Professional Documents
Culture Documents
HUAWEI
JOIN US
community.solar.huawei.com
Contents
1. Product
2. Installation
1. Fusionsolar Residential inverter
Battery system
LUNA2000-(5-30)-S0
FusionSolar Smart PV
FusionSolar App SUN2000 App
Management System
https://intl.fusionsolar.huawei.com
FusionSolar
9
Single-Phase Inverter Networking
Compatible Inverter Smart Power Battery Number of Communication Management AFCI
Optimizer Sensor Cascaded System
Inverters
SUN2000-450W-P SUN2000- • DDSU666-H • LG Chem ≤ 3 (including the • Local commissioning: built-in WLAN of the inverter FusionSolar Yes
2/3/3.68/4/4.6/5 (single-phase) RESU7H/10H host) • (Standard configuration) WLAN communication:
/6KTL-L1 • DTSU666-H 250 • HUAWEI built-in WLAN of the inverter
A/50 mA (three- LUNA2000-(5- • (Optional) Ethernet communication: Smart Dongle-
phase) 30)-S0 WLAN-FE
• (Optional) 4G communication: Smart Dongle-4G
Optimizer (optional):
The optimizer for the SUN2000-450W-P is installed at the rear of PV modules. Supports the long
PV string design. The maximum power of a single PV string is 5 kW. Commissioning:
• Local commissioning: The inverter communicates with the FusionSolar app over the built-in
WLAN.
• Remote management:
- Built-in WLAN of the inverter (standard configuration)
- Smart Dongle-WLAN-FE (optional)
- Smart Dongle-4G (optional)
Communicates with the FusionSolar smart PV management system to register and manage PV
plants.
Battery (optional):
• Huawei LUNA2000-(5-30)-S0
• LG Chem RESU7H/10H
High-voltage DC coupled battery supports plug-and-play after connecting to the inverter.
The battery is connected to inverters over RS485 for management, and supports AC and
DC bidirectional charging, fixed charging and discharging, maximum self-consumption, and time-
sharing electricity price control.
Configure the Backup controller (optional, not supported by the SUN2000L-2-5KTL):
components in the The inverter automatically supplies power to primary loads when the power grid fails.
dashed-line boxes as Smart Power Sensor (optional):
required. • DDSU666-H (single-phase)
• DTSU666-H 250 A/50 mA (three-phase)
Connects to inverters over RS485 for output power management and export limitation.
Cascading scenarios In-phase grid connection Balanced three-phase grid connection
SUN2000-450W-P SUN2000- DTSU666-H 250 HUAWEI ≤ 10 (including the host) • Local commissioning: built-in WLAN of the inverter FusionSolar Yes
3/4/5/6/8/10 A/50 mA (three- LUNA2000-(5- • (Standard configuration) WLAN/Ethernet
KTL-M1 phase) 30)-S0 communication: Smart Dongle-WLAN-FE
• (Optional) 4G communication: Smart Dongle-4G
• Optimizer (optional):
• The SUN2000-450W-P optimizer is installed at the rear of PV modules.
• Supports the long PV string design. The maximum power of a single PV string is 10 kW.
• Commissioning:
• Local commissioning: The built-in WLAN of the inverter communicates with the
FusionSolar app.
• Remote management:
- Smart Dongle-WLAN-FE (standard configuration)
- Smart Dongle-4G (optional)
Communicates with the FusionSolar smart PV management system to register and
manage PV plants.
Battery (optional):
• Huawei LUNA2000-(5-30)-S0
High-voltage DC coupled battery supports plug-and-play after connecting to the
Configure the inverter. Batteries are connected to the inverter over RS485 for management.
components in the Supports AC and DC bidirectional charging.
dashed-line boxes as Supports fixed charging and discharging, maximum self-consumption, and time-sharing
required. electricity price control.
Backup controller (optional, not supported by the SUN2000-3-10KTL-M0):
Only supports single-phase load off-grid control.
