No Sub Item Pekerjaan Jumlah Total

A Pekerjaan Persiapan Rp 9,838,920.00


B Pekerjaan Bongkaran Rp 1,248,000.00
C Pekerjaan Tanah Rp 3,058,848.00
D Pekerjaan Struktur
D. 1. Struktur Rumah Lantai 1 Rp 71,994,131.26
D. 4. Struktur Lantai Top Roof dan Shopi - Shopi Rp 6,614,416.00
D. 5. Struktur Pendukung Rp 7,210,119.62
E Pekerjaan Atap
E. 1. Atap Bangunan Utama Rp 20,349,409.60
F Pekerjaan Dinding
F. 1. Pekerjaan Dinding Rumah Lantai 1 Rp 64,410,051.68
F. 3. Pekerjaan Dinding Sopi-Sopi Rp 1,895,244.00
F. 4. Pekerjaan Fasad Rp 6,476,887.04
G Pekerjaan Plafond
G. 1. Pekerjaan Plafond dan Pengecatan Lantai 1 Rp 8,582,319.20
H Pekerjaan Finishing Lantai & Dinding
H. 1. Pas. Finishing Lantai 1 Rp -
H. 5. Pintu & Jendela Lantai 1 Rp -
I Pekerjaan MEP
I.1. Pekerjaan Elektrikal Rp -
I.2. Pekerjaan Plumbing Rp -
I.3. Armatur Plumbing Rp 6,854,640.00
J Pekerjaan Besi Rp 1,092,000.00
K Pekerjaan Lain - Lain Rp 16,041,104.56

Grand Total Rp 225,666,090.96


Pembulatan Rp 225,600,000.00
Terbilang :

NOTE :

Jakarta, Friday, August 11, 2023


Prepared By Reviewed by

Farhan Bagustyono

PERENCANA :
PEKERJAAN : BANGUN BARU RUMAH TINGGAL
OWNER :
LOKASI :
DOKUMEN :

RENCANA ANGGARAN BIAYA

Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

A Pekerjaan Persiapan
1 Safety Tools P3K, Sarung Tangan, Helem, Sepatu Bot ls 1.00 Rp 1,248,000.00 Rp 1,248,000.00
2 Alat Bantu Kerja Alat Pendukung Pembangunan ls 1.00 Rp 1,040,000.00 Rp 1,040,000.00
3 Mobilisasi dan Demobilisasi tukang, alat kerja dll ls 1.00 Rp 2,496,000.00 Rp 2,496,000.00
4 Penginapan Tukang Sampai Selesai Pembangunan (1 Bulan di Awal) ls 1.00 Rp 2,496,000.00 Rp 2,496,000.00
5 Gudang Uk. 3x4 m tempat simpan material ls 1.00 Rp 156,520.00 Rp 156,520.00
6 Pek Mengukur dan Memasang Bouwplank Papan 220 tiap meter ls 1.00 Rp 2,402,400.00 Rp 2,402,400.00
7 Listrik dan Air Kerja Selama Pekerjaan Berlangsung (Setelah Pemasangan Listrik Tetap) ls - BY OWNER BY OWNER
8 Keamanan Lingkungan Kebisingan, Ormas, Akses Jalan ls - BY OWNER BY OWNER

Jumlah Sub Rp 9,838,920.00


B Pekerjaan Bongkaran
1 Bongkaran Langsir Material ls 1.00 Rp 1,248,000.00 Rp 1,248,000.00

Rp 1,248,000.00
C Pekerjaan Tanah
1 Galian Tanah Fondasi Galian Tanah Biasa m3 22.76 Rp 83,200.00 Rp 1,893,632.00
2 Urugan Tanah Kembali (Fondasi) Tanah Bekas Galian + Pemadatan m3 22.41 Rp 52,000.00 Rp 1,165,216.00

Jumlah Sub Rp 3,058,848.00


D Pekerjaan Struktur
D. 1. Struktur Rumah Lantai 1
1 Pekerjaan Fondasi
a Pas. Batu Kali Batu Kali 1 Pc : 5 Ps m3 16.19 Rp 1,092,000.00 Rp 17,680,572.00

2 Pekerjaan Fondasi
a Fondasi 40 x 40 x 20 cm
- Beton Site Mix, K-225 m3 0.35 Rp 948,001.60 Rp 333,696.56
- Besi SNI Ø12 mm - 15 cm kg 124.97 Rp 18,720.00 Rp 2,339,446.45
- Begisting Multiplek / Plastik Cor m2 3.52 Rp 99,950.30 Rp 351,825.07

3 Pekerjaan Sloof
a. Sloof 15 x 25 cm
- Beton Site Mix, K-225 m3 1.76 Rp 948,001.60 Rp 1,667,297.81
- Besi 4Ø 12 mm, 2Ø 12 mm, sengkang Ø 8 mm - 15 cm & 20 cm kg 384.20 Rp 18,720.00 Rp 7,192,242.82
- Begisting Multiplek m2 23.45 Rp 99,950.30 Rp 2,343,834.61

4 Pekerjaan Kolom
a. Kolom 15 x 30 cm
- Beton Site Mix, K-225 m3 2.62 Rp 948,001.60 Rp 2,487,082.20
- Besi 6D13 mm, sengkang Ø 10 mm - 15 cm & 20 cm kg 516.12 Rp 18,720.00 Rp 9,661,786.28
- Begisting Multiplek m2 52.47 Rp 99,950.30 Rp 5,244,392.40
b. Kolom Praktis 15 x 15 cm
- Beton Site Mix, K-175 m3 1.09 Rp 717,600.00 Rp 779,851.80
- Besi 4Ø 8 mm, sengkang Ø 8 mm - 20 cm kg 146.40 Rp 18,720.00 Rp 2,740,668.44
- Begisting Multiplek m2 28.98 Rp 99,950.30 Rp 2,896,559.78
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

5 Pekerjaan Balok
a Balok 15 x 25 cm
- Beton Site Mix, K-225 m3 2.23 Rp 948,001.60 Rp 2,116,472.82
- Besi 4Ø12 mm, sengkang Ø 8 mm - 15 cm & 20 cm kg 360.92 Rp 18,720.00 Rp 6,756,343.50
- Begisting Multiplek m2 29.77 Rp 99,950.30 Rp 2,975,270.65
b Balok Topian 15 x 25 cm
- Beton Site Mix, K-225 m3 0.33 Rp 948,001.60 Rp 317,284.29
- Besi 4Ø 12 mm, sengkang Ø8 mm - 15 cm & 20 cm kg 54.11 Rp 18,720.00 Rp 1,012,855.73
- Begisting Multiplek m2 4.46 Rp 99,950.30 Rp 446,028.23
c Balok Lintel 15 x 15 cm
- Beton Site Mix, K-225 m3 0.20 Rp 948,001.60 Rp 190,370.57
- Besi 4Ø 10 mm, sengkang Ø8 mm - 15 cm & 20 cm kg 38.47 Rp 18,720.00 Rp 720,106.53
- Begisting Multiplek m2 2.68 Rp 99,950.30 Rp 267,616.94

6 Topian Beton
- Beton Site Mix, K-175 m3 0.38 Rp 717,600.00 Rp 271,252.80
- Besi Tul. Bawah Ø 8 mm - 20 cm, Tul. Atas Ø 6 mm - 20 cm kg 24.82 Rp 18,720.00 Rp 464,539.31
- Begisting Multiplek m2 7.37 Rp 99,950.30 Rp 736,733.68

Rp 71,994,131.26

D. 4. Struktur Lantai Top Roof dan Shopi - Shopi


1 Pekerjaan Plat Talang Air
a. Talang Beton (t = 10 cm)
- Beton Site Mix, K-225 m3 0.87 Rp 948,001.60 Rp 826,183.39
- Besi M8 2 Layer kg 129.76 Rp 19,760.00 Rp 2,564,037.84
- Begisting Multiplek m2 10.46 Rp 153,163.64 Rp 1,601,785.31
b. Balok 15 x 20 cm Talang
- Beton Site Mix, K-175 m3 0.32 Rp 886,745.60 Rp 284,911.36
- Besi 4Ø 8 mm, sengkang Ø 8 mm - 20 cm kg 48.57 Rp 18,720.00 Rp 909,311.00
- Begisting Multiplek m2 4.28 Rp 99,950.30 Rp 428,187.10

Rp 6,614,416.00

D. 5. Struktur Pendukung
1 Plat Lantai Garasi
- Beton Site Mix, K-225 m3 1.32 Rp 948,001.60 Rp 1,254,206.12
- Besi M8 2 Layer kg 55.20 Rp 18,720.00 Rp 1,033,250.40
- Begisting Multiplek m2 1.58 Rp 99,950.30 Rp 157,421.73

