You are on page 1of 1

D=-1.660 L=400.000 D=-5.884 L=960.000 D=-1.680 L=560.

000
P=-4.15‰ P=-6.13‰ P=-3.00‰

RV5 RV6 RV7 RV8


KM 623008.435 KM 623408.435 KM 624368.435 KM 624928.435
EL 214.910 EL 213.250 EL 207.366 EL 205.686

RV 10000.000 RV 0.000 RV -10000.000 RV 0.000


TV 17.750 TV 0.000 TV 15.646 TV 0.000
BV -0.016 BV 0.000 BV 0.012 BV 0.000
LVC 35.500 LVC 0.000 LVC 31.292 LVC 0.000
DG -3.55‰ DG -1.98‰ DG 3.13‰ DG 1.70‰

Pod / Podet proiectat / Designed culvert / Bridge

Pasaj rutier existent / Existing


road passage

Pasaj superior proiectat /


Designed overpass

Railway Concrete ditch / Șanț de beton C.F. Railway Concrete ditch / Șanț de beton C.F.

+624+390

+624+410

+624+900
Ax statie / Station Axis

Ax halta / HALT Axis

Trecere la nivel proiectata / Designed


level crossing

Trecere la nivel dezafectata /


Dismantled level crossing

NSS proiectat / Upper level rail


design line
Nivel platforma/ Platform level

SPRE CLUJ STATIA TILEAGD


Nivel fund sant / Ditch bottom
level
NSS Existent / Upper level rail
existing
Nivel teren / Ground level
KM= 622+990.685

KM= 623+026.185
EL= 214.921

EL= 214.836

VERTICAL CONNECTION
RACORDARE VERTICALA

RV - Raza curbei de racordare in plan vertical, m /


Radius of vertical curve, in m
TV - Tangenta curbei de racordare in plan vertical /
Tangent of vertical curve, in m
BV - Bisectoarea curbei de racordare in plan vertical /
bisector of vertical curve, in m Nivel teren existent
DG - Diferenta declivitati / Slope difference Existing Terrain Level
NSS proiectat
Designed Top of Rail

LVC - Lungimea curbei de racordare parabolica /


Length of parabolic junction curve, in m
Nivel teren existent
Existing Terrain Level

KM= 624+352.790
STATIA / STATION

KM= 624+384.081

km ex. 624+464
km pr.624+398
EL= 207.462

EL= 207.319

CULVERT
PODET
S60-760-1:14

NSS proiectat
Designed Top of Rail
Nivel teren existent
PJ (STtart) km 40+472.79 - Prima Joanta Existing Terrain Level 205.55 205.49

