II.

AS PER REVISED DRAWING


RETROFITTING ON BOTTOM OF THE BEAM (INSIDE ABENSON AREA)

ITEM MATERIAL MATERIAL LABOR UNIT


DESCRIPTION QTY UNIT LABOR COST TOTAL COST
NO. UNIT COST COST COST
1.0 6mm thk Steel Plate (.8M X 9.0M - 4 PCS) 2,034.72 kgs
2.0 M10 HSL-3 HEAVY DUTY WEDGE ANCHOR 360.00 pcs
3.0 Chipping of existing concrete for Ms Plate Embedment 21.60 sqm
4.0 Epoxy flowable (leveling) 9.00 set
5.0 Concrete Drilling (Anchor bolts) 360.00 hole
GENERAL PROVISIONS
1.0 Installation & Dismantling of Board-up (per Beam location) 441.00 sqm
2.0 Provision of Trolly for hauling of Plates 1.00 lot
TOTAL COST ADDITIVE (BEAM RETROFITTING INSIDE ABENSON AREA) -

TOTAL NET ADDITIVE AMOUNT (REVISED - ORIGAL) -