2 Plat Drainase (Lebar 50 cm)


- Beton Site Mix, K-225 m3 0.48 Rp 948,001.60 Rp 453,903.17
- Besi Wiremesh M7 Double Layer kg 33.29 Rp 18,720.00 Rp 623,230.40
- Begisting Multiplek m2 5.63 Rp 99,950.30 Rp 562,520.31

3 Meja Beton
a. Plat
- Beton Site Mix, K-175 m3 0.38 Rp 691,600.00 Rp 261,424.80
- Besi Tul. Bawah Ø 6 mm - 20 cm, Tul. Atas Ø 6 mm - 20 cm kg 10.94 Rp 18,720.00 Rp 204,813.00
- Begisting Multiplek m2 4.41 Rp 99,950.30 Rp 440,780.84
b. Balok Meja Beton 10 x 15 cm
- Beton Site Mix, K-175 m3 0.06 Rp 691,600.00 Rp 43,570.80
- Besi 4Ø 6 mm, sengkang Ø 6 mm - 20 cm kg 3.84 Rp 18,720.00 Rp 71,948.36
- Begisting Multiplek m2 1.68 Rp 99,950.30 Rp 167,916.51

4 Lantai Kerja
- Beton K-100 (Tebal 5 cm) m3 3.47 Rp 558,480.00 Rp 1,935,133.20

Rp 7,210,119.62
E Pekerjaan Atap
E. 1. Atap Bangunan Utama
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

1 Penutup Atap Lantai 1


- Rangka Atap Rangka Atap Baja Ringan 0.75mm m2 38.35 Rp 186,680.00 Rp 7,159,178.00
- Penutup Atap Genteng Beton Flat Cisangkan m2 38.35 Rp 171,912.00 Rp 6,592,825.20
- Nok Genteng Nok Genteng Beton Flat Cisangkan m' 5.20 Rp 172,640.00 Rp 897,728.00
- Lisplank Lisplang Simpleplank 20cm Polos+cat m' 46.00 Rp 59,540.00 Rp 2,738,840.00
- Flashing Ban - Banan Atap Pas. Bata, Plaster, Aci, & Cat t = 10 cm m' 8.00 Rp 74,880.00 Rp 599,040.00

2 Finishing Atap
- Roof Drain Talang Saringan Roof Drain Vone 3" bh 5.00 Rp 176,800.00 Rp 884,000.00
- Sika Top Sika Top 107 Seal, 1 : 4,5 (2 Lapis) m2 9.96 Rp 57,893.33 Rp 576,617.60
- Screding Plaster t =2 cm & Acian m2 9.96 Rp 90,480.00 Rp 901,180.80

Rp 20,349,409.60
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

F Pekerjaan Dinding
F. 1. Pekerjaan Dinding Rumah Lantai 1
1 Pasangan Dinding
- Pasangan Dinding Bata Ringan 10 x 20 x 60 cm + MU 380 m2 178.60 Rp 113,880.00 Rp 20,338,968.00
- Plasteran Plesteran Tiga Roda 1 SP : 5 PP, Tebal 20 mm m2 357.20 Rp 46,800.00 Rp 16,716,960.00
- Acian Acian Tiga Roda, Tebal 5 mm m2 357.20 Rp 32,744.40 Rp 11,696,299.68

2 Pengecatan Dinding
- Cat Dinding Interior Cat Tembok Interior Mowilex Emulsion (1 Lapis Dasar, 2 Cat Penutup) (Waterbased) m2 243.20 Rp 39,520.00 Rp 9,611,264.00
- Cat Dinding Exterior Cat Tembok Eksterior Mowilex Weathercoat (1 Lapis Dasar, 2 Cat Penutup) (Waterbased) m2 114.00 Rp 53,040.00 Rp 6,046,560.00

Rp 64,410,051.68

F. 3. Pekerjaan Dinding Sopi-Sopi


1 Pasangan Dinding
- Pasangan Dinding Bata Ringan 10 x 20 x 60 cm + MU 380 m2 5.00 Rp 113,880.00 Rp 569,400.00
- Plasteran Plesteran Tiga Roda 1 SP : 5 PP, Tebal 20 mm m2 10.00 Rp 46,800.00 Rp 468,000.00
- Acian Acian Tiga Roda, Tebal 5 mm m2 10.00 Rp 32,744.40 Rp 327,444.00
2 Pengecatan Dinding
- Cat Dinding Exterior Cat Tembok Eksterior Mowilex Weathercoat (1 Lapis Dasar, 2 Cat Penutup) (Waterbased) m2 10.00 Rp 53,040.00 Rp 530,400.00

Rp 1,895,244.00

F. 4. Pekerjaan Fasad

1 Lantai 1
- Pekerjaan Kisi - Kisi WPC Kisi - Kisi Fasad WPC Kayu Asri 8 cm (Spasi 5 cm) + Rangka m2 6.20 Rp 1,044,659.20 Rp 6,476,887.04

Jumlah Sub Rp 6,476,887.04

G Pekerjaan Plafond
G. 1. Pekerjaan Plafond dan Pengecatan Lantai 1
1 Pekerjaan Plafond
- Plafond Gypsum Flat Rangka Hollow 4x4cm, 2x4cm, t 0,3 mm, Gypsum Aplus 9 mm m2 40.00 Rp 121,680.00 Rp 4,867,200.00
- List Plafond Gypsum Gypsum dengan Motif Sesuai Desain m2 50.00 Rp 48,625.20 Rp 2,431,260.00

2 Pekerjaan Plafond
- Cat Plafond Cat Plafon Vinilex m2 40.00 Rp 32,096.48 Rp 1,283,859.20

Jumlah Sub Rp 8,582,319.20

H Pekerjaan Finishing Lantai & Dinding


H. 1. Pas. Finishing Lantai 1
1. Pas. Lantai
- Lantai Carport plester aci + Tali Air m2 - Rp 85,280.00 Rp -
Lantai Tekstur Kayu Conwood Stair 30 cm, Tebal 25 mm + Cat Conwood & Coating Anti Gores (1
- Lantai Teras Depan dan Taman m2 - Rp 842,400.00 Rp -
Lapis Dasar, 2 Cat Penutup)
- Lantai Tangga Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -
- Lantai Foyer Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -
- Lantai K.T Art Keramik Setara Asia Tile UK. 30 x 30 cm Grade A m2 - Rp 170,501.76 Rp -
- Lantai Gudang Keramik Setara Asia Tile UK. 30 x 30 cm Grade A m2 - Rp 170,501.76 Rp -
- Lantai Kamar Mandi Art Keramik Setara Asia Tile UK. 30 x 30 cm Grade A m2 - Rp 170,501.76 Rp -
- Lantai Dapur Kotor & Laundry Room Keramik Setara Asia Tile UK. 30 x 30 cm Grade A m2 - Rp 170,501.76 Rp -
- Lantai R Keluarga, Dapur Bersih , R. Makan Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -
- Lantai Powder Room Keramik Setara Asia Tile UK. 30 x 30 cm Grade A m2 - Rp 170,501.76 Rp -
- Lantai Mushola Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -
- Lantai KT Utama Dan Wic Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -
- Lantai Kamar Mandi Utama Keramik 60 x 60 cm (Platinum) m2 - Rp 254,800.00 Rp -

2. Pas. Plint Lantai


a. Plint Lantai Sesuai Penutup Lantai Ukuran Tinggi 10 cm m' - Rp 58,043.44 Rp -
b. Plint Tangga Sesuai Penutup Lantai Ukuran Tinggi 10 cm m' - Rp 58,043.44 Rp -

3. Pas. Finishing Dinding


a. Dinding Powder Room Keramik Platinum UK. 30 x 60 - Tinggi 300 cm m2 - Rp 283,920.00 Rp -
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

b Dinding Kamar Mandi Art Keramik Platinum UK. 30 x 60 - Tinggi 300 cm m2 - Rp 283,920.00 Rp -
c Dinding Kamar Mandi Utama Keramik Platinum UK. 30 x 60 - Tinggi 300 cm m2 - Rp 283,920.00 Rp -
- Sika Top Lantai + Dinding 100 Cm Keliling KM. Utama,Powder Room,Kamar Mandi Art Sika Top 107 Seal, 1 : 4,5 (2 Lapis) m2 - Rp 57,893.33 Rp -

