for the period of November 12, 2022 to January 9, 2023
Contract ID: 22GB0004
Contract Name : ILOILO - ANTIQUE RD - K0072+(-103) - 0072+500
Location : Antique
Contractor : IBC - INTERNATIONAL BUILDERS CORPORATION
Page 1 of 1
REVISED CONTRACT
ORIGINAL CONTRACT QUANTITY ACCOMPLISHMENT AMOUNT ACCOMPLISHMENT
(As per latest V.O.) RELATIVE Percenta
Item No. Item Description Unit
WEIGHT ge
Quantity Unit Cost Amount Quantity Unit Cost Amount Previous This Period To Date Balance Previous This Period To Date Balance
Part B. Other General Requirements
B.5 Project Billboard/Signboard ea. 3.00 5,608.51 16,825.53 3.00 5,608.51 16,825.53 0.04% 3.00 - 3.00 - 16,825.53 - 16,825.53 - 0.04%
B.7(1) Occupational Safety and Health Program mo. 6.93 9,303.60 64,473.94 6.93 9,303.60 64,473.94 0.14% 4.50 0.50 5.00 1.93 41,866.20 4,651.80 46,518.00 17,955.94 0.10%
B.8 Traffic Management mo. 6.93 11,897.54 82,449.95 6.93 11,897.54 82,449.95 0.18% 4.50 0.50 5.00 1.93 53,538.92 5,948.77 59,487.69 22,962.26 0.13%
B.9 Mobilization/Demobilization l.s. 1.00 313,645.69 313,645.69 1.00 313,645.69 313,645.69 0.68% 0.50 - 0.50 0.50 156,822.84 - 156,822.84 156,822.85 0.34%
Part C. Earthworks
Individual Removal of Trees, Small (150-300
100(3)a1 each 32.00 1,307.10 41,827.20 32.00 1,307.10 41,827.20 0.09% 32.00 - 32.00 - 41,827.20 - 41,827.20 - 0.09%
mm dia.)
Removal of Actual Structures/Obstruction (ACP,
101(3)c2 sq.m. 665.00 206.53 137,342.45 665.00 206.53 137,342.45 0.30% - 665.00 665.00 - - 137,342.45 137,342.45 - 0.30%
0.10 m thick)
Removal of Actual Structures/Obstruction
101(4)a1 l.m. 13.00 877.60 11,408.80 13.00 877.60 11,408.80 0.02% 4.00 9.00 13.00 - 3,510.40 7,898.40 11,408.80 - 0.02%
(RCPC, 610mm dia.)
Removal of Actual Structures/Obstruction
101(6) l.m. 12.00 1,188.41 14,260.92 12.00 1,188.41 14,260.92 0.03% - 12.00 12.00 - - 14,260.92 14,260.92 - 0.03%
(RCPC, 910mm dia.)
100(3)a5 Removal of Actual Structures and Obstruction cu.m. 106.00 2,488.68 263,800.08 106.00 2,488.68 263,800.08 0.57% 106.00 - 106.00 - 263,800.08 - 263,800.08 - 0.57%
102(2) Surplus Common Excavation cu.m. 11,837.00 164.92 1,952,158.04 10,198.00 164.92 1,681,854.16 3.66% 7,840.54 2,357.46 10,198.00 - 1,293,061.86 388,792.30 1,681,854.16 - 3.66%
103(1)a Structure Excavation (Common Soil) cu.m. 420.00 285.22 119,792.40 420.00 285.22 119,792.40 0.26% 406.28 13.72 420.00 - 115,879.18 3,913.22 119,792.40 - 0.26%
103(1)b Structure Excavation (Soft Rock) cu.m. 1,370.00 685.91 939,696.70 2,623.00 685.91 1,799,141.93 3.91% 2,490.60 132.40 2,623.00 - 1,708,327.45 90,814.48 1,799,141.93 - 3.91%
Pipe Culverts and Drain Excavation (Common
103(6)a cu.m. 162.00 316.91 51,339.42 162.00 316.91 51,339.42 0.11% 38.00 124.00 162.00 - 12,042.58 39,296.84 51,339.42 - 0.11%
Soil)
104(1)a Embankment from Roadway Excavation cu.m. 2,626.00 202.80 532,552.80 2,626.00 202.80 532,552.80 1.16% 2,410.54 215.46 2,626.00 - 488,857.51 43,695.29 532,552.80 - 1.17%
104(7) Embankment from Structure Excavation cu.m. 62.00 214.74 13,313.88 62.00 214.74 13,313.88 0.03% 62.00 - 62.00 - 13,313.88 - 13,313.88 - 0.03%
105(1)a Subgrade Preparation (Common Material) sq.m. 6,068.00 43.88 266,263.84 6,068.00 43.88 266,263.84 0.58% 2,234.00 3,302.30 5,536.30 531.70 98,027.92 144,904.92 242,932.84 23,331.00 0.53%
Part D. Subbase and Base Course
