Professional Documents
Culture Documents
Rubrics
Rubrics
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 2 of 243
6 Online Assessment
Page 3 of 243
Temp/ Permanent
v Page 5 of 243
Set
4 M Measure the amplitude, time Completely incorrect - 0 Check with 2
period and frequency of the Only amplitude is correct - 1 the given
time varying signals Only time current value is correct – 1 value
Both amplitude, frequency, time
period are correct – 2
5 J Developing model for electri- Completely incorrect-0 - 2
cal system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 8 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Guidelines/Task Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 14 of 243
6 Online Assessment
Page 15 of 243
Temp/ Permanent
Page 17 of 243
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects - 1
i) Clean up Workspace as listed in i, ii, iii
ii)Respectful and do not cause dis- 0.33 – demonstrated little of 3
ruption to others aspects or only one
iii) Ensure actions of self do not 0.66 – demonstrated the 3
compromise the safety of others aspects
1 – Strong demonstration of all
3 aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Construct the circuit using Tinker Calculation of BJT & MOSFET Check with 2
cad parameters is same -2 the standard
Select the virtual breadboard and Calculation Component pa- value
place the required electrical & rameter is same – 1
electronics components in selected Connection of component us-
virtual breadboard ing jumped wires is same - 1
Connect the components using No parameters are matched - 0
wires in the virtual breadboard
4 M BJT & MOFET act has a Switch Completely incorrect - 0 Check with 2
Switch the input voltage to 0V of the Only voltage is correct - 1 the given
transistor and observe the state of Only current value is correct value
the LED –1
Switch the input voltage to 5 V of Both voltage and current are
the transistor and observe the state correct - 2
of the LED
Measure and record the base cur-
rent Is, collector current Ic and the
collector-emitter voltage VCE
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of compo- Completely incorrect-0 - 2
nents in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its subcompo- Completely incorrect-0 - 2
nents Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 2
-
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 2
-
Partial-1, Accurate-2
Total marks 20
Page 19 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Guidelines/Task Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 26 of 243
Page 27 of 243
6 Online Assessment
Page 28 of 243
Temp/ Permanent
Page 30 of 243
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as 1
i) Clean up Workspace listed in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 as-
disruption to others pects or only one -
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 1
-
Partial-0.5, Accurate-1
3 M Select the Arduino PWM using Calculate the duty cycle and config- 2
tinker cad ure the PWM pins is same -2 Check with
Connect the breadboard Calculate the duty cycle is same - 1 the standard
Negative to the GND of the
configure the PWM pins is same - 1 value
PWM
No parameters are matched – 0
4 M Configure the PWM pin and Completely incorrect – 0 2
write the code using Tinker cad Only Pin configuration is correct - 1 Check with
Only Coding value is correct – 1 the given
Both Configuration and coding are value
correct – 2
5 J Developing model for electri- Completely incorrect-0 2
cal system Partial-1 -
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 2
Partial-1 -
Accurate-2
7 J Completely incorrect-0 2
Select and arrangement of Partial-1 -
components in Tinker CAD Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 2
Partial-1 -
Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 2
components Partial-1 -
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 2
Partial-1 -
Accurate-2
11 J Workplace setup Completely incorrect-0 2
Partial-1 -
Accurate-2
Total marks 20
Page 34 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 40 of 243
6 Online Assessment
Page 41 of 243
Temp/ Permanent
Page 43 of 243
Aspect
SI. type Aspect of description Requirement Max. Awarded
No. (M or J) Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not 0.33 – demonstrated little of 3 aspects
cause disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5
Accurate-1
3 M Select the AC power Supply, Select power source, Suitable AC-DC Check with 2
Signal generator converter, Level 1 AC-DC converter the standard
Select the Suitable converters Coding is same -2 value
using Tinker Cad Calculation of Power source & Suitable
converter is same – 1
Write a Level 1 charger cod- Write a code for Level 1 AC-DC con-
ing for AC-DC converter and verter- 1
dump into hardware kit / No parameters are matched – 0
Arduino kit
4 M Measure Waveforms for gat- Completely incorrect – 0 Check with 2