Jumlah Sub Rp -
H. 5. Pintu & Jendela Lantai 1
a. Pas. Kusen & Daun Pintu
1 Pintu Utama 90 x 240 cm Kusen Alumunium Inkalum 4'' + Daun Pintu Kamper + Fin. Duco + Acc Ex. Solid unit - Rp 5,438,614.52 Rp -
2 Pintu Ruang Samping (70 x 220) Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid unit - Rp 2,923,925.33 Rp -
3 Pintu Kamar Art, Pintu Gudang 65 x 200 cm Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid unit - Rp 2,533,776.76 Rp -
4 Pintu Dapur Kotor Depan 70 x 220 cm Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid unit - Rp 2,923,925.33 Rp -
5 Pintu Kamar Utama, Dan Dapur Kotor Dalam 90 x 220 cm Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid unit - Rp 3,555,373.71 Rp -
6 Pintu Jendela Mushola (250 x 220 cm) Alexindo 4" + 2 Daun Pintu Sliding + 2 Daun Jendela Mati + Kaca Clear 8 mm + ACC unit - Rp 6,146,400.00 Rp -
7 Pintu Jendela Taman (460 x 220 cm) Alexindo 4" + 2 Daun Pintu Sliding + 4 Daun Jendela Mati + Kaca Clear 8 mm + ACC unit - Rp 10,754,640.00 Rp -
8 Pintu Sliding Servis & KM Utama (70 x 220 cm) Inkalum 4" + 1 Daun Pintu Sliding Pvc +ACC unit - Rp 925,766.40 Rp -
9 Pintu Km. Art, Powder Room 70 x 200 cm Pintu PVC Crystal Minimalis unit - Rp 1,338,480.00 Rp -
b. Pas. Kusen & Daun Jendela

1 Jendela Kamar Utama (195 x 120 cm) Kusen Alumunium Inkalum 4'' + 3 Daun Jendela Alumunium Kaca 6 mm Casment + Acc Ex. Solid unit - Rp 3,938,459.20 Rp -

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment+ 1 Daun Jendela
2 Jendela Kamar Art, Foyer, Mushola (70 x 200 cm) unit - Rp 2,601,640.89 Rp -
Kaca Mati + Acc Ex. Solid
3 Jendela Dapur Kotor (80 x 200 cm) Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Casement Kaca 8 mm + Acc Ex. Solid unit - Rp 2,231,032.37 Rp -

Jumlah Sub Rp -

I Pekerjaan MEP
I.1. Pekerjaan Elektrikal
1. Pek. Elektrikal Lantai 1
a Pas. Instalasi Kabel Listrik
1 Inst. Kabel Utama Inst. Kabel Utama, NYM 3x2,5 mm2 (o) PVC HI dia. 20mm m' - Rp 28,080.00 Rp -
2 Inst. Lampu Bangunan Inst. Lampu Bangunan, NYM 2x1,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 213,312.55 Rp -
3 Inst. Stop Kontak Inst. Stop Kontak, NYM 3x2,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 296,512.55 Rp -
4 Inst. MCB-KWH Meter Inst. MCB-KWH Meter, NYM 3x2,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 260,268.55 Rp -
5 Inst. Saklar Inst. Saklar, NYM 2x1,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 214,404.55 Rp -
6 Inst. Out TV Inst. Out TV, (o) PVC HI dia. 20mm (Jasa Pasang + Aksesoris) ttk - Rp 144,418.86 Rp -
7 Inst. Stop Kontak Pompa Air NYM 3x2,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 298,748.55 Rp -
8 Inst. Exhaust Fan Inst. Exhaust Fan, NYA 6 mm2 (o) PVC HI dia. 20mm ttk - Rp 176,028.55 Rp -
9 Inst. Listrik AC Inst. Listrik AC, NYM 3x2,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 307,302.67 Rp -
10 Inst. Out Data Inst. Out Data, (o) PVC HI dia. 20mm (Jasa Pasang + Aksesoris) ttk - Rp 144,418.86 Rp -
11 Inst. Stop Kontak Air Panas Inst. Stop Kontak, NYM 3x2,5 mm2 (o) PVC HI dia. 20mm ttk - Rp 298,748.55 Rp -

b Pas. Armatur Listrik


1 Fiting Lampu
- Lampu Downlight Lampu Downlight Panasonic LED Panel Bulat 12 W Cool Day Light bh - Rp 120,328.00 Rp -
- Lampu Downlight Outbow Downlight Outbow Luxmenn Bulat LED PM 209 12 W, Warm white/ Cool day white bh - Rp 228,800.00 Rp -
- Lampu Dinding 1 Arah Wall Lamp Outdoor Tabung 1 Arah bh - Rp 224,473.60 Rp -
- Lampu Dinding 2 arah Wall Lamp Outdoor Tabung 2 Arah bh - Rp 279,073.60 Rp -

2. Saklar
- Saklar Single Schneider Electric Leona Saklar Lampu - 1 Gang 1 Arah - LNA0100321 bh - Rp 57,200.00 Rp -
- Saklar Double Schneider Electric Leona Saklar Lampu - 2 Gang 1 Arah - LNA0300321 bh - Rp 65,520.00 Rp -

3. Stop Kontak
- Stop Kontak Schneider Electric Leona Stop Kontak - 1 Gang Schuko CP - LNA2900221 ttk - Rp 60,320.00 Rp -
- Stop Kontak Data Stop Kontak Data RJ45 Cat5 Leona Schneider - LNA4300121 ttk - Rp 93,600.00 Rp -
- Stop Kontak AC SCHNEIDER NEO STOP KONTAK AC 13A E3015D_EBGS ttk - Rp 270,400.00 Rp -

4 Water Heater
- Unit Water Heater Water Heater Listrik Ariston Andris2 R 10L 200 Watt Model 2020 NEW unit - Rp 3,682,670.16 Rp -

5 Exhaust Fan
- Exhaustfan Plafond Exhaust Fan Ceiling Mitsubishi 8" 20SC5T unit - Rp 416,187.20 Rp -

6 Panel KWH
a. Bok MCB
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

- Unit Bok MCB Box MCB Schneider Electric 12 Group Inbow MIP22112S unit - Rp 674,435.84 Rp -
b. ELCB
- Unit ELCB ELCB/RCCB Schneider Electric DOMAE 2P 25A 30MA AC 6KA DOMR01225 bh - Rp 673,244.00 Rp -
c. MCB
- MCB 10 Amp Untuk Lampu ( 1 MCB : 20 ttk Lampu ) MCB Schneider Electric DOMAE 6KA 1P 10A DOMF01110 bh - Rp 136,356.48 Rp -
- MCB 10 Amper Untuk Stop Kontak MCB Schneider Electric DOMAE 6KA 1P 10A DOMF01110 bh - Rp 136,356.48 Rp -
- MCB 10 Amper Untuk AC ( 1 Unit 1 MCB) MCB Schneider Electric DOMAE 6KA 1P 10A DOMF01110 bh - Rp 136,356.48 Rp -

Jumlah Sub Rp -

I.2. Pekerjaan Plumbing


a Instalasi Air Bersih
1. Pekerjaan Instalasi Lantai 1
a Instalasi Pipa 1/2" (Ke Armatur Sanitair) Pipa PVC Tipe AW Rucika Diameter 1/2" m' - Rp 34,372.00 Rp -
b Instalasi Pipa 3/4 (Ke Toren) Pipa PVC Tipe AW Rucika Diameter 3/4" m' - Rp 41,579.20 Rp -
c Instalasi Air Panas Pipa Air Panas Onda 1/2" m' - Rp 76,923.60 Rp -

b Instalasi Air Kotor & Udara


1. Pekerjaan Instalasi Lantai 1
a Instalasi Udara Exhaust Fan Pipa 3 " TO PLAFOND m' - Rp 109,168.80 TO PLAFOND
b Instalasi Air Hujan Pipa 3 " Pipa PVC Tipe D Diameter 3" m' - Rp 109,168.80 Rp -
c Instalasi Air Bekas Pipa 4 " Pipa PVC Tipe D Diameter 4" m' - Rp 151,048.56 Rp -
d Instalasi Air Kloset Pipa 4 " Pipa PVC Tipe D Diameter 4" m' - Rp 151,048.56 Rp -
e Instalasi AC
- Instalasi Air Unit Indoor Pipa 3/4 " Pipa PVC Tipe AW Rucika Diameter 3/4" m' - Rp 41,579.20 EXCLUDE
- Instalasi Pipa Refrigen (Indoor ke Outdoor AC) EXCLUDE m' - EXCLUDE

Jumlah Sub Rp -

I.3. Armatur Plumbing


1 Armatur Lantai 1
a Armatur Kamar Mandi
1. Closet Duduk Kamar Mandi Utama
- Unit Kloset Toto CW 633 Tutup TC505 Putih unit 1.00 Rp 2,293,200.00 Rp 2,293,200.00
- Jet Spray Jet shower wasser WE 99 JS white unit 1.00 Rp 218,400.00 Rp 218,400.00
- Stop Kran Cabang Closet & Jet Spray Stop Kran WC Cabang 1/2" / Keran T Jet Shower unit 1.00 Rp 72,800.00 Rp 72,800.00
2 Shower
- Unit Shower Shower Tiang Sello SL9811 unit 1.00 Rp 3,016,000.00 Rp 3,016,000.00
3 Floor Drain
- Unit Floor Drain 3 " Smart Drain SS 304 unit 1.00 Rp 193,440.00 Rp 193,440.00

b Armatur Kitchen / Dapur


1 Kitchen Zink
- Unit Kitchen Zink Sink 1 lubang setara Royal SB 35 unit 1.00 Rp 624,000.00 Rp 624,000.00
- Unit Kran Kran Leher Angsa 1/2" Fleksibel, Setara ONDA unit 1.00 Rp 280,800.00 Rp 280,800.00
c Armatur Carpot & Taman
1. Stop Kran Dinding
- Unit Stop Kran Kran Air Dinding Stainless Wasser unit 1.00 Rp 156,000.00 Rp 156,000.00
Harga Satuan
NO. ITEM DIMENSION & SPESIFICATION Sat Vol. Jumlah Harga
Bahan + Jasa