The inverter automatically supplies power to primary loads when the power grid fails.
Smart Power Sensor (optional):
DTSU666-H 250 A/50 mA (three-phase)
Connects to the inverter over RS485 for output power monitoring and power limiting.
Contents
1. Products
2. Installation
2.1 Installation Videos
FusionSola
r
FusionSolar APP
SUN2000-
2/3/3.68/4/4.6/5/6KTL-L1 SUN2000-3/4/5/6/8/10KTL-M1 LUNA2000-(5-30)-S0 Website:
https://support.huawei.com/en
Website: Website: Website:
terprise/zh/doc/EDOC1100165
https://support.huawei.com/e https://support.huawei.com/ent 057
https://support.huawei.com/e
nterprise/zh/doc/EDOC110006 erprise/zh/doc/EDOC11001823
nterprise/zh/doc/EDOC110014
6770 58?idPath=22892350%7C21439
8147?idPath=22892350|21439 QR Code:
560%7C7921563%7C21102413
560|7921563|21102413|22027
%7C23448309
611 QR Code:
QR Code:
QR Code:
14 Huawei Confidential
Documentation Links
Category Document Link (Support-E)
Installation (Video) SUN2000-(2KTL-6KTL)-L1 Installation Chinese English German French Dutch Italian Portuguese Spanish
Video Video
(Video) SUN2000-(3KTL-10KTL)-M Installation Chinese English German French Dutch Italian Spanish Polish
Video (Q3 2020)
(Video) SUN2000-450W-P Smart PV Optimizer Chinese English German French Dutch Italian Portuguese Spanish
Installation Video
(Video) LUNA2000-(5-30)-S0 Installation Video Chinese English German French Dutch (Q4 Italian (Q4 Portuguese Spanish
(Q4 2020) (Q4 2020) (Q4 2020) (Q4 2020) 2020) 2020) (Q4 2020) (Q4 2020)
User SUN2000-(2KTL-6KTL)-L1 User Manual Chinese English German French Dutch Italian Portuguese Spanish
Manual
SUN2000-(3KTL-10KTL)-M0 User Manual Chinese English German French Dutch Italian Spanish Polish
SUN2000-(3KTL-10KTL)-M1 User Manual Chinese English German French Dutch Italian Spanish Polish
(2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3)
LUNA2000-(5-30)-S0 User Manual (Q3 2020) Chinese English German French Dutch (Q3 Italian (Q3 Portuguese Spanish
(Q3 2020) (Q3 2020) (Q3 2020) (Q3 2020) 2020) 2020) (Q3 2020) (Q3 2020)
Quick Guide SUN2000-(2KTL-6KTL)-L1 Quick Guide Chinese English German French Dutch Italian Portuguese Spanish
SUN2000-(3KTL-10KTL)-M0 Quick Guide Chinese English German French Dutch Italian Spanish Polish
SUN2000-(3KTL-10KTL)-M1 Quick Guide Guide Chinese English German French Dutch Italian Spanish Polish
(Q3 2020) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3) (2020.Q3)
SUN2000-450W-P Smart PV Optimizer Quick Chinese English German French Dutch Italian Portuguese Spanish
Guide
LUNA2000-(5-30)-S0 Quick Guide (Q3 2020) Chinese English German French Dutch (Q3 Italian (Q3 Portuguese Spanish
(Q3 2020) (Q3 2020) (Q3 2020) (Q3 2020) 2020) 2020) (Q3 2020) (Q3 2020)
Category Document Link (Support-E)
Commissioning (Video) FusionSolar App Commissioning Chinese English German French Dutch Italian
Video Video
Quick Guide SDongleA-03 Quick Guide (4G) Chinese English German French Dutch Italian Portuguese Spanish Polish
SDongleA-05 Quick Guide (WLAN-FE) Chinese English German French Dutch Italian Portuguese Spanish Polish
FusionSolar App Quick Guide Chinese English German French Dutch Italian Portuguese Spanish Polish
SUN2000L-(2KTL-5KTL) and SUN2000- English Germa French Dutch Italian Portuguese Spanish
(2KTL-6KTL)-L1 Battery & Smart Power n
Sensor Quick Guide
HiKnow App
1. Download the HiKnow app. 2. Choose Products > Network 3. Choose iKnow > Enterprise 4. Choose Forums > Enterprise
Energy > FusionSolar PV > Network Energy > Enterprise Network Energy > Network
SUN2000/SUN2000MA/… > Solar Inverter and use Energy > Smart PV to
Product Info to obtain the keywords to quickly search participate in the discussion.