ing pulses Ig1, source voltage Only Gate pulse waveform is correct - 1 the given
Vs , load voltage Vo,Load cur- Only current & Voltage is correct – 1 value
rent Io ,Voltage Across SCR
Both Gate pulse, Load voltage, load
T1 with R/RL/RC load using
current is correct – 2
CRO/Oscilloscope
5 J Developing model for Completely incorrect-0 - 2
electrical system Partial-1
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1
Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1
Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1
Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1
Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1
Accurate-2
Total marks 20
Page 49 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 54 of 243
6 Online Assessment
Page 55 of 243
Temp/ Permanent
Page 56 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 66 of 243
6 Online Assessment
Page 67 of 243
Temp/ Permanent
Page 68 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 78 of 243
6 Online Assessment
Page 79 of 243
Temp/ Permanent
Page 80 of 243
Assessment Pattern:
Aspect
SI. type Aspect of description Requirement Max. Awarded
No. (M or J) Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as - 1
i) Clean up Workspace listed in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3
disruption to others aspects or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5
Accurate-1
3 M Design Thyristor circuit and Select components needed for Thy- Check with 2
generate some of its key wave- ristor circuit - 1 the standard
forms and Design a Buck/boost converter value
A Voltage source and generate the waveforms -2
Control circuit with a Thyristor Select components needed for Thy-
switching device ristor circuit - 1
Design a converter is same – 1
No parameters are matched – 0
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Arduino and Execute Arduino Executing code correct - 1 the given
Code Only output/waveform is correct – 1 value
Both code and waveforms are
Do the physical implementation correct – 2
of BMS Circuit for a Single Li-ion
Battery
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 86 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 90 of 243
6 Online Assessment
Page 91 of 243
Temp/ Permanent
Page 92 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 102 of 243
6 Online Assessment
Page 103 of 243
Temp/ Permanent
Page 104 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 aspects
disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design a Wireless charging Select components needed for wire- Check with 2
circuit for battery charging less charging and Thyristor circuit - 1 the standard
Connect the battery charger at and Design a Buck/boost converter value
the output of the circuit. and generate the waveforms -2
Design Thyristor circuit and Select components needed for Thyris-
generate some of its key tor circuit - 1
waveforms Design a converter is same – 1
A Voltage source No parameters are matched – 0
Control circuit with a Thyristor
switching device
Observe the charging of the
battery
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Arduino and Execute Arduino Executing code correct - 1 the given
Code Only output/waveform is correct – 1 value
Do the physical implementa- Both code and waveforms are correct
tion of Wireless Charging –2
Circuit for Battery Charging
5 J Developing model for electri- Completely incorrect-0 - 2
cal system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 110 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 114 of 243
6 Online Assessment
Page 115 of 243
Temp/ Permanent
Page 116 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not 0.33 – demonstrated little of 3 aspects
cause disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety 1 – Strong demonstration of all 3 as-
of others pects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design a solar power battery Design a solar panel - 1 Check with 2
charging station Design a solar power battery charging the standard
Observe the solar power and station and generate the waveforms -2 value
output voltage Select components needed for Thyristor
circuit - 1
Design a converter is same – 1
No parameters are matched – 0
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Arduino and Execute Arduino Executing code correct - 1 the given
Code Only output/waveform is correct – 1 value
Do the physical implementa- Both code and waveforms are correct
tion of solar power battery –2
charging station
5 J Developing model for Completely incorrect-0 - 2
electrical system Partial-1
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1
Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1
Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1
Accurate-2
9 J Wiring of Circuit and its Completely incorrect-0 - 2
subcomponents Partial-1
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1
Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1
Accurate-2
Total marks 20