Jumlah Sub Rp 6,854,640.00

J Pekerjaan Besi
1 Tangga Servis (Monkey Ladder) Ke Dak Torn Besi Hollow Hitam 2 x 4 x 0.12 cm + 4 x 4 x 0.12 cm, Fin. Cat m' 3.00 Rp 364,000.00 Rp 1,092,000.00

Jumlah Sub Rp 1,092,000.00

K Pekerjaan Lain - Lain


1 Pekerjaan Septick Tank
a. Unit Septick Tank Bio 1000 Ltr Bioseptictank Penguin Bio 1000 Liter unit 1.00 Rp 5,092,914.32 Rp 5,092,914.32
b. Resapan dan Dinding Bio Septictank (Pasangan Bata Septictank Bio 100 Ukuran 2,1 x 2,1 x 2 m) unit 1.00 Rp 6,495,880.56 Rp 6,495,880.56
2 Toren Pinguin 1000 liter TB-110 unit 1.00 Rp 1,872,000.00 Rp 1,872,000.00
3 Pompa Dorong Air Ke Armatur Sanitasi Water booster Wasser PB-318EA unit 1.00 Rp 2,060,309.68 Rp 2,060,309.68
4 Bak Kontrol Bak Kontrol Air Kotor unit 1.00 Rp 520,000.00 Rp 520,000.00
5 General Cleaning ls 1.00 FREE FREE

Jumlah Sub Rp 16,041,104.56


Jumlah Total 225,666,090.96

CATATAN
1 Ketinggian Plafond di 3,45 meter
2 Ketinggian Antar Lantai Di 3,8 Meter
3 Septictank dibuat baru
4 Keamanan By Owner
PERENCANA :
PEKERJAAN : BANGUN BARU RUMAH TINGGAL
PEMILIK : -
LOKASI : -
DOKUMEN : TIME SCHEDULLE & KURVA S

TIME SCHEDULLE & KURVA S


BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8
NO ITEM TOTAL PRICE BOBOT PERSENTASE
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
A Pekerjaan Persiapan Rp 9,838,920.00 4.36% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14% 0.14%
100%
B Pekerjaan Bongkaran Rp 1,248,000.00 0.55% 0.14% 0.14% 0.14% 0.14%
C Pekerjaan Tanah Rp 3,058,848.00 1.36% 0.34% 0.34% 0.34% 0.34% 90%
D Pekerjaan Struktur Rp 85,818,666.88 38.03% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 3.17% 80%
E Pekerjaan Atap Rp 20,349,409.60 9.02% 1.13% 1.13% 1.13% 1.13% 1.13% 1.13% 1.13% 1.13%
F Pekerjaan Finishing Rp 72,782,182.72 32.25% 3.23% 3.23% 3.23% 3.23% 3.23% 3.23% 3.23% 3.23% 3.23% 3.23%
70%
G Pekerjaan Plafond Rp 8,582,319.20 3.80% 0.48% 0.48% 0.48% 0.48% 0.48% 0.48% 0.48% 0.48% 60%
H Pekerjaan Finishing Lantai & Dinding Rp - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
50%
I Pekerjaan MEP Rp 6,854,640.00 3.04% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51%
J Pekerjaan Besi Rp 1,092,000.00 0.48% 0.12% 0.12% 0.12% 0.12% 40%
K Pekerjaan lain-lain Rp 16,041,104.56 7.11% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 30%
HARGA TOTAL Rp 225,600,000.00 100.00% 20%
PROGRES RENCANA 0.14% 0.27% 0.61% 0.61% 3.78% 3.64% 3.31% 3.31% 3.31% 3.31% 4.43% 4.43% 4.43% 4.43% 7.66% 7.66% 4.49% 4.49% 3.84% 3.84% 3.84% 3.84% 3.84% 3.84% 1.12% 1.12% 1.83% 1.83% 1.95% 1.95% 1.44% 1.44% 10%
PROGRES RENCANA KUMULATIF - 0.14% 0.41% 1.02% 1.64% 5.42% 9.06% 12.37% 15.67% 18.98% 22.29% 26.72% 31.15% 35.58% 40.02% 47.67% 55.33% 59.82% 64.31% 68.15% 71.98% 75.82% 79.66% 83.49% 87.33% 88.45% 89.57% 91.39% 93.22% 95.17% 97.12% 98.56% 100.00%
PROGRES REALISASI
0%
PROGRES RENCANA KUMULATIF

JAKARTA, 30 JUNI 2022


PT. BINTORO BANGUN INDONESIA

INDRA JAYA
DIREKTUR

9
PERENCANA :
PEKERJAAN : BANGUN BARU RUMAH TINGGAL
PEMILIK : -
LOKASI : -
DOKUMEN : TIME SCHEDULLE & KURVA S

TIME SCHEDULLE & KURVA S


BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10
NO ITEM BOBOT PERSENTASE
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40
A Pekerjaan Persiapan 4.16% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 100%
B Pekerjaan Bongkaran 1.78% 0.89% 0.89% 90%
C Pekerjaan Tanah 1.13% 0.28% 0.28% 0.28% 0.28% 80%
D Pekerjaan Struktur 24.64% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 70%
E Pekerjaan Atap 8.15% 2.72% 2.72% 2.72% 60%
F Pekerjaan Finishing 19.00% 2.11% 2.11% 2.11% 2.11% 2.11% 2.11% 2.11% 2.11% 2.11% 50%
G Pekerjaan Plafond 4.52% 0.90% 0.90% 0.90% 0.90% 0.90% 40%
H Pekerjaan Finishing Lantai & Dinding 22.42% 3.20% 3.20% 3.20% 3.20% 3.20% 3.20% 3.20% 30%
I Pekerjaan MEP 10.51% 1.75% 1.75% 1.75% 1.75% 1.75% 1.75% 20%
J Pekerjaan Besi 2.11% 0.42% 0.42% 0.42% 0.42% 0.42% 10%
K Pekerjaan lain-lain 1.57% 0.31% 0.31% 0.31% 0.31% 0.31% 0%
100.00%
PROGRES RENCANA 0.99% 0.99% 0.39% 0.39% 2.15% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 1.86% 2.22% 4.93% 5.83% 5.83% 4.21% 5.06% 1.86% 5.06% 5.06% 5.96% 5.96% 3.31% 0.84% 0.84% 0.84% 1.12% 0.84% 2.22% 2.22% 2.22% 2.22% 2.22%
PROGRES RENCANA KUMULATIF - 0.99% 1.99% 2.38% 2.76% 4.91% 6.77% 8.64% 10.50% 12.37% 14.23% 16.09% 17.96% 19.82% 21.69% 23.55% 25.41% 27.28% 29.14% 31.36% 36.29% 42.12% 47.96% 52.17% 57.23% 59.08% 64.14% 69.20% 75.16% 81.13% 84.44% 85.28% 86.12% 86.96% 88.08% 88.92% 91.14% 93.35% 95.57% 97.78% 100.00%
PROGRES REALISASI
PROGRES RENCANA KUMULATIF

Note : Jangka waktu pelaksanaan diluar pekerjaan


ok

ok

ok

ok

ok
ok

ok

ok

ok

ok

ok
ok

ok

ok

ok

ok

ok

ok
ok

ok

ok

ok

ok

ok
ok

ok

ok

pintu lipat handerson, Rangka Holow 30x60 40x60 40x80 1,2mm + Plat panel Plat bending 1,2mm + rail atas da

ok

ok
PINTU
Pintu Dapur Kotor dan Mushola 90x210 (Sliding)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Kamar Tidur 95x210 (swing)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Kamar Tidur 90x210 (swing)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Kamar Tidur 65x200 (swing)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Kamar Tidur 65x200 (swing)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Kamar Tidur 65x200 (swing)

Kusen Alumunium Inkalum 4'' + Daun Pintu Multiplek + Fin. Hpl Ex. Taco + Acc Ex. Solid

Pintu Utama 170x270(Double swing)


