North-West Power Generation Company Limited,

Sirajganj 225 MW CCPP (Unit-3)


Active outstanding and O & M issues
Date:06.12.2020

S/N Issue/Agenda/Defect Status

A. Outstanding Issues:

SCADA System still is not completed. CMC will try to completed SCADA work by Februray'2O2l
I
SCADAfiifif:tk6ft,fit +4xn[+28ft.dt,
Different Software's backup, project file, and password not yet provided to NWPGCL.
)
*+kl+ifi&{;, rfr,Elx,f+. #w, rttk+-w&*Nw twil*rs CMC will check together with I & C, NWPGCL.
fhe Keys of ciifferent kinds of lock are not yet handedover to NWPGCL. Ef,uSshirshirfri^+HF.ffi
3
*ffi+tx.ffi+frtu:6i*Htr t4Nw
(pft,f+I )

S? manufacturer documents are in the inconvenient format (.twf) and that can't be printed. Convenient formal
4 [.pdf) of these documents is required.
CMC will request to Dong Fang to get the drawings in printable format. *HiLtEBl+**
f
frllL X'|fr,4+ E. twfffi rt 6t,
T frAfi qr E *1€ fr pdf+* fr Bt ffi )F+
"
hrxsF_
OdtM Manual and drawtngs (FO Ignition s/s, RTU, SCADA' Bus Duct, CEMS, WTP, Fire Water extingushinE
:ontroi cabinet, HSD tank area Foam extingushing control cabinet) not yet provided to NWPGCL. (Annexure. CMC will check together with I & C, NWPCCL., firefighting drawing to be provided
5
r) B f, tl Sshirshirft ii + H E ffi ,*l* # f'fr W ffift +ftffi
6**ffifr8Kffi (FO,#*,*E SIS, RTU, SCADA,E*tH, CEMS, WTP,ZJ<iHffiEfi]ffi, ffii*ffiXEi*
B. Punch List:
m.SG 0m level : Provide alarm system for feed water pumps water leakage which can be monitored from DCS. CMC and NWPGCL jointly will do this.
I
Azl<Fiffiz.l<iEs cMc*ir.Brlnv
;able trench water drainage system sump not provided/ working CMC will check and look possibility to rectifu.
z
ft,ff l" E t4F tLi A nF tK,F *f CMC*&6
TG gen 5 m level: Install filter at generator's breather CMC will ask manufacturer give the clarification
3
IfnHEfi.rsx?-xE €rtiEE CMC*WRTX'6ffi
Cooling tower blow down line shall be completed as per drawing and wastewater shall be keated as per
Done
4 standard rnentioned in the Contact.
Tihx
)$*FBi5zicftWF.fr,
3. R}IS:
Interfacing with online GC and flow computer VSD site service under scheduling
I
r q nnfi E i* 'itfi+XE,&2,3 + lt ifiifitrit vsDIffirtrflAfrflV.XltflJ+
Date and tirne correction in the print report VSD site service under scheduling
2
,fi EitlRfr +TEIr rf IBI H ffi tEffi vsDI'f?rmqfrrffi.X1+fr)+
Replacement of damage regulator RMS 3 Sunnex will fix the valve urhen spare available
3
3 ?nifrt3.trmr+ffi&+fi &4+gt)frffillrfi tLlB
Shortage spare part of RMS 3 Spare pa*s will be shipped within December'2O20
4
3 ? ll!fi#iA &4+41ffi &4+tzBfrRfr.
Damage UC (Level controler) Sunnex will fix the valve when spare available
5
ffiid.B!y&,fnEfi{?$ &4+5\frrtrllifil4lW
Supplier cable PLC of WBH with supervisory computer, and password of computer; Software for WBH & flow
5 computer
VSD will check whether could provide

,
ftEt.rKW fi[ l& **pt-c *, gf *, E& S tr-4, zF friril l& *S, ifr E it Hfifr fi,f+ + vsD*frrxhfri^ffiE+ftffi
Engineering Dossier ladder Sunnex will handle this
7
RMSTEfiffi+ Sunnex *414
D. O&M Issues:
Turbine

of Turbine bearing casing vibration (3lMBDl lCYl0l) is flactuating (Peack Value 12.45 mm/s).
TURB BEARING CSG <3lMBDl lEzzll> alarm appeared on Gas Turbine DCS.
has ordered additional spare. Further test need to proceed to confirm the
( 3 lMBDl 1 Cyl 0 I
)i& il
(d4t6tZ.45mm/s ) &ffi trLDCSt s 4,VB TURB
trffifr*DiilsoxrfrEHEEFE
) +Eg
CMC has provide a new senosr. Siemens also order I additional sensor. The senosr will
PIVOT ARM SENS FLT <3lMBKzlAU00l> alarm appeared on Gas Turbine DCS. be replaced during shutdown opportunity. The root cause for the several times failure to
2
ffi fLncs -L' fi
,fl,plvor ARM SENS FLT<3 I MBK2 1 Au00 I >+R g be identified.