200(1) Aggregate Subbase Course cu.m. 1,386.50 1,241.52 1,721,367.48 1,386.50 1,241.52 1,721,367.48 3.74% 308.74 966.06 1,274.80 111.70 383,306.88 1,199,382.81 1,582,689.70 138,677.78 3.45%
Part E. Surface Courses
311(1)f1 Portland Cement Concrete Pavement sq.m. 1,869.30 1,830.82 3,422,351.82 1,869.30 1,830.82 3,422,351.82 7.44% - 1,251.22 1,251.22 618.08 - 2,290,758.60 2,290,758.60 1,131,593.22 4.98%
Part G. Drainage and Slope Protection Structures
404(1)a Reinforcing Steel, Grade 40 kg. 25,129.40 76.40 1,919,886.16 29,668.90 76.40 2,266,703.96 4.93% 13,180.82 11,090.78 24,271.60 5,397.30 1,007,014.65 847,335.59 1,854,350.23 412,353.73 4.03%
Structural Concrete Class "A" (20.68 Mpa, 28
405(1)a3 cu.m. 613.75 7,918.98 4,860,273.97 613.75 7,918.98 4,860,273.97 10.57% 299.23 221.12 520.35 93.40 2,369,596.39 1,751,044.86 4,120,641.25 739,632.72 8.96%
Days)
500(1)b3 Pipe Culverts (Class IV, 910 mm dia. RCPC) l.m. 41.00 5,631.80 230,903.80 41.00 5,631.80 230,903.80 0.50% 18.00 23.00 41.00 - 101,372.40 129,531.40 230,903.80 - 0.50%
505(2)a Grouted Riprap, Class "A" cu.m. 49.50 4,211.57 208,472.71 49.50 4,211.57 208,472.71 0.45% 49.50 - 49.50 - 208,472.71 - 208,472.71 - 0.45%
506(1) Stone Masonry cu.m. 863.64 4,357.73 3,763,509.93 863.64 4,357.73 3,763,509.93 8.18% 402.95 460.69 863.64 - 1,755,947.30 2,007,562.63 3,763,509.93 - 8.18%
509(1)b1 Steel Piles, Steel (Slope Protection) l.m. 4,770.00 3,642.16 17,373,103.20 - - - 0.00% - - - - - - - - 0.00%
510(2) Concrete (Slope Protection) cu.m. 391.33 8,984.33 3,515,837.85 391.33 8,984.33 3,515,837.85 7.64% 233.66 157.67 391.33 - 2,099,278.55 1,416,559.31 3,515,837.85 - 7.64%
517(1)b Drain Pipe (PVC) l.m. 186.00 1,103.87 205,319.82 186.00 1,103.87 205,319.82 0.45% - 186.00 186.00 - - 205,319.82 205,319.82 - 0.45%
Part H. Miscellaneous Structures
600(7) Curb and Gutter (Precast) pc. 592.00 800.31 473,783.52 1,202.00 800.31 961,972.62 2.09% 100.00 786.00 886.00 316.00 80,031.00 629,043.66 709,074.66 252,897.96 1.54%
601(1) Sidewalk sq.m. 74.00 589.61 43,631.14 74.00 589.61 43,631.14 0.09% - 47.14 47.14 26.86 - 27,794.22 27,794.22 15,836.92 0.06%
Reflectorized Thermoplastic Pavement Marking
612(1) sq.m. 69.80 1,179.14 82,303.97 69.80 1,179.14 82,303.97 0.18% - - - 69.80 - - - 82,303.97 0.00%
White
Part III. Civil, Mechanical, Electrical and
Sanitary/Plumbing Works
Part C. Finishing and Other Civil Works
1032(1)c Painting Works sq.m. 323.00 482.94 155,989.62 323.00 482.94 155,989.62 0.34% - - - 323.00 - - - 155,989.62 0.00%
1047(1)a Structural Truss kg. 21,755.50 98.45 2,141,828.97 21,755.50 98.45 2,141,828.97 4.66% - - - 21,755.50 - - - 2,141,828.97 0.00%
1047(3)a Metal Structures Accessories (Bolts) each 54.00 649.78 35,088.12 54.00 649.78 35,088.12 0.08% - - - 54.00 - - - 35,088.12 0.00%
1047(6) Metal Structures Accessories (Steel Plates) kg. 1,099.00 95.72 105,196.28 1,099.00 95.72 105,196.28 0.23% - - - 1,099.00 - - - 105,196.28 0.00%
EXTRA WORK
Furnished and Driven of Steel Sheet Pile (Z-
1717(5)a1 m. - - - 1,830.00 9,218.02 16,868,976.60 36.67% 1,830.00 - 1,830.00 - 16,868,976.60 - 16,868,976.60 - 36.67%
Type), Grade 50
TOTAL 45,080,000.00 46,000,021.65 100.00% 29,181,698.03 11,385,852.30 40,567,550.30 5,432,471.34 88.19%

Prepared by: Verified by: Checked and Reviewed by: Recommending Approval : APPROVED FOR PAYMENT

"For and in the absence of Chief, Construction Section"