Kusen Alumunium Inkalum 4'' + 2 Daun Pintu Meranti + Fin. Duco + Acc Ex. Solid

Pintu Belakang (akses taman swing) 100x250

Kusen Alumunium Inkalum 4'' + Daun Pintu Kamper + Fin. Duco + Acc Ex. Solid

JENDELA
Uk : 95x180 cm (1 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 3 Daun Jendela Alumunium Kaca 6 mm Casment + Acc Ex. Solid

Uk : 95x180 cm (1 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment+ 1 Daun Jendela Kaca

Uk : 150x160 cm (1 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 220x160 cm (1 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 100x160 cm (1 Daun Jendela)


Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 70x160 cm (1 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 140 x 260 cm (2 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 130 x 170 cm (2 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 135 x 260 cm (2 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Alumunium Kaca 5mm Casment + Acc Ex. Solid

Uk : 60 x 140 cm (Jendela Mati)

Kusen Alumunium Inkalum 4'' + Daun Jendela Mati Kaca 5mm

Uk : 180 x 250 cm (2 Daun Jendela)


Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Alumunium Kaca 5mm Sliding + Acc Ex. Solid

Uk : 185 x 200 cm (2 Daun Jendela)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 275 x 200 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 280 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 3 Daun Jendela kaca mati Kaca 8 mm + Acc Ex. Solid

Uk : 280 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela Casement Kaca 8 mm + Acc Ex. Solid

Uk : 280 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Casement + 2 kaca mati Kaca 8 mm + Acc Ex. Solid

Uk : 280 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Casement + 4 kaca mati Kaca 8 mm + Acc Ex. Solid

Uk : 290 x 220 cm (1 Daun Pintu)


Kusen Alumunium Inkalum 4'' + 3 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 125 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 215 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 245 x 250 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 300 x 300 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Swing+1 Daun Jendela kaca mati Kaca 5mm + Acc Ex. S

Uk : 235 x 300 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Swing+1 Daun Jendela kaca mati Kaca 5mm + Acc Ex. S

Uk : 237 x 170 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 3 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid
Uk : 100 x 300 cm (1 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 1 Daun Jendela kaca mati Kaca 5mm + Acc Ex. Solid

Uk : 150 x 250 cm (3 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 3 Daun Jendela Alumunium Kaca 5mm Lipat + Acc Ex. Solid

Uk : 300 x 250 cm (5 Daun Pintu)

pintu lipat handerson, Rangka Holow 30x60 40x60 40x80 1,2mm + Plat panel Plat bending 1,2mm + rail atas dan belakang

Uk : 300 x 250 cm (3 Daun Pintu)

Kusen Alumunium Alexindo 4'' + 4 Daun Jendela Alumunium Kaca 8 mm Mati + Acc Ex. Solid

Uk : 315 x 220 cm (4 Daun Pintu)

Kusen Alumunium Inkalum 4'' + 2 Daun Jendela Sliding+ 2 Daun Jendela Alumunium Kaca 5mm Mati + A
vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.10 m' Rp 120,000 Rp 612,000


1.89 1.89 m2 Rp 1,900,000 Rp 1,005,291 Rp 1,900,000
1.00 ls Rp 879,200 Rp 879,200
TOTAL Rp 3,391,200

vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.10 m' Rp 120,000 Rp 732,000


1.89 2.00 m2 Rp 1,900,000 Rp 1,005,291 Rp 2,005,556
1.00 ls Rp 821,267 Rp 821,267
TOTAL Rp 3,558,822
vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.80 m' Rp 120,000 Rp 696,000


1.89 1.54 m2 Rp 1,800,000 Rp 952,381 Rp 1,466,667
1.00 ls Rp 648,800 Rp 648,800
TOTAL Rp 2,811,467
vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.30 m' Rp 120,000 Rp 636,000


1.89 1.30 m2 Rp 1,800,000 Rp 952,381 Rp 1,238,095
1.00 ls Rp 562,229 Rp 562,229
TOTAL Rp 2,436,324
vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.20 m' Rp 120,000 Rp 744,000


1.89 1.68 m2 Rp 1,900,000 Rp 1,005,291 Rp 1,688,889
1.00 ls Rp 729,867 Rp 729,867
TOTAL Rp 3,162,756
vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.20 m' Rp 120,000 Rp 744,000


1.89 1.98 m2 Rp 1,800,000 Rp 952,381 Rp 1,885,714
1.00 ls Rp 788,914 Rp 788,914
TOTAL Rp 3,418,629

vol real Vol Sat Harga Satuan harga real Jumlah Harga
7.10 m' Rp 120,000 Rp 852,000
1.89 3.24 m2 Rp 2,300,000 Rp 1,216,931 Rp 3,942,857
1.00 ls Rp 1,438,457 Rp 1,438,457
TOTAL Rp 6,233,314

vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.40 m' Rp 120,000 Rp 648,000


1.89 2.20 m2 Rp 2,800,000 Rp 1,481,481 Rp 3,259,259
1.00 ls Rp 1,172,178 Rp 1,172,178
TOTAL Rp 5,079,437

A
vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.30 m' Rp 120,000 Rp 756,000


0.54 2.34 m2 Rp 676,380 Rp 1,252,556 Rp 2,930,980
1.00 ls Rp - Rp -
TOTAL Rp 3,686,980

vol real Vol Sat Harga Satuan harga real Jumlah Harga

Kaca Mati + Acc Ex. 5.40 m' Rp 120,000 Rp 648,000


0.54 1.40 m2 Rp 676,380 Rp 1,252,556 Rp 1,753,578
1.00 ls Rp - Rp -
TOTAL Rp 2,401,578
vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.20 m' Rp 120,000 Rp 744,000


0.54 2.40 m2 Rp 676,380 Rp 1,252,556 Rp 3,006,133
1.00 ls Rp - Rp -
TOTAL Rp 3,750,133
vol real Vol Sat Harga Satuan harga real Jumlah Harga

7.60 m' Rp 120,000 Rp 912,000


0.54 3.52 m2 Rp 676,380 Rp 1,252,556 Rp 4,408,996
1.00 ls Rp - Rp -
TOTAL Rp 5,320,996
vol real Vol Sat Harga Satuan harga real Jumlah Harga
5.20 m' Rp 120,000 Rp 624,000
0.54 1.60 m2 Rp 676,380 Rp 1,252,556 Rp 2,004,089
1.00 ls Rp - Rp -
TOTAL Rp 2,628,089
vol real Vol Sat Harga Satuan harga real Jumlah Harga

4.60 m' Rp 120,000 Rp 552,000


0.54 1.12 m2 Rp 676,380 Rp 1,252,556 Rp 1,402,862
1.00 ls Rp - Rp -
TOTAL Rp 1,954,862

vol real Vol Sat Harga Satuan harga real Jumlah Harga

8.00 m' Rp 120,000 Rp 960,000


1.68 3.64 m2 Rp 1,749,640 Rp 1,041,452 Rp 3,790,887
1.00 ls Rp -
TOTAL Rp 4,750,887
vol real Vol Sat Harga Satuan harga real Jumlah Harga

6.00 m' Rp 120,000 Rp 720,000


1.68 2.21 m2 Rp 1,749,640 Rp 1,041,452 Rp 2,301,610
1.00 ls Rp -
TOTAL Rp 3,021,610
vol real Vol Sat Harga Satuan harga real Jumlah Harga

7.90 m' Rp 120,000 Rp 948,000


1.68 3.51 m2 Rp 1,749,640 Rp 1,041,452 Rp 3,655,498
1.00 ls Rp -
TOTAL Rp 4,603,498

vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.40 m' Rp 120,000 Rp 648,000


0.84 1.62 m2 Rp 491,600 Rp 585,238 Rp 948,086
1.00 ls Rp -
TOTAL Rp 1,596,086

vol real Vol Sat Harga Satuan harga real Jumlah Harga
8.60 m' Rp 120,000 Rp 1,032,000
2.24 4.50 m2 Rp 1,633,320 Rp 729,161 Rp 3,281,223
1.00 ls Rp -
TOTAL Rp 4,313,223
vol real Vol Sat Harga Satuan harga real Jumlah Harga

7.70 m' Rp 120,000 Rp 924,000


2.24 3.70 m2 Rp 1,633,320 Rp 729,161 Rp 2,697,895
1.00 ls Rp -
TOTAL Rp 3,621,895

vol real Vol Sat Harga Satuan harga real Jumlah Harga

9.50 m' Rp 105,000 Rp 997,500


1.98 5.50 m2 Rp 1,803,314 Rp 910,765 Rp 5,009,206
1.00 ls Rp - Rp -
TOTAL Rp 6,006,706
vol real Vol Sat Harga Satuan harga real Jumlah Harga