Page 122 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 126 of 243
6 Online Assessment
Page 127 of 243
Temp/ Permanent
Page 128 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 aspects
disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design Battery pack for EV Select components needed for DC-DC Check with 2
compatible for Level 1/2/3 buck converter- 1 the standard
Charging and Design a Buck/boost converter value
A Voltage source and generate the waveforms -2
Control circuit with a high- Select components needed for DC-DC
speed switching device buck converter- 1
A transformer (primary side Design a converter is same – 1
connected to control circuit No parameters are matched - 0
and secondary side connected
to filtering circuit)
4 M Do Physical Implementation Completely incorrect - 0 Check with 2
of the Battery pack and its Executing code correct - 1 the given
Compatible circuit Only output/waveform is correct – 1 value
Both code and waveforms are correct
–2
5 J Developing model for electri- Completely incorrect-0 - 2
cal system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 134 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 138 of 243
6 Online Assessment
Page 139 of 243
Temp/ Permanent
Page 140 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as - 1
i) Clean up Workspace listed in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 as-
disruption to others pects or only one
iii) Ensure actions of self do not 0.66 – demonstrated the 3 aspects
compromise the safety of others 1 – Strong demonstration of all 3
aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design A Real – Time SOC Esti- Select components needed for DC- Check with 2
mation circuit DC buck converter- 1 the standard
A Voltage source and Design a Buck/boost converter value
Upload the Code into Arduino and generate the waveforms -2
and Check in Serial Monitor for Select components needed for DC-
result DC buck converter- 1
Design a converter is same – 1
No parameters are matched - 0
4 M Select PWM Control Using Ar- Completely incorrect - 0 Check with 2
duino and Execute Arduino Code Executing code correct - 1 the given
Do Physical implementation of Only output/waveform is correct – 1 value
SOC Real Time Estimation circuit Both code and waveforms are
correct – 2
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1
Accurate-2
7 J Select and arrangement of com- Completely incorrect-0 - 2
ponents in Tinker CAD Partial-1
Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1
Accurate-2
9 J Wiring of Circuit and its subcom- Completely incorrect-0 - 2
ponents Partial-1
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1
Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 146 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 150 of 243
6 Online Assessment
Page 151 of 243
Temp/ Permanent
Page 152 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 162 of 243
6 Online Assessment
Page 163 of 243
Temp/ Permanent
Page 164 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 174 of 243
6 Online Assessment
Page 175 of 243
Temp/ Permanent
Page 176 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 186 of 243
6 Online Assessment
Page 187 of 243
Temp/ Permanent
Page 188 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 198 of 243
6 Online Assessment
Page 199 of 243
Temp/ Permanent
Page 200 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 aspects
disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design A Fast Charging Circuit Select components needed - 1 Check with 2
A Voltage source and Design Fast charging circuit -2 the standard
Arrange and Fix all the compo- Select components needed for Fast value
nents and Test accordingly to Charging- 1
the Simulation result Design a converter is same – 1
No parameters are matched - 0
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Arduino and Execute Arduino Executing code correct - 1 the given
Code Only output/waveform is correct – 1 value
Both code and waveforms are correct
Do Physical implementation of – 2
Fast Charging Circuit
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1
Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1
Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1
Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1
Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1
Accurate-2
Total marks 20
Page 206 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 210 of 243
6 Online Assessment
Page 211 of 243
Temp/ Permanent
Page 212 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as - 1
i) Clean up Workspace listed in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3
disruption to others aspects or only one
iii) Ensure actions of self do not 0.66 – demonstrated the 3 aspects
compromise the safety of others 1 – Strong demonstration of all 3
aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Construct the circuit using Tinker Calculation of BJT & MOSFET pa- Check with 2
