Professional Documents
Culture Documents
Nexus 1450 Meter Quickstart Guide E171703
Nexus 1450 Meter Quickstart Guide E171703
CAUTION! Installation of the Nexus® 1450 meter must be performed only by qualified personnel who
follow standard safety precautions during all procedures. Those personnel should have appropriate
training and experience with high voltage devices. Appropriate safety gloves, safety glasses and
protective clothing are recommended.
During normal operation of the Nexus® meter, dangerous voltages flow through many parts of the unit, includ-
ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules
and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid
contact with any current-carrying surfaces.
Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can
only be used as secondary protection.
IMPORTANT! Refer to your meter’s Installation and Operation Manual for additional safety warnings before
performing installation, wiring, or maintenance of your meter. See the link to the manual, below.
NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter
operation and programming information, refer to your meter’s Installation and Operation Manual and the
Communicator PQA® and MeterManagerPQA® Software, EnergyPQA.com® AI Driven Energy Management System
User Manual on EIG’s website:
User Manual:
https://www.electroind.com/products/nexus-1450-cyber-secure-energy-panel-meter-with-advanced-power-qual-
ity-and-multiport-communication/
From the webpage, click Technical Documents>User Manual.
Software Manual:
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Technical Documents>User Manual.
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec-
troind.com or call 516-334-0870.
All EIG’s metering and software products’ literature can be accessed from:
https://www.electroind.com/all-products/
For software and metering integration, EIG’s Technical Support Engineers are available on an hourly or daily basis to
help with typical commissioning assistance, which includes:
You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.
Mechanical Installation:
Mount the Nexus® 1450 Meter against any firm, flat surface. Use a #10 screw in each of the four slots on the
flange to ensure that the unit is installed securely. For safety reasons, mount the meter in an enclosed and pro-
tected environment, such as in a switchgear cabinet. Install a switch or circuit breaker nearby; label it clearly
as the meter’s disconnecting mechanism.
10.70in 27.19cm
6.25in 15.88cm
6.74in 17.12cm
Slots
1. 2. 3.
5a.
4. 5b.
6.
1. P70N display
2. P70N ANSI Mounting unit
3. Panel
4. Studs and washers from the ANSI Mounting kit
5a and 5b. Mounting brackets and studs shipped with the P70N display
6. Washers and nuts from the ANSI Mounting kit
The recommended order of assembly for the ANSI Mounting kit is:
a. Attach the top bracket (5a) with its stud to the top back of the P70N display (1) - the bracket has two
hooks that fit into the slots on the top of the display.
b. Slide the top of the display with attached bracket under the front lip of the ANSI Mounting unit (2) and
tighten stud snugly - torque is to 3.1 in-lb.
c. Attach the bottom bracket (5b) with its stud to the bottom back of the P70N display - the bracket has
two hooks that fit into the slots on the bottom of the display; tighten stud snugly - torque is 3.1 in-lb.
d. Once the display is secured inside the ANSI Mounting unit, attach the studs and washers from the ANSI
Mounting kit (4) to the back of the unit.
e. Use the washers and nuts from the ANSI Mounting kit (6) to attach the ANSI Mounting unit with P70N
display to the panel (3) - torque is 3.5 in-lb.
Insert one end of the supplied RS485 cable into one of the meter’s RS485 ports set to Modbus RTU, Slave,
Address 1, and Baud Rate of 9600. Insert the other end of the cable into the back of the P40N+ or P70N
display (see below). See the meter’s user manual for detailed information and alternate P70N mounting.