10.34 m' Rp 105,000 Rp 1,085,700


1.98 6.28 m2 Rp 1,803,314 Rp 910,765 Rp 5,718,691
1.00 ls Rp - Rp -
TOTAL Rp 6,804,391

vol real Vol Sat Harga Satuan harga real Jumlah Harga

5.60 m' Rp 105,000 Rp 588,000


1.98 1.60 m2 Rp 1,803,314 Rp 910,765 Rp 1,457,223
1.00 ls Rp - Rp -
TOTAL Rp 2,045,223
vol real Vol Sat Harga Satuan harga real Jumlah Harga

7.12 m' Rp 105,000 Rp 747,600


1.98 2.99 m2 Rp 1,803,314 Rp 910,765 Rp 2,725,008
1.00 ls Rp - Rp -
TOTAL Rp 3,472,608
vol real Vol Sat Harga Satuan harga real Jumlah Harga

8.52 m' Rp 105,000 Rp 894,600


1.98 3.94 m2 Rp 1,803,314 Rp 910,765 Rp 3,592,056
1.00 ls Rp - Rp -
TOTAL Rp 4,486,656
vol real Vol Sat Harga Satuan harga real Jumlah Harga
10.20 m' Rp 105,000 Rp 1,071,000
1.98 6.16 m2 Rp 1,803,314 Rp 910,765 Rp 5,610,310
1.00 ls Rp - Rp -
TOTAL Rp 6,681,310
vol real Vol Sat Harga Satuan harga real Jumlah Harga

7.50 m' Rp 105,000 Rp 787,500


1.98 3.13 m2 Rp 1,803,314 Rp 910,765 Rp 2,846,140
1.00 ls Rp - Rp -
TOTAL Rp 3,633,640
vol real Vol Sat Harga Satuan harga real Jumlah Harga

9.30 m' Rp 105,000 Rp 976,500


1.98 5.38 m2 Rp 1,803,314 Rp 910,765 Rp 4,895,360
1.00 ls Rp - Rp -
TOTAL Rp 5,871,860
vol real Vol Sat Harga Satuan harga real Jumlah Harga

9.90 m' Rp 105,000 Rp 1,039,500


1.98 6.13 m2 Rp 1,803,314 Rp 910,765 Rp 5,578,433
1.00 ls Rp - Rp -
TOTAL Rp 6,617,933

vol real Vol Sat Harga Satuan harga real Jumlah Harga

12.00 m' Rp 105,000 Rp 1,260,000


1.98 9.00 m2 Rp 1,803,314 Rp 910,765 Rp 8,196,882
1.00 ls Rp - Rp -
TOTAL Rp 9,456,882
vol real Vol Sat Harga Satuan harga real Jumlah Harga

10.70 m' Rp 105,000 Rp 1,123,500


1.98 7.05 m2 Rp 1,834,500 Rp 926,515 Rp 6,531,932
1.00 ls Rp - Rp -
TOTAL Rp 7,655,432

vol real Vol Sat Harga Satuan harga real Jumlah Harga

10.00 m' Rp 105,000 Rp 1,050,000


1.98 6.00 m2 Rp 1,803,314 Rp 910,765 Rp 5,464,588
1.00 ls Rp - Rp -
TOTAL Rp 6,514,588
vol real Vol Sat Harga Satuan harga real Jumlah Harga

8.00 m' Rp 105,000 Rp 840,000


1.98 3.00 m2 Rp 1,803,314 Rp 910,765 Rp 2,732,294
1.00 ls Rp - Rp -
TOTAL Rp 3,572,294

vol real Vol Sat Harga Satuan harga real Jumlah Harga

8.00 m' Rp 120,000 Rp 960,000


1.68 3.75 m2 Rp 4,000,000 Rp 2,380,952 Rp 8,928,571
1.00 ls Rp 1,483,286 Rp 1,483,286
TOTAL Rp 11,371,857

vol real Vol Sat Harga Satuan harga real Jumlah Harga

kang + aksesoris 7.50 m' Rp 120,000 Rp 900,000


6.6 7.50 m2 Rp 1,500,000 Rp 227,273 Rp 1,704,545
1.00 ls Rp - Rp -
TOTAL Rp 2,604,545

vol real Vol Sat Harga Satuan harga real Jumlah Harga

14.56 m' Rp 140,000 Rp 2,038,400


3.96 10.56 m2 Rp 2,803,946 Rp 708,067 Rp 7,477,189
1.00 ls Rp -
TOTAL Rp 9,515,589

vol real Vol Sat Harga Satuan harga real Jumlah Harga

ti + Acc Ex. Solid 10.70 m' Rp 120,000 Rp 1,284,000


3.96 6.93 m2 Rp 2,803,946 Rp 708,067 Rp 4,906,906
1.00 ls Rp -
TOTAL Rp 6,190,906
1.00 ls Pekerjaan Tang Rp -
TOTAL Rp -
b. Dak Toren (t = 10 cm)

c
Penutup Atap Lantai 3
Rangka Atap
Penutup Atap
Lisplank

Roof Drain Dak Rooftop

- Pekerjaan Cat Fasad


Lantai Teras kolam Ikan
NOTED

b Railing Balkon Belakang (Tinggi 120 cm)


c Railing Balkon Depan
d Railing Area Bebas Lantai 4

2 Pintu Gerbang Lipat Sliding (4 x 1,3 meter)


3 Gerbang Swing (100 x 130 cm)

4
5 Tangga Servis (Monkey Ladder) Ke Dak Torn
Rangka Atap Baja Ringan 0.75mm
Genteng Beton Flat Cisangkan
Lisplang Simpleplank 20cm Polos+cat

Cat Tembok Eksterior Jotashield Colour Extreme


Keramik 40 x 40 cm (Platinum) Matt
Toto CW 633 Tutup TC505 Putih
Toto CW 633 Tutup TC505 Putih
Railing
Tangga
Hollow
Model
Minimalis
Finish
Cat Spasi
10 cm
Hollow
Hitam
40x60x1.6
mm+hand
rail

Railing
Tangga
Hollow
Model
Minimalis
Finish
Cat Spasi
10 cm
Hollow
Hitam
40x60x1.6
mm+hand
rail

akang (Tinggi 120 cm)


Railing
Balkon
Kaca
Tempered
10 mm +
Stainless
Steel 40 x
60 mm +
40 x 40
mm Kilap
- 1,5 mm,
Tinggi
120 cm

Hollow 4 x 4 cm + 2 x 4 cm + Fin. Cat Hitam+ Hand

Gerbang
Rangka
Hollow
Model
Minimalis
Spasi 5
cm,
Hollow
Hitam 40
x 60 x 1.6
mm,
Hollow
Hitam 20
x 40 x 1.6
mm , Fin.
Cat
Gerbang
Rangka
Hollow
Model
Minimalis
Spasi 5
cm,
Hollow
Hitam 40
x 60 x 1.6
mm, m2 -
Hollow
Hitam 20
x 40 x 1.6
mm +
Expanded
Metal +
GRC
Motif
Kayu,
Fin. Cat

Besi Siku 4X4 cm , T = 3 mm + Pelat Bordes


unit T = 3 mm+ WF 150
Besi Hollow Hitam 2 x 4 x 0.12 cm + 4 xm'
4 x 0.12 cm, Fin.
- Cat
22 Rp 136,000
22 165300
k 20cm Polos+cat 8 19250

2
8

or Jotashield Colour Extreme 0 121321


206484
6.2
###
18

8
Rp 1,800,222

4
x 4 cm + Fin. Cat Hitam+ Handrail 5

Rp 888,000

5.2
Rp - Rp - Rp - Rp - 1.30 - - Rp 888,000

1 12600000
Rp - Rp - Rp - Rp - 3.20 - - Rp 250,000

0
Rp 46,000

38000
###
Rp 100,000
Rp 100,000 Rp 988,000 Rp - Rp - Rp -

Rp 100,000 Rp 350,000 Rp - Rp - Rp -
lintel lt 1 belum masuk

pemadatan tanha blm ke sum


Err:509
satuan Harga
Kusen 2.9 m' Rp 140,000.00
Daun Pintu/ Jendela 6.8 m' Rp 140,000.00
Kaca 1.76 m2 Rp 350,000.00
Sunblast 1.76 m2 Rp 40,000.00
ACC 0.3 ls Rp 2,044,400.00
Total

Err:509
satuan Harga
Kusen 5.25 m' Rp 140,000.00
Daun Pintu 1.08 m2 Rp 1,011,904.76
Daun Jendela 4.95 m' Rp 130,000.00
Kaca 0.68 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.35 ls Rp 2,709,357.14
Total

Err:509
satuan Harga
Kusen 5.2 m' Rp 140,000.00
Daun Pintu 6.8 m' Rp 140,000.00
Kaca 1.76 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.3 ls Rp 2,296,000.00
Total

