Date Concessioner Name State
6L Greenfield Varanasi-Ranchi-Kolkata Highway from
junction with NH-19 & Varanasi Ring Road near Rewasa
201 Yet to be decided 27 31/03/2023 NKC Projects Private Limited Uttar Pradesh, Bihar
village to junction with Chandauli-Chainpur road near
Khainti village (from Km. 0.000 to Km. 27.000) - Pkg-1
4-laning of Pilibhit - Sitarganj from Km. 32.500 to Km. Uttar Pradesh,
202 30 38.3 27/03/2023 Raj Corporation Ltd.
70.800 (Pkg-2) of NH-30 Uttarakhand
203 4L Rudrapur bypass from km. 0.00 to km. 21.476 TBD 20.64 29/03/2023 Gawar Construction Ltd Uttarakhand
Road Improvement work by DBM & BC of Rishikesh-
Bhaniyawala section with DBM/BC from Km.12.00 to
204 Km 16.00 of NH-07 Spur Falling under Proposed Four 07 4 15/03/2023 State PWD Uttarakhand
laning of Bhainwaya- Jollygrant- Rishikesh Section of
New NH 07 Spur
Kona elevated Expressway from 0.557 km to 7.163 km of
205 117 7 31/03/2023 Rail Vikas Nigam Limited West Bengal
NH-117 (7 km)