required documents. for required information.
13 PV modules in each PV
string PV String Design in the Scenario with
Full Configuration of Optimizers
Maximum number of PV modules in each PV string:
For details, see the SUN2000-450W-P Single-phase: 5,000 W/ 300 W ≈ 16
brochure. Three-phase: 10000 W/ 300 W ≈ 33
Use the JKM300M-60/1000 V as an example.
27
All PV strings are Some PV strings are
reversely connected. reversely connected.
(Full configuration of optimizers) PV string reverse connection
Fault Mode Symptom Alarm
PV string PV string
302
4
Quantity FLUKE 87 (60k) FLUKE 375 (Auto) FLUKE 17B+ (100k) EM33D (200k)
Common Reverse Common Reverse Common Reverse Common Reverse
Resistance measurement example Measurement Measurement Measurement Measurement Measurement Measurement Measurement Measurement
optimizers are determined based on the ratio of the resistance by 4 3.93 3.26 3.694 3.36 3.72 3.43 3.7 3.4
common measurement to the resistance by reverse measurement. 5 4.97 4.03 4.616 4.174 5.3 3.6 4.6 4.2
10 9.85 8.13 10.05 7.93 10.8 7.2 9.3 8.5
Resistance by common 15 14.79 12.19 15.08 11.89 14.21 12.77 14 12.7
measurement R5 (kΩ) 20 19.7 16.27 20.09 15.89 19.07 16.93 18.7 17
25 24.64 20.37 25.12 19.88 24.04 21.08 23.4 21.2
30 29.6 24.43 30.18 23.83 29.08 25.11 28.1 25.5
35 34.53 28.48 35.23 27.75 34.5 29.08 32.8 29.8
40 39.5 32.52 40.28 31.69 39.4 32.94 37.5 34
44 43.46 35.73 44.35 34.8 43.73 36.01 41.4 37.4
50 49.48 40.53 50.49 39.54 49.4 40.7 47.1 42.4
Resistance by reverse
measurement R6 (kΩ) Quantity Precision Common Precision Common Precision Common Precision Common
Measurement Measurement Measurement Measurement
/Reverse /Reverse /Reverse /Reverse
Measurement Measurement Measurement Measurement
• The precision is related to the number of optimizers. 40 -1.25% 1.21 0.70% 1.27 -1.50% 1.20 -6.25% 1.10
• The resistance by common measurement is greater than the 44 -1.23% 1.22 0.80% 1.27 -0.61% 1.21 -5.91% 1.11
resistance by reverse measurement. 50 -1.04% 1.22 0.98% 1.28 -1.20% 1.21 -5.80% 1.11
Note: The ratio on rainy days changes slightly, yet without affecting the measurement result.
The resistance measurement range of the multimeter affects the measured string output resistance. If the resistance
measurement range of the multimeter is too large, the measured string output resistance may be greater than N x 1.1
kilohms. Select the minimum resistance measurement range that meets the measurement requirements of the
multimeter.
Connecting a Battery and Grid Meter
SUN2000-2-6KTL-L1 • If an LG battery is configured, the PV string input voltage cannot exceed 495 V.
• The CAN_H and CAN_L ports of the battery are not used currently.
• The cable colors are for reference only.
Three-phase grid meter
Single-phase
grid meter