Pintu Jendela Mushola (250 x 220 cm)


satuan Harga
Kusen 7.2 m' Rp 140,000.00
Daun Pintu/ Jendela 5.5 m' Rp 140,000.00
Kaca 5.5 m2 Rp 500,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 4,528,000.00
Total
Jendela Kamar Art, Foyer, Mushola (70 x 200 cm)
satuan Harga
Kusen 3.6 m' Rp 120,000.00
Daun Pintu/ Jendela 1.54 m' Rp 120,000.00
Kaca 1.54 m2
Sunblast m2
ACC 0.2 ls Rp 616,800.00
Total
Sekat Kaca Tempered Kamar Mandi (80 x 200 cm)
satuan Harga
Kusen 11.4 m' Rp 140,000.00
Daun Pintu/ Jendela 10.12 m' Rp 140,000.00
Kaca 10.12 m2 Rp 500,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 8,072,800.00
Total

Err:509
satuan Harga
Kusen 23.6 m' Rp 140,000.00
Daun Pintu/ Jendela 16.8 m' Rp 140,000.00
Kaca 8.55 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 8,648,500.00
Total

Err:509
satuan Harga
Kusen 23.6 m' Rp 140,000.00
Daun Pintu/ Jendela 16.8 m' Rp 140,000.00
Kaca 8.55 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 8,648,500.00
Total

Err:509
satuan Harga
Kusen 6.4 m' Rp 140,000.00
Daun Jendela 6.4 m' Rp 140,000.00
Ornamen m' Rp 60,000.00
Kaca 2.55 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 2,684,500.00
Total

Err:509
satuan Harga
Kusen 3.2 m' Rp 140,000.00
Daun Jendela 8.4 m' Rp 120,000.00
Kaca 0.6 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 1,666,000.00
Total

Jendela Depan (70 x 220 cm)


satuan Harga
Kusen 12.4 m' Rp 140,000.00
Daun Jendela 5.5 m' Rp 120,000.00
Kaca 5.5 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 4,321,000.00
Total

Jendela Balkon Rooftop (322 x 195 cm)


satuan Harga
Kusen 9.9 m' Rp 120,000.00
Daun Jendela 4 m' Rp 120,000.00
Kaca 4 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.2 ls Rp 3,068,000.00
Total

Jendela Kamar Anak 1 Depan (150 x 160 cm)


satuan Harga
Kusen 6.8 m' Rp 120,000.00
Daun Jendela 1.19 m' Rp 120,000.00
Kaca 1.19 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 1,375,300.00
Total

Bouvent Kamar Mandi (60 x 40 cm)


satuan Harga
Kusen 5.6 m' Rp 140,000.00
Daun Jendela 0.55 m' Rp 120,000.00
Kaca 0.55 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 1,042,500.00
Total

Jendela Mati (450 x 170 cm) 6 Daun


satuan Harga
Kusen 20.9 m' Rp 120,000.00
Daun Jendela 7.84 m' Rp 120,000.00
Kaca 7.84 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 6,192,800.00
Total
0
satuan Harga
Kusen 13.54 m' Rp 120,000.00
Daun Jendela 3.9 m' Rp 120,000.00
Kaca 3.9 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 3,457,800.00
Total
5
satuan Harga
Kusen 5.4 m' Rp 120,000.00
Daun Jendela 1.4 m' Rp 120,000.00
Kaca 1.4 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 1,306,000.00
Total

Jendela Kamar Tidur Anak 1 (135 x 260 cm)


satuan Harga
Kusen 11.42 m' Rp 140,000.00
Daun Jendela 10.68 m' Rp 120,000.00
Kaca 3.75 m2 Rp 350,000.00
Sunblast m2 Rp 40,000.00
ACC 0.25 ls Rp 4,192,900.00
Total
Jumlah
Rp 406,000.00
Rp 952,000.00
Rp 616,000.00
Rp 70,400.00
Rp 613,320.00
Rp 2,657,720.00

Jumlah
Rp 735,000.00
Rp 1,092,857.14
Rp 643,500.00
Rp 238,000.00
Rp -
Rp 948,275.00
Rp 3,657,632.14

Jumlah
Rp 728,000.00
Rp 952,000.00
Rp 616,000.00
Rp -
Rp 688,800.00
Rp 2,984,800.00

Jumlah
Rp 1,008,000.00
Rp 770,000.00
Rp 2,750,000.00
Rp -
Rp 1,132,000.00
Rp 5,660,000.00
x 200 cm)
Jumlah
Rp 432,000.00
Rp 184,800.00
Rp -
Rp -
Rp 123,360.00
Rp 740,160.00
0 x 200 cm)
Jumlah
Rp 1,596,000.00
Rp 1,416,800.00
Rp 5,060,000.00
Rp -
Rp 2,018,200.00
Rp 10,091,000.00

Jumlah
Rp 3,304,000.00
Rp 2,352,000.00
Rp 2,992,500.00
Rp -
Rp 2,162,125.00
Rp 10,810,625.00

Jumlah
Rp 3,304,000.00
Rp 2,352,000.00
Rp 2,992,500.00
Rp -
Rp 2,162,125.00
Rp 10,810,625.00

Jumlah
Rp 896,000.00
Rp 896,000.00
Rp -
Rp 892,500.00
Rp -
Rp 671,125.00
Rp 3,355,625.00

Jumlah
Rp 448,000.00
Rp 1,008,000.00
Rp 210,000.00
Rp -
Rp 416,500.00
Rp 2,082,500.00

Jumlah
Rp 1,736,000.00
Rp 660,000.00
Rp 1,925,000.00
Rp -
Rp 1,080,250.00
Rp 5,401,250.00

0.816667
Jumlah
Rp 1,188,000.00
Rp 480,000.00
Rp 1,400,000.00
Rp -
Rp 613,600.00
Rp 3,681,600.00

Jumlah
Rp 816,000.00
Rp 142,800.00
Rp 416,500.00
Rp -
Rp 343,825.00
Rp 1,719,125.00

Jumlah
Rp 784,000.00
Rp 66,000.00
Rp 192,500.00
Rp -
Rp 260,625.00
Rp 1,303,125.00

Jumlah
Rp 2,508,000.00
Rp 940,800.00
Rp 2,744,000.00
Rp -
Rp 1,548,200.00
Rp 7,741,000.00

Jumlah
Rp 1,624,800.00
Rp 468,000.00
Rp 1,365,000.00
Rp -
Rp 864,450.00
Rp 4,322,250.00

Jumlah
Rp 648,000.00
Rp 168,000.00
Rp 490,000.00
Rp -
Rp 326,500.00
Rp 1,632,500.00

Jumlah
Rp 1,598,800.00
Rp 1,281,600.00
Rp 1,312,500.00
Rp -
Rp 1,048,225.00
Rp 5,241,125.00
Hollow 4
x 4 cm +
2 x 4 cm
+ Fin. Cat
Putih
(Spasi 8
cm &
Spasi 10
cm) +
Handrail
Conwood,
Tebal 3
mm

Hollow 3 x 6 cm + Fin. Cat Putih (Hollow Minimalis) + Handrail Conwood, Tebal 3 mm

Hollow 4 x 6 cm + WireMest M10 + Fin Cat Putih

0
Water booster Wasser PB-318EA

0
0
880000
l Conwood, Tebal 3 mm 880000

1187500

2205700
https://www.tokopedia.com/aepkuswara/pintu-handerson-untuk-garasi-rumah
garasi-rumah
NO. ITEM Spek

A Pekerjaan Persiapan
1 Safety Tools
2 Alat Bantu Kerja
3 Mobilisasi dan Demobilisasi
4 Penginapan Tukang
5 Gudang Uk. 5x4 m
6 Pagar Keamanan Proyek
7 Pek Mengukur dan memasang Bouwplank
8 Akomodasi dan Transportasi
9 Keamanan
10 Sumur Bor Maksimal Kedalaman 30m
11 Shimizu Pompa Satelit
12 Bongkaran
13 Buang Puing / Sampah Proyek
14 Pembersihan Lahan

B Pekerjaan Tanah
1 Urugan Peninggi Lantai Tanah Urug / Pasir Urug T = 40 cm Dari Jalan
2 Galian Tanah Pondasi
3 Galian Tanah Sloof
4 Galian Tanah Pondasi Batu Kali
5 Galian Tanah Rolag
5 Urugan Tanah Kembali

C Pekerjaan Struktur
C. 1. Struktur Lantai 1
1. Pas. Pondasi Batu Kali
a Pas. Batu Kali 20 x 50 cm 1 pc : 6 ps
b Pas. Batu Kali 20 x 30 cm 1 pc : 6 ps
c Pas. Rolag 1/2 Bata Bata Merah

