You are on page 1of 20

Doc. Name: Exhibit B.2.

[Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

AS BUILT
Smartfren Hard Split and Soft Split Project
Site As Built

Site ID ZJKT_4835
Site Name Jubilee School
Site Type Indoor&RT
Tower Type Pole

Document NO. Ed. Date Page

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

PROJECT: SMARTFREN Hard Split and Soft Split Project

THE EAST BUILDING 26-27th FLOOR PT. SMART Telecom


JL. LINGKAR MEGA KUNINGAN JL. H. AGUS SALIM 45
KAV. E3-2. NO.1 KEBON SIRIH – MENTENG
JAKARTA 12950 JAKARTA PUSAT
TEL:021-2994 2000 TEL:021-31922255
FAX:021-2994 2002 FAX:021-3162519

CONTRACT NO:
Documentation Identification: Document No.
AS BUILT

Company Title Name Signature Date


Prepared by ZTE

Checked by Smartfren

Approved by Smartfren

Site Name: Jubilee School Total Pages:


Site ID: ZJKT_4835 Edition:

This document is exclusively property of ZTE and shall not be used copied
or communicated to the third party without its prior authorization.

Document NO. Ed. Date Page

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

TABLE OF CONTENT

AS BUILT

1. NEW SOLUTION

1.1 Site Information


1.2 Site Model Summary
1.3 New RAN Solution
1.4 New LTE Antenna&Feeder System
1.5 Infran & Power Equipment Information
1.6 New Mini CME

2. SITE DRAWING

This material is proprietary to PT SMART TELECOM and is strictly confidential. No information contained herein may be copied,
translated, transcribed or duplicated for any commercial purposes or disclosed to third parties.
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

1. RF NEW SOLUTION
Site ID:ZJKT_4835
Site Name: Jubilee School
Location: Jl. Sunter Jaya 1 No.1, RT.13/RW.6, Sunter Jaya, Tj. Priok, Kota Jkt Utara, Daerah Khusus Ibukota Jakarta 14360
1.1 Site Information
No. Items Information Tips
1 Site ID ZJKT_4835
2 Site Name Jubilee School
Jl. Sunter Jaya 1 No.1, RT.13/RW.6, Sunter Jaya,
3 Site Address Tj. Priok, Kota Jkt Utara, Daerah Khusus Ibukota
4 Site Ownership Jakarta 14360 Tower provider Smartfren,Tower provider, Others
5 Region Jabodetabek
6 Morphology Class Urban Denseurban,Urban,Suburban, Rural
7 Longitude(E): -6,1499 With(xx.xxx°) format
8 Latitude(N): 106,8588 With(xx.xxx°) format
9 Site Type rooftop Linked to cover page, automatically generate
10 Building Height - Fill with building height if it is Rooftop site
11 Tower/Pole Type RT pole Linked to cover page, automatically generate
12 Equipment Room Type Outdoor Shelter,Concrete room, Outdoor
13 Room Demension (mm) (HxWxD)
14 Existing BTS Equipment/Type BS8900 BS8800,BS8900,BS8906E,CBTS12,SAMSUNG
15 Existing Power Equipment PT.IBS
16 PLN Connection Capacity 7,7 KVA
17 Generator Set Capacity N/A
18 Air Conditioner Qty and capacity N/A
19 Environment Alarm System

1.2 Site Model Summary


No. Site Model Description
1 M01: 8 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization
2 M02: 8 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization
3 M03: 8 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization
4 M04: 10 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization
5 M05: 10 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization
6 M06: 10 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization
7 M07: 12 Port Hybrid Antenna----Additional Material 1 sector TDD sectorization
8 M08: 12 Port Hybrid Antenna----Additional Material 2 sector TDD sectorization
9 M09: 12 Port Hybrid Antenna----Additional Material 3 sector TDD sectorization
10 M10: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 1 sector TDD sectorization
11 M11: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 2 sector TDD sectorization
12 M12: LDXX-6515DS-VTM + 8 Port Hybrid----Additional Material 1 sector TDD sectorization
Doc. Name: Exhibit B.2. [Detail Design] MA-LTE NETWORK-01/ZTE/XI/2014

