You are on page 1of 1

SAS-QUA-FMT-010

Final inspection check list


PROJECT NAME : BLOCK 3 & 4 DEVELOPMENT PROJECT(PHASE II) - OMAN DATE: 24-Feb-2022
CLIENT : CCED S.A.L- OMAN
CONTRACTOR : SEEH AL-SARYA ENGINEERING L.L.C
ITEMS : FLOWLINE CONCRETE SLEEPER (SLA 4 SLEEPER)
Delivery No : 1672 PO#: 029298
AREA / LOCATION : SAS PRECAST YARD, NIZWA
Activity
As per
S.No. ACTIVITY DESCRIPTION Inspection
Drawing/
method
Specification
The precast elements size (length, width, height) and insert Visual/measu
1 YES/NO
items are in correct placement as per specified drawings rement
YES/NO
2 Check for any deflective works or cracks on finished surface Visual

YES/NO
Check for insert items coating thickness and verify with Visual/check
3
coating checklist list

Visual/test YES/NO
4 Check concrete strength using cube test before delivery
reports
5 Check precast elements finishing and repair works Visual YES/NO

6 Check for lifting holes provision (Lifting Hook) Visual YES/NO


YES/NO
7. Check for concrete bottom surface (If any flakes) before delivery Visual

8. Check for foundation / sleeper corner damages Visual YES/NO

Verify precast elements concrete pour card checklist Visual/check YES/NO


9.
before delivery (trace out for casted sleeper / FDN) list

Remarks: Casting Date: 20-Jan-2022: 04 Nos.


Total: 04 Nos.

Verified by SAS Approved by CCED S.A.L


Name: Name:

Designation: Designation:

Signature Signature

Date Date

SEEH AL SARYA ENGINEERING LLC CC ENERGY DEVELOPMENT S.A.L

You might also like