RX
TX
CT
RX
CT
TX
TX
On
0-1mA 0-1mA 0-1mA Female RS485
Analog Output Analog Input Analog Input Power In Side Port
Module Module Module
INPUT 2 INPUT 2
! L(+)
LEDs
OUT 2
DANGER I/O Port
OUT 3
OUT 4
INPUT 3
INPUT 4
INPUT 3
INPUT 4
Power
PSIO
Supply (Size and Pin
Configuration Vary)
Male RS485
Side Port
INPUT 5 INPUT 5 Max Power: 12 VA
INPUT 6 INPUT 6 Input Voltage: 12-60V DC
INPUT 7 INPUT 7 90-240V AC/DC Reset Button
INPUT 8 INPUT 8
Output Voltage: 12V DC
Wiring Diagrams:
Please refer to the Nexus® 1450 Meter User Manual for additional wiring diagrams and information.
LINE
LINE
A B C N
A B C N
SHORTING SWITCH OR
TEST BLOCK
SHORTING SWITCH OR
HI TEST BLOCK
Ic LO
HI
In
EARTH GROUND
LO
HI
EARTH GROUND
Ib LO
HI
CTs
Ic LO
HI
CTs
Ia LO
HI
Ib LO
EARTH
FUSES GROUND
Vc HI
Ia LO
PTs
Vb FUSES
Vc EARTH GROUND
Vb
Va Va
Vref
Vref Vaux
AUXILIARY VOLTAGE
Vaux N-
AUXILIARY VOLTAGE POWER SUPPLY
FUSE
N-
EARTH GROUND
A B C N L+ (DEPENDENT ON EQUIPPED SUPPLY OPTION) A B C N
FUSE POWER SUPPLY
L+ (DEPENDENT ON EQUIPPED SUPPLY OPTION)
LOAD LOAD
4 Wire 3 Element with 3 PTs and 3 CTs 4 Wire 3 Element Direct Voltage with 4 CTs
LINE LINE
A B C A B C N
SHORTING SWITCH OR
SHORTING SWITCH OR
TEST BLOCK
TEST BLOCK
HI
HI
Ic Ic LO
LO
EARTH GROUND
EARTH GROUND
HI
Ib
EARTH GROUND
LO CTs
CTs
HI
HI
Ia Ia LO
LO
EARTH GROUND
EARTH GROUND
FUSES FUSES PTs
PTs Vc
Vc
Vb
Va
Va
Vref
Vaux
AUXILIARY VOLTAGE
A B C N
EARTH GROUND
N-
N-
POWER SUPPLY
A B C FUSE POWER SUPPLY
FUSE L+ (DEPENDENT ON EQUIPPED SUPPLY OPTION)
L+ (DEPENDENT ON EQUIPPED SUPPLY OPTION)
LOAD LOAD
3 Wire 2 Element Open Delta with 2 PTs and 2 CTs 3 Phase 4 Wire 2.5 Elements with 2 PTS and 3 CTs
f. Click Connnect.
2. The Device Status screen opens, displaying information about the meter.
NOTE: A few basic settings are explained here. Refer to the Nexus® 1450 Meter Installation and Operation
Manual and the Communicator PQA® and MeterManagerPQA® Software, EnergyPQA.com® AI Driven Energy
Management System User Manual for expanded instructions. The manual is available on the EIG website (see
page QS-1 for the download link) and from the CommunicatorPQA® application: click Help>Contents from the
Main screen to open the manual.
b. For the Network card ports, the settings are IP Address, Subnet Mask, and Default Gateway. You
can use this setting to change the default IP address to a new IP address.
c. The Advanced Settings button lets you set up additional features for the Network cards. See the
Communicator PQA® and MeterManagerPQA® Software, EnergyPQA.com® AI Driven Energy
Management System User Manual for instructions on these settings.
d. Click OK.
1. From the Main screen’s Title bar, click Tools>Set Device Time.
2. You can either enter the time in the Time fields, or click Use
PC Time to set the time using your PC’s time.
3. Click Send.
The meter’s name is used in database files and report titles. To enter a unique name for the meter:
3. Click OK.
Nexus®, CommunicatorPQA®, MeterManagerPQA®, EnergyPQA®, and EnergyPQA.com® are registered trademarks of Electro
Industries/GaugeTech.
https://electroind.com