1.3 New RAN Solution


No. New Items New Information Tips
1 New Solution M05
2 New Rack No Need
3 New/Existing BBU type No Need If existing, just mention the product name
4 New BBU Installation In Existing Rack ZXDU68 Outdoor Rack
5 RRU Type For TDD No Need Mention the product name
6 RRU Qty For TDD /
7 RRU Type For FDD No Need Mention the product name
8 RRU Qty For FDD /
9 New ANT type 10 Port Hybrid Antenna Mention the product code
10 New DCPD6 No Yes/No

1.4 New LTE Antenna&Feeder System


Item Sector-1 Sector-2 Sector-3 Sector-4

1 Antenna Type 10 Port Hybrid Antenna 10 Port Hybrid Antenna

2 Qty of Antennas 1 1
3 Port of Antenna 10 10
4 Height (m,AGL) 40 + 6 40 + 6
5 Azimuth 140 340
6 Machanical Tilt 0 0
7 Electrical Tilt 0 0
8 Antenna Jumper Length(m) for TDD 5 5
9 Antenna Jumper Length(m) for FDD 2 2
10 Feeder Type
11 Feeder/Fiber Length
12 RRU Type R8978(TDD) R8978(TDD)
13 Qty. of RRU 1 1
14 DC Power Cable Length(m)for TDD
15 DC Power Cable Length(m)for FDD

1.5 Infra & Power Equipment Information


No. Items Information Tips
1 Tower structural analysis No Need Need, No need,
Tower structural statement from
2 No Need
Consultant
3 Pole structural analysis/design No Need Need, No need,
4 Building structural analysis No Need Need, No need,
5 Power System Solution No Need
6 New DC System Type No Need
7 Add Rectifier Moudle No Need
8 New battery for new PS No Need
9 Battery replacement No Need
10 New DCPD Box or Subrack No Need
11 Transmission Solution No Need IPRAN,MW,LL,Dark Fiber, Existing 5928
12 New IPRAN Installation No Need
13 New added Power Loading(MAX) Automatically generate according to Model

1.6 New Mini CME


No. New Items New Information Tips
1 New equipment foundation? No Need
2 New Fence & Gate? No Need
3 New Sunshade? No Need
4 AC MCB replacement? No Need Need to replace or add AC MCB or not?
5 DC MCB replacement? No Need Need to replace or add DC MCB or not?
6 New PLN? No Need If Upgrade; see the Mini CME BOQ
7 New Antenna mounting Type No Need
8 New Antenna mounting Qty No Need
9 New RRU mounting Type No Need
10 New RRU mounting Qty No Need
11 New Cable Tray-Type1 No Need 8 types of cab tray
12 Length of cable tray type1 No Need m
13 New Cable Tray-Type2 No Need 8 types of cab tray
14 Length of cable tray type2 No Need m
15 Power Cabinet installation type No Need
16 New Grounding Bar Qty No Need Including tower grounding bar and main grouding bar
17 New feeder window? No Need
Doc. Name: Exhibit B.2. MA-LTE NETWORK-01/ZTE/XI/2014
[Detail Design]
6. DETAILED DESIGN DRAWINGS
Site ID:ZJKT_4835
Site Name: Jubilee School
Location: Jl. Sunter Jaya 1 No.1, RT.13/RW.6, Sunter Jaya, Tj. Priok, Kota Jkt Utara, Daerah Khusus Ibukota Jakarta 14360
SN DRAWING LIST REVISIONS
1 Site Map(detail address,grs,siteidsite name) 1,0
2 Site Layout 1,0
3 Tower/Pole foundation drawing 1,0 NA
4 Pole drawing 1,0 NA
5 Tower strengthening drawing 1,0 NA
6 Antenna bracket and mounting drawing 1,0
7 Shelter/outdoor BTS foundation drawing 1,0 NA
8 Shelter/outdoor BTS canopy-cage view (front, back, side) 1,0 NA
9 Outdoor BTS canopy-cage drawing 1,0 NA
10 Fence detail drawing 1,0 NA
11 Electrical layout 1,0
12 Equipments layout 1,0
13 Indoor cable tray layout 1,0
14 External Grounding system layout 1,0
15 Detail grounding pit and grounding bar drawing 1,0
16 Internal Grounding system 1,0
17 Electrical and Equipment grounding connectivity 1,0
18 Internal shelter/outdoor BTS canopy section drawing 1,0
19 KWH meter pole and foundation drawing 1,0
20 KWH meter internal front view and SLD 1,0
21 ACPDB internal front view 1,0
22 ACPDB SLD 1,0
23 DC Fan front, side and back view 1,0
24 Air conditioner position lay out 1,0
25 EAS/E-Guard front view 1,0
26 EAS/E-Guard connectivity 1,0
27 Block Diagram 1,0
28 AC and DC Power Cable route drawing and table 1,0
Feeder cable, IF cable, PCM cable and other cables route drawing and
29 1,0
table
30 Rectifier and battery system front view 1,0
31 DCPDB front view 1,0
32 Rectifier and DCPDB MCB allocation 1,0
33 BTS front view 1,0
34 Transmission rack front view 1,0 NA
35 Mux front view 1,0 NA
36 DDF,E1 and IP port connection 1,0 NA
37 Transport Equipment(Switch,Router,PTN,etc) front view 1,0 NA
38 ODF (Optical Distribution Frame) view 1,0 NA
39 Fiber Optical Entry Port View 1,0 NA
40 EAS/E-Guard-DDF-BTS/MW Connection sketch map 1,0 NA
41 FEP view 1,0
42 Antenna placement Information 1,0
43 RRU placement information 1,0