cad rameters is same -2 the standard
Select the virtual breadboard Calculation Component parameter value
and place the required electri- is same – 1
cal & electronics components in Connection of component using
selected virtual breadboard jumped wires is same - 1
Connect the components using No parameters are matched - 0
wires in the virtual breadboard
4 M BJT & MOFET act has a Switch Completely incorrect - 0 Check with 2
Switch the input voltage to 0V of Only voltage is correct - 1 the given
the transistor and observe the Only current value is correct – 1 value
state of the LED Both voltage and current are cor-
Switch the input voltage to 5 V rect - 2
of the transistor and observe the
state of the LED
Measure and record the base cur-
rent Is, collector current Ic and the
collector-emitter voltage VCE
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of com- Completely incorrect-0 - 2
ponents in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its subcom- Completely incorrect-0 - 2
ponents Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 214 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 aspects
disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design A Real – Time Predic- Select components needed for DC-DC Check with 2
tion circuit for Battery Opera- buck converter- 1 the standard
tion and Design a Buck/boost converter value
Connect to a Voltage source and generate the waveforms -2
Upload the Code into Wi-Fi Select components needed for DC-DC
Module and check for the con- buck converter- 1
nectivity and GPS data Design a converter is same – 1
No parameters are matched - 0
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Wi-Fi Module and Execute Executing code correct - 1 the given
Arduino Code Only output/waveform is correct – 1 value
Do Physical implementation of Both code and waveforms are correct
Integration of EV Charging –2
Stations into Grid through IOT
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1
Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1
Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1
Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1
Accurate-2
9 J Wiring of Circuit and its Completely incorrect-0 - 2
subcomponents Partial-1
Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 218 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 222 of 243
6 Online Assessment
Page 223 of 243
Temp/ Permanent
Page 224 of 243
Assessment Pattern:
Aspect
SI. type Requirement Max. Awarded
No. (M or J) Aspect of description Extra aspect of description (M only) marks marks
1 J Work place safety: 0 – Don’t display all 3 aspects as listed - 1
i) Clean up Workspace in i, ii, iii
ii)Respectful and do not cause 0.33 – demonstrated little of 3 aspects
disruption to others or only one
iii) Ensure actions of self do 0.66 – demonstrated the 3 aspects
not compromise the safety of 1 – Strong demonstration of all 3
others aspects
2 J Arranging the workplace Completely incorrect-0 - 1
Partial-0.5, Accurate-1
3 M Design A Data Logger for the Select components needed for DC-DC Check with 2
Battery pack for performance buck converter- 1 the standard
estimation and Design a Buck/boost converter value
A Voltage source and generate the waveforms -2
Upload the Code into Arduino Select components needed for DC-DC
and Check in Serial Monitor for buck converter- 1
result Design a converter is same – 1
No parameters are matched - 0
4 M Select PWM Control Using Completely incorrect - 0 Check with 2
Arduino and Execute Arduino Executing code correct - 1 the given
Code Only output/waveform is correct – 1 value
Do Physical implementation Both code and waveforms are
of Data Logger for the Battery correct – 2
pack to estimate the perfor-
mance
5 J Developing model for electrical Completely incorrect-0 - 2
system Partial-1, Accurate-2
6 J Developing Proto-type model Completely incorrect-0 - 2
Partial-1, Accurate-2
7 J Select and arrangement of Completely incorrect-0 - 2
components in Tinker CAD Partial-1, Accurate-2
8 J Simulating Tinker CAD Completely incorrect-0 - 2
Partial-1, Accurate-2
9 J Wiring of Circuit and its sub- Completely incorrect-0 - 2
components Partial-1, Accurate-2
10 J Neatness of wiring, tagging Completely incorrect-0 - 2
Partial-1, Accurate-2
11 J Workplace setup Completely incorrect-0 - 2
Partial-1, Accurate-2
Total marks 20
Page 230 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement
NAME :
ROLL NO :
DEPARTMENT :
YEAR/ SEM :
BATCH :
SUBJECT NAME :
Page 234 of 243
6 Online Assessment
Page 235 of 243
Temp/ Permanent
Page 236 of 243
Roll No. :
1 Objectives
(If PLC is used) Switch on PLC with no connection and load the
1 program
2 Switch off the power supply & unplug the power cords of all
Do
3 Arrangements of components & tools
Roll No. :
Standard Operating Procedure‐Checklist
Time of Check Sl. No. Criteria Day 1 Day 2 Day 3 Day 4 Day 5
2 Proper Attire
11 Workplace arrangement