&ffATWHTJLIffL*H&
Lube oil leaks from the intermediate shaft junction box near GT compressor bearing, and it permeates up to the
Spare partavailable in the site. TFA site servcie under scheduling.
J PCC room through the cable.
if{ iB ifi ,I.ffi t/LE'S rrl+S fr pf{ rE E! + l4 +B *9i fi iU iffi ,*
HrtWE Hffi'4frrtpc c H
x4+5\fr, LfrfrF.*trEittlj+

A bad qualit-v alarm appeared on GT DCS regarding Twbine End Thrust Bearing Temperature Sensor
Spare partavailable in the site. TFA site servcie under scheduling.
.iA (31MBDi2CT1058)
ffi fr[Dcs-b., H ]fl ffi Y
"ffiffi
h +frF'iEH& E*$ ffi Afi+V* ( 3 1 MBD I 2cr I 058 ) &l+$\frr, +
^RBV.*6&ittU
During FGMO Qoeration, Gas Turbine inlet pressure doesn't increase quickly with the increase of load, that's
why combustion rnode changes to diffusion from premix. If pressure decreases abruptly (<17.4 bar), there have
Furtehr testing needed to confirm whether issue exist.
5 a risk of the Unit trip.
#.'i[1ffiffifi#-F, ffi+/LADIilrZsfrlWHf!ffiHtlHffim&rB-L.lt, ffit))M- "t*rtil.lfiia{Etr-tr. #Xfr*Difltlit+rJffiE6AHtr
tn RrE i ft ft f'& St]'fft + t7 .4bar,6 Hbfi H'ttrt&

Lube oil leaks from the Lube oil cooler change over valve. Spare partavailable in the site. TFA site servcie under scheduling.
5
il{ iE ifr /+' *P *$*t & trE iffi ,fr &l+ Stivtr, Lfrn1.*tr & if tU +

Hot Air leaks from the Left combustion chamber manhole of Gas Turbine. CMC will request Siemens to address and clarify the issue.
7
ffifiA-If*f*g/.71ffifl5 )ltt*4'**ti[#Hr,f+
Spares took as a loan by CMC and extended warranty for the replaced spares/repaired works (attached as
8 'Spares as Loan") [Ii gh authority decision
cMc,f# fr - " LY &++, -F.l**Mw*l e ff ffiIfi fx ffi E iEK ( ff{,f*r ;

Managernent Hi ghway switch CMC will discuss with Siemens


9
H4t,,ft+Jt cMc*frE ll+fffri^
Inverter of GTG UPS-I is faulty Working on going
l0
ffi +,T H HI'LUPS. I fiq U {
*$ Ti PH ttll+
Steam Turbine:

flow of Auxiiiary cooling water towards the CCCW heat Exchanger is comparatively low. Already provide the clarification on this issue by mail.
I
E HE]IL IE trHiH M[,f+ h \Y.T

Lube oil leakage found at the Low Lube Oil Pressure Tnp Device (i0-meter height) of ST.
7
itrrl ( r 0X ) iB;€,drlE{ffiBbt*H&I&iniffi ,fr

J% bt!fu
STN Issue/AgendalDefect Status

Lube oil leakage suspected at Turning GearlTurbine bearing no-2


J
Wffi.*.*tfr*4$fi-zffii*
Oil Leakage found at the field junction box of ST TSI rectification during next long shutdown
4
ft ftLrsrnfr &*.a.Hrniffi .ifr TnKffilgltrt|t ULe

Lube oil leakage found at the junction of ST lube oil cooler and pipings.
5
h fl i14 )B tfr 7+ t[ 3*,ru €E 8t j6t* tL ts ifl,iffi iH

Often found oil spillage at the top of the ST lube tank.