Schimbator de cale ferata / Railway turnout


UJ (Direct End) km 40+418.57 - Ultima Joanta
215.04 214.91

215.11 214.86

214.50 214.78

214.67 214.74

214.60 214.70

214.91 214.61

214.46 214.53

214.14 214.45

214.36 214.36

214.31 214.32

214.11 214.28

214.11 214.20

215.23 214.12

214.54 214.03

215.03 213.95

215.10 213.91

214.24 213.87

213.97 213.78

213.68 213.70

213.42 213.62

213.48 213.53

213.54 213.49

213.50 213.45

213.87 213.37

213.38 213.29

213.40 213.18

213.28 213.06

213.08 213.00

213.00 212.93

212.56 212.81

212.72 212.69

212.38 212.57

212.75 212.44

212.79 212.38

212.49 212.32

212.97 212.20

212.39 212.08

213.80 211.95

211.48 211.83

211.44 211.77

211.57 211.71

211.56 211.59

211.64 211.46

213.13 211.34

211.02 211.22

211.13 211.16

211.25 211.10

210.74 210.97

212.38 210.85

210.34 210.73

210.67 210.60

211.82 210.54

210.64 210.48

210.03 210.36

210.04 210.24

211.07 210.11

210.50 209.99

209.40 209.93

209.61 209.87

211.47 209.75

209.22 209.62

210.65 209.50

210.24 209.38

209.16 209.32

210.61 209.26

209.39 209.13

209.01 209.01

209.46 208.89

208.31 208.77

207.90 208.70

208.13 208.64

210.17 208.52

208.78 208.40

210.31 208.28

207.63 208.15

207.58 208.09

208.50 208.03

207.48 207.91

207.52 207.79

208.11 207.66

209.11 207.54

208.46 207.48

207.63 207.42

207.09 207.33

206.79 207.27

206.68 207.21

206.86 207.15

206.92 207.12

207.12 207.09

206.46 207.03

206.98 206.97

206.82 206.91

206.49 206.85

206.54 206.82

206.48 206.79

206.89 206.73

207.49 206.67

206.19 206.61

206.48 206.55

207.02 206.52

207.71 206.49

206.31 206.43

208.08 206.37

208.06 206.31

208.15 206.25

207.44 206.22

206.22 206.19

207.57 206.13

206.52 206.07

206.98 206.01

206.01 205.95

206.06 205.92

205.79 205.89

205.06 205.83

205.39 205.77

205.34 205.71

205.36 205.67

205.38 205.66

204.71 205.64

203.44 205.62

205.13 205.59
NSS Proiectat / Upper level rail designed line

NSS Existent / Upper level rail existing


NSS teren existent / Existing terrain level
-0.13

-0.25

0.28

0.07

0.10

-0.30

0.07

0.31

0.01

0.17

0.09

-1.11

-0.51

-1.08

-1.19

-0.37

-0.19

0.02

0.20

0.05

-0.05

-0.05

-0.50

-0.09

-0.22

-0.22

-0.08

-0.07

0.25

-0.03

0.19

-0.31

-0.41

-0.17

-0.77

-0.31

-1.85

0.35

0.33

0.14

0.03

-0.18

-1.79

0.20

0.03

-0.15

0.23

-1.53

0.39

-0.07

-1.28

-0.16

0.33

0.20

-0.96

-0.51

0.53

0.26

-1.72

0.40

-1.15

-0.86

0.16

-1.35

-0.26

-0.57

0.46

0.80

0.51

-1.65

-0.38

-2.03

0.52

0.51

-0.47

0.43

0.27

-0.45

-1.57

-0.98

-0.21

0.24

0.48

0.53

0.29

0.20

-0.03

0.57

-0.01

0.09

0.36

0.28

0.31

-0.16

-0.82

0.42

0.07

-0.50

-1.22

0.12

-1.71

-1.75

-1.90

-1.22

-0.03

-1.44

-0.45

-0.97

-0.06

-0.14

0.10

0.77

0.38

0.37

0.31

0.28

0.93

2.18

0.46
Diferente pe verticala / VERTICAL DISTANCE
623000.00

623020.00

623040.00

623060.00

623080.00

623100.00

623120.00

623140.00

623160.00

623180.00

623200.00

623220.00

623240.00

623260.00

623280.00

623300.00

623320.00

623340.00

623360.00

623380.00

623400.00

623420.00

623440.00

623460.00

623480.00

623500.00

623520.00

623540.00

623560.00

623580.00

623600.00

623620.00

623640.00

623660.00

623680.00

623700.00

623720.00

623740.00

623760.00

623780.00

623800.00

623820.00

623840.00

623860.00

623880.00

623900.00

623920.00

623940.00

623960.00

623980.00

624000.00

624020.00

624040.00

624060.00

624080.00

624100.00

624120.00

624140.00

624160.00

624180.00

624200.00

624220.00

624240.00

624260.00

624280.00

624300.00

624320.00

624340.00

624360.00

624380.00

624400.00

624420.00

624440.00

624460.00

624480.00

624500.00

624520.00

624540.00

624560.00

624580.00

624600.00

624620.00

624640.00

624660.00

624680.00

624700.00

624720.00

624740.00

624760.00

624780.00

624800.00

624820.00

624840.00

624860.00

624880.00

624900.00

624920.00

624940.00

624960.00

624980.00

625000.00
Kilometraj proiectat / DESIGNED CHAINAGE

Kilometraj 623+000 623+100 623+200 623+300 623+400 623+500 623+600 623+700 623+800 623+900 624+000 624+100 624+200 624+300 624+400 624+500 624+600 624+700 624+800 624+900 625+000

L= 5208.64
Diagrama curburii / CURVATURE DIAGRAM

SUPRAINALTARE / CANT

MAXIMUM DESIGN SPEED / VITEZA PROIECTATA

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 CONTRACT: 173/07.12.2022 DATA: Mai 2023 FAZA: P.A.C. REVIZIA DATA COMENTARII
SPECIFICATIE NUME SEMNATURA DENUMIRE PROIECT: WB01 Mai 2023 Prima editie
8

7
PROIECTARE ȘI EXECUȚIE A LUCRĂRILOR AFERENTE OBIECTIVULUI DE
6

5 14
13
12

FIR II
3 5 9
4

III

II
12 8 2
FIR II
1 7 11
4

III

II
16 12 10
6

2
1
FIR II
41 45

III
II
1

55 12 6 4 3
FIR
11
II
13 17 21
2A

IIIA

IVA
1A

81
766024 4 7 17 21
27 29
8
6
5

IV
11
10
9
7
30
40
32
Manager de proiect ing. Giorgio Carrapetta INVESTIȚII ”ELECTRIFICAREA ȘI REABILITAREA LINIEI DE CALE FERATǍ CLUJ
FIR I 1
7 11

1
14 6 4

FIR I
3 5 9

1
18 14 3
FIR
5
I
37
39
4
5
6
7
10 8 2

FIR
5 7
I
9 19

27 31
35

33 43
VA
64

50 42
72 48

14
12
10
8 6

2
FIR

FIR
II

I
1

3
11
9

5
13
15

49
19
III
24
20/22

14 4
2

FIR I
BENEFICIAR ANTREPRENOR SI PROIECTANT GENERAL PROIECTANT DE SPECIALITATE
8
9
10
6A
7A
1B
2B
2

1
NAPOCA - ORADEA - EPISCOPIA BIHOR”, LOT 4 ALEȘD - FRONTIERĂ UNGARIA
11

Proiectat ing. Domenico Ceraudo


SCARA: DENUMIRE DESEN:

Spre Cluj STATIA STATIA STATIA STATIA STATIA Spre Ungaria Verificat ing. Bãzãrînca Cristina PROFIL LONGITUDINAL
TILEAGD OSORHEI
1:1000/100
ORADEA EST ORADEA EPISCOPIA BIHOR COMPANIA NAȚIONALĂ DE CĂI FERATE Codificare plansa CTA4-CO-DWG-PAC-00-LUCF-PFL-003-WB01 PLAN 03 / 30

You might also like