[Message : Reply to inquiry of Mr. Santos, Researcher-Reporter of VERA Files regarding
status of the Samal Island - Davao City Connector (SIDC) Project
|Message / Reply
‘This has reference to the electronic mail of Mt Ivel Santos, Researcher-Reporter of
VERA Files, inquiring about the status of the SIDC Project. In this regard, enumerated
below is the status of the project as of July 28, 2023, to wit:
(1) The project construction was suspended in January 2023 due to prevailing
right-of-way acquisition issues. There are on-going acquisition of properties of
the Project Affected Person/s (PAPS) to allow entry of DPWH and contractor
Personnel into their property to conduct geotechnical investigation of the
remaining areas,
(2) The suspension of the SIDC Project has no connection with the said petition filed
with the Supreme Court of the Lucas-Rodriquez cian, as the same Is In line with
the environmental concerns to which this project is duly compliant with. Rest
‘assured that the project will proceed as planned once the engineering aspect of
the projects finalized.