6
h t/l,i{ iB iH ffiifr*,$?;H fr }fl, iii ifr
Ihe floor at ST S-rneter level got cracked in several places. CMC will discuss with civil contractor, Mr. Salam.
7
htt sxilt,tbffi?trfrtfrryrfr Salam4lE
I
Some exhaust fans of the CW pump room, Sampling roorn, and dosing room are faulty. Only sampling room remaining, other ok. NWPGCL will check.
ls
I
ttE*H. ry f'+ l4 fE lsnli l1tfi -- 4-BfiF Fttr &H .R*tj4xf*lsl, )W.*.*ffi^
HRS lt

of the Diverter Damper Seal AirFan - A&B need to be replaced. Under procurement
I
Xn6'F
Flue gas ieakage found at expansion joint of HRSG (after Diveter Damper). Hotspot (bottom >200'C and other
;i<i'e > 180'C) found at diverter damper s.ection (before expansion joint) |{WPGCL will send CMC a mail, then forward to manufacturer for clarification.
ffi'lrMnrfr (+ttarrg;ifiFffi)'ffit,ieiffi " ++fifttfr.W. @BLfiitffi) ilt& (R*flHfzootr, }tEffiH nL..+. * h cMc El - ++ m[,f+ * [t S
2
f
F lBoH )

Dropwise water is leaking from the expansion joint of the LP Economiser drain line. CMC keep on monitoring.
.)
ffr tr'*' H a* ilFifi.tr *1 wBK i5 - iH - iH }&iffi zK fx#{tH
Water leakage found at minimum flow valve of I{PFW pump-AlB/C several times. CMC will monitor the issue.
4
fr fx# tKR N B / c tl &.,j' ifr.frlfr lRHrfr;ffi tK * BE+ft,ffOE,
'[H+
Ine of some temperature sensors (GBel: Opposite stage-2 thurst bearing_CT2l6, Stage-2 inlet
Spare Chanel
lemperature_CT30?, Motor stator temperature B_CT202; GBC-2: Stage 2 inlet temperature_CT302) of GBC is
Except Motor sensor. Others under procurement.
1
laulty.
tgEdlfit -&e,BtrrfrxBl6HiE€*tp# ( l €iHf f/L' xti.=&ffih*fitr.cr2tr6,- r*.xtr iflEcrroz, € ttT €dtfi!, x4txr6+
f/tE7iffiHB-cr20z; z?lgEtlL, " qy.X?iffiEcrroz >

Lube oil Leakage f,ound from the regulating valve of GBC-I and 2nd Stage & Auxiliary LO pump of GBC-2 Rectification Afterv c/o
2
tq#trf/tlffi fi 'rF,ffi zEi*trt11.*1=t*.&*HH,l{ffi ifr fl fl }ffi f fi vt&ffiftw
F{igh vibration appeared in first stage X & Y direcfion (Mar<. 22.5mm/s) of GBC-2
J
z + l* E tll' !&r*xffiv 7i f4+R4r X ( &tzz.:mmls )
NWP will send amail to CMC

During running condition of GBC, the temperature of the lube oil is higher than the normal value ( > 50 "q w*.*ti*IhxxM$fi!m[.f+
4
HEi,ttrtrSIIEI, iE}E'fi HtrH+iEH,E (HfSOtr)
Miscellaneous:

As per ISO requirement, it needs to install a flapper at the Exhaust vent duct of the switchgear room. NWPCCL will send a mail to CMC
t
m#rsory*, ffi*afrXEBftflFtrLiE€A*--+q,+
Maximum AC's condensate drain line blockage and leakage.. Specially in SWGR room.
Already arrange Salam search the ceiling plate sample fortes
2 E 'tlE}AiBhffiz.KiE

CCCW heat exchanger's ACW in/out valves having passing. Valve KKS: 30PGA20AA001, 30PCB20AA00I lttend next shutdown
3
ti.;ti* t&{$E S El lF rtzK ltE ll 6 iffi TRtr#T&14
Disconnector switch (3 I ADEI5GS2O2) at 230 kV bay having alignment problem. attend next shutdown
4
z:0ff*nrffiAn&rfrW T7^Ffjr&b4

fire fighting line at sub-station having de-painted.


Fire hydrant box having water leakage and
5 iH Flf uKffiffizK l.
Hydrant ST 004: Hose damage 2. Hydrant ST 005: Nipple valve missing 3. Hydrant ST CMC will attend
)01: Valve passing 4. Hydrant GT 004: Box damage

I& C problem attached as "O & M koblem (I & C)'


6 CMC will check
ffi-tftFArEffi'f+fl:LiH+
CCCW heat exchanger's A, CCW inlet valve having abnormal sound. Wili rectified the valve after shutdown.
7
iftfr,iftiea$ ffi , Htllitf-tKf"4i4ltE ll, Tffi E+ft rE fl
^H*&

6." 1?;
w

2o2 0. /2- 6