You are on page 1of 2
Repubtic of the Phipps DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ‘CENTRAL OFFICE Manta Form PID-2013 Message /Reply Approval Form jummary of Complaint /Query [Sender : Mr. Ive! Santos (isantos@veratiles.ora) [Transaction ID: [Message : Reply to inquiry of Mr. Santos, Researcher-Reporter of VERA Files regarding status of the Samal Island - Davao City Connector (SIDC) Project |Message / Reply ‘This has reference to the electronic mail of Mt Ivel Santos, Researcher-Reporter of VERA Files, inquiring about the status of the SIDC Project. In this regard, enumerated below is the status of the project as of July 28, 2023, to wit: (1) The project construction was suspended in January 2023 due to prevailing right-of-way acquisition issues. There are on-going acquisition of properties of the Project Affected Person/s (PAPS) to allow entry of DPWH and contractor Personnel into their property to conduct geotechnical investigation of the remaining areas, (2) The suspension of the SIDC Project has no connection with the said petition filed with the Supreme Court of the Lucas-Rodriquez cian, as the same Is In line with the environmental concerns to which this project is duly compliant with. Rest ‘assured that the project will proceed as planned once the engineering aspect of the projects finalized. Fal: Fectranc mei of Mr: Santos dated July 26, 2023 2A. ICTOAYTINTGCINYH (Ref No, BMC SIDE 2023-00140)

You might also like