Note:For new site,just provide had confirmed with smartfren CME team;for existing
site,if no need,put N/A
smartfren

AS BUILT

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

SITE ID : ZJKT_4835 Drawing


No.: Unit : mm

SITE NAME : Jubilee School Ed. Description Date : Drawn by :

COORDINATE : '-6,1499, '106,8588 1 New Creation

ADDRESS : Jl. Sunter Jaya 1 No.1, RT.13/RW.6, Sunter Jaya,


Tj. Priok, Kota Jkt Utara, Daerah Khusus Ibukota Jakarta 14360
A4
11064 3100 3700
smartfren

1700
Elv : 36,0 M.a.g.l

Elv : 40 M Mecanical Room


Pole :7 M

2600
AS BUILT

Elv : 36,0 M.a.g.l

Horizontal Tray

16200
Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

3000
SHELTER
SMARTFREEN
Ed. Description Date : Drawn by :

1 New Creation

841

A4
NEW ANTENNA
smartfren
SXPWL5H-16(19)-65(33)-iVT-DB
EXISTING ANTENNA DW4_6590B_R2 (10 Port Hybrid) SECTOR 2 ELV. 40 + 6 M.A.R.L
SECTOR 2 ELV. 40 + 6 M.A.R.L

EXISTING RRU TDD (R8984E) EXISTING RRU TDD (R8984E) NEW 10 PORT HYBRID NEW 10 PORT HYBRID
ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L ( SXPWL5H-16(19)-65(33)-iVT-DB ) ( SXPWL5H-16(19)-65(33)-iVT-DB )

EXISTING RRU FDD (R8862A) EXISTING RRU FDD (R8862A) ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L
ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L

EXISTING FILTER EXISTING FILTER


ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L
6000

EXISTING ANTENNA AS BUILT


DW4_6590B_R2

ELV. 40 + 6 M.A.R.L

SHELTER
4000

SMARTFREEN

Approved by : Sign.

BUILDING ROOFTOP Checked by : Sign.


36000

AT 40 M.A.G.L
Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren

AS BUILT

ANTENNASXPWL5H-16(19)-65(33)-iVT-DB
EXISTING ANTENNA DW4_6590B_R2 (10 Port Hybrid) SECTOR 2 ELV. 40 + 6 M.A.R.L
SECTOR 2 ELV. 40 + 6 M.A.R.L

EXISTING RRU TDD (R8984E) EXISTING RRU TDD (R8984E)


ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L

EXISTING RRU FDD (R8862A) EXISTING RRU FDD (R8862A)


ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L

EXISTING FILTER EXISTING FILTER Approved by : Sign.

ELV. 40 + 6 M.A.R.L ELV. 40 + 6 M.A.R.L Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
317 600 2183 smartfren

800
900

AS BUILT

1000
800
AC

AC
ACPDB
900

800
Approved by : Sign.

317 600 600 600 753


Checked by : Sign.

117 114
Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren

317 600 2183

AS BUILT

800
900

1000
800
AC

AC
Approved by : Sign.

Checked by : Sign.

ACPDB
Checked by ( PT. ZTE) : Sign.
900

800
Scale :

Drawing
No.: Unit : mm

317 600 600 600 753 Ed. Description Date : Drawn by :

1 New Creation

117 114

A4
smartfren

AS BUILT

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren

NEW ANTENNA GPS on 5 m

AS BUILT

EXISTING
R8984E
New 10 Port Hybrid ( SXPWL5H-16(19)-65(33)-iVT-DB ) on 40 + 6
EXISTING
Filter m.a.r.l
R8862A

BS8300 EXISTING
R8984E
(TDD+FDD)
ANTENNA DW4_6590B_R2 on 40 + 6 m.a.r.l
EXISTING
Filter
R8862A

EXISTING
R8984E
New 10 Port Hybrid ( SXPWL5H-16(19)-65(33)-iVT-DB ) on 40 + 6
EXISTING
Filter m.a.r.l
R8862A

ACPDB EXISTING
EXISTING ZXDU48
H002

See TX Database
Approved by : Sign.

Checked by : Sign.
Legend

Checked by ( PT. ZTE) : Sign.


DC Power Cable
Fiber Optic
Jumper 1/2"

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren
3P 16A

Existing Rectifier
GROUNDING BAR
NLS-CU 3/12 + AB/SS + AK 4

3P 16A

AS BUILT
New S301

1P 12A SPARE
1
1P 4A EAS
2
1P 4A OUTLET
3

Shielding
1P 6A SPARE
di Panel SDP 4
1P 4A LIGHTING
5
1P 12A AC-1
6

Approved by : Sign.

1P 4A SPARE Checked by : Sign.


NEUTRAL BAR 7
NLS-CU 3/12 + AB/SS + AK 4 1P 12A AC-2
8
1P 4A AC CONTROL Checked by ( PT. ZTE) : Sign.
9

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
E-GUARD BBU FDD TDD
smartfren
125A 125A 125A 63A 16A 16A 16A 16A 16A 16A 16A 16A 63A 25A 25A 25A 25A 25A 25A 25A

Battery DC BLVD LLVD1


Input SPD

ZXDU 3000 ZXDU 3000 ZXDU 3000

AS BUILT

63A 18A 18A 18A 18A 18A 18A

AC Input AC SPD Rectifier AC Switch

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren

AS BUILT

BBU FDD TDD

125A 125A 125A 63A 16A 16A 16A 16A 16A 16A 16A 16A 63A 25A 25A 25A 25A 25A 25A 25A

Battery DC BLVD LLVD1 Approved by : Sign.


Input SPD Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
44
43
smartfren
18
41
40
39
38
37
36
35
34 AS BUILT
33
18
31
30
29
20+8
20+8
26
25
24
DUMMY

PM
DUMMY
DUMMY
DUMMY
DUMMY
DUMMY
BPL FA Existing BBU LTE
B8200
SA CC DUMMY

23
22
21
21
20
19
18
17 Approved by : Sign.
16
15 Checked by : Sign.
14
13
Checked by ( PT. ZTE) : Sign.
12
11
12
DDF Scale :
9
8
Drawing
7 No.: Unit : mm

6
Ed. Description Date : Drawn by :
5
4 1 New Creation

3
2
1

A4
smartfren

AS BUILT

PM 3 BPQ2 ALARM

RUN
ALARM

POWER
RUN

CR0 ALARM

PM 3
RUN

BPN2
ALARM

POWER
RUN ALARM

RUN

ALARM

SA ALARM CCE1B ALARM


RUN

HS
RUN RUN

REPLACE BPN2 TO BPQ2 Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4
smartfren

AS BUILT

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

Scale :

Drawing
No.: Unit : mm

Ed. Description Date : Drawn by :

1 New Creation

A4

You might also like