2. Pekerjaan Fondasi
a. Fondasi 30 x 30 x 20 cm Untuk Pagar 1 s/d 2 meter
- Beton Molen Site Mix, K-225
- Besi SNI Ø10 mm - 15cm
- Begisting Multriplek / Plastik Cor
b. Fondasi 50 x 50 x 20 cm Untuk Pagar 2 s/d 3 meter
- Beton Molen Site Mix, K-225
- Besi SNI Ø10 mm - 15cm
- Begisting Multriplek / Plastik Cor
c. Fondasi 60 x 60 x 20 cm Untuk Pagar 3 s/d 6 meter, Struktur Bentang < 2,5 Meter dan Gedung 1 Lantai
- Beton Molen Site Mix, K-225
- Besi SNI Ø10 mm - 15cm
- Begisting Multriplek / Plastik Cor
d. Fondasi 80 x 80 x 20 cm Untuk Struktur 2 s/d 2,5 Lantai
- Beton Molen Site Mix, K-225
- Besi SNI Ø12 mm - 15cm
- Begisting Multriplek / Plastik Cor
e. Fondasi 100 x 100 x 25 cm Untuk Struktur 2 s/d 3,5 Lantai + Bore Pile / Pancang Kedalaman Min 10 Meter
- Beton Molen Site Mix, K-225
- Besi SNI D13 mm - 15cm
- Begisting Multriplek / Plastik Cor
f. Fondasi Tangga 30 x 120 x 30 cm
- Beton Molen Site Mix, K-225
- Besi SNI Ø10 mm - 15cm
- Begisting Multriplek / Plastik Cor

3. Pekerjaan Sloof
a. Sloof 25 x 35 cm Untuk Struktur 3 Lantai Bentang 4 s/d 6 Meter
- Beton Molen Site Mix, K-225
- Besi SNI 6Ø 12 mm, 2Ø 10 mm, Ø 8 mm - 15cm
- Begisting Multriplek / Plastik Cor
b. Sloof 20 x 25 cm Untuk Struktur 2 s/d 2,5 Lantai Bentang 3 s/d 4 Meter
- Beton Molen Site Mix, K-225
- Besi SNI 4Ø 12 mm, 2Ø 8 mm, Ø 8 mm - 15cm
- Begisting Multriplek
c. Sloof 15 x 20 cm Untuk Struktur 2 s/d 2,5 Lantai Bentang 2,5 s/d 3 Meter
- Beton Molen Site Mix, K-225
- Besi SNI 4Ø 10 mm, 2Ø 8 mm, Ø 8 mm - 15cm
- Begisting Multriplek
d. Sloof 15 x 20 cm (Pagar) Untuk Struktur Pagar Tinggi 2,5 s/d 4 Meter atau Dinding Rumah 1 Lantai Bentang < 3 Meter
- Beton Molen Site Mix, K-225
- Besi SNI 4Ø 8 mm, Ø 6 mm - 15cm
- Begisting Multriplek
e. Sloof 15 x 15 cm Untuk Struktur Pagar Tinggi < 2,5 Meter, Bentang < 3 Mater
- Beton Molen Site Mix, K-225
- Besi SNI 4Ø 8 mm, Ø 6 mm - 15cm
- Begisting Multriplek

4. Pekerjaan Kolom
a. Kolom L& T 30 x 30 x 15 cm
- Beton Molen Site Mix, K-225
- Besi 5Ø 12 mm, 3Ø 10 mm, sengkang Ø8 mm-15cm,
- Begisting Multriplek
b. Kolom 25 x 35 cm Untuk Struktur 3 Lantai, Bentang 5 s/d 6 Meter
NO. ITEM Spek

- Beton Molen Site Mix, K-225


- Besi 4D 13 mm, 4Ø 10 mm, sengkang Ø8 mm-15cm,
- Begisting Multriplek
c. Kolom 20 x 35 Untuk Struktur 3 Lantai, Bentang 4 s/d 5 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 10 mm, sengkang Ø8 mm-15cm,
- Begisting Multriplek
NO. ITEM Spek

d. Kolom 20 x 30 cm Untuk Struktur 3 Lantai, Bentang 3 s/d 4 Meter


- Beton Molen Site Mix, K-225
- Besi 4D 12 mm, 6Ø 10 mm, sengkang Ø8 mm-15cm,
- Begisting Multriplek
e. Kolom 20 x 25 cm Untuk Struktur 3 Lantai, Bentang < 3 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 8 mm, sengkang Ø8 mm-15cm,
- Begisting Multriplek
f. Kolom 25 x 30 cm Untuk Struktur < 2,5 Lantai, Bentang 5 s/d 6 Meter
- Beton
- Besi
- Begisting
g. Kolom 20 x 30 cm Untuk Struktur < 2,5 Lantai, Bentang 4 s/d 5 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 10 mm, sengkang Ø8 mm-15 cm,
- Begisting Multriplek
h. Kolom 20 x 25 cm Untuk Struktur < 2,5 Lantai, Bentang 3 s/d 4 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 10 mm, sengkang Ø8 mm-15 cm,
- Begisting Multriplek
i. Kolom 20 x 20 cm Untuk Struktur < 2,5 Lantai, Bentang < 3 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 8 mm, sengkang Ø8 mm-20cm,
- Begisting Multriplek
j. Kolom 15 x 20 cm Untuk Kolom Pagar Tinggi 3 s/d 4 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, 2Ø 8 mm, sengkang Ø8 mm-20cm,
- Begisting Multriplek
k. Kolom 13 x 15 cm Untuk Kolom Pagar Tinggi < 3 Meter
- Beton Molen Site Mix, K-225
- Besi 4Ø 8 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek
l. Kolom 10 x 10 cm Untuk Semua Kolom Praktis Pertemuan Dinding, Opening Pintu & Jendela
- Beton Molen Site Mix, K-225
- Besi 4Ø 6 mm,sengkang Ø6 mm-20cm,
- Begisting Multriplek
NO. ITEM Spek

5. Pekerjaan Balok
a. Balok 20 x 30 cm
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 5Ø 10 mm sengkang Ø8 mm-15 cm
- Begisting Multriplek
b. Balok 20 x 25 cm
- Beton Molen Site Mix, K-225
- Besi 6Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek
c. Balok 15 x 25 cm
- Beton Molen Site Mix, K-225
- Besi 5Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek
d. Balok 15 x 20 cm
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek
e. Balok 13 x 15 cm
- Beton
- Besi
- Begisting
f. Balok Baja I WF
- Besi 298 x 149 x 6 x 8 mm – 12 M + Finishing Zinkromat
- Aksesoris Angkur, Siku,Base Plate dll
i. Balok Baja I WF
- Besi 250 x 125 x 6 x 9 mm – 12 M
- Aksesoris Angkur, Siku,Base Plate dll

6. Pekerjaan Tangga
a. Plat Tangga & Bordes
- Beton Molen Site Mix, K-225
- Besi Tul. Bawah Ø 10 mm - 15 cm, Tul. Atas Ø 8 mm - 15 cm (Dobel Layer)
- Begisting Multriplek
b. Anak Tangga
- Beton Molen Site Mix, K-225
- Besi Tul. Bawah Ø 8 mm - 15 cm, Tul. Atas Ø 8 mm - 15 cm (Singgel Layer)
- Begisting Multriplek

c. Sling Anak Tangga Cover Pipa Glfanis Ø1/2 "

7. Plat Lantai Garasi


- Beton Molen Site Mix, K-225
- Besi Wiremesh M7 Singgel Layer
- Begisting Multriplek
8. Plat Drainase
- Beton Molen Site Mix, K-225
- Besi Wiremesh M7 Dobel Layer
- Begisting Multriplek
9. Topian Beton
- Beton Molen Site Mix, K-175
- Besi Tul. Bawah Ø 8 mm - 20 cm, Tul. Atas Ø 6 mm - 20 cm (Singgel Layer)
- Begisting Multriplek
10. Janggutan Beton
- Beton Molen Site Mix, K-175
- Besi Tul. Bawah Ø 8 mm - 20 cm, Tul. Atas Ø 6 mm - 20 cm (Singgel Layer)
- Begisting Multriplek
11. Meja Beton
a. Plat
- Beton Molen Site Mix, K-175
- Besi Tul. Bawah Ø 8 mm - 20 cm, Tul. Atas Ø 6 mm - 20 cm (Singgel Layer)
- Begisting Multriplek
b. Balok 10 x 15 cm
- Beton Molen Site Mix, K-175
- Besi 4Ø 8 mm, sengkang Ø 8 mm - 20 cm
- Begisting Multriplek

C. 2. Struktur Lantai 2
1. Pekerjaan Plat Lantai t = 12 cm
- Beton Molen Site Mix, K225
- Besi M7 2 Layer
- Bondek Bondek 0,75 mm

2. Pekerjaan Plat Talang Air


- Beton
- Besi
- Begisting

3. Pekerjaan Kolom

a. Kolom L 30 x 30 x 15 cm
- Beton
- Besi
- Begisting

b. Kolom 20 x 30 cm
- Beton Molen Site Mix, K-225
- Besi 4Ø 12 mm, 2Ø 8 mm sengkang Ø8 mm-15 cm
- Begisting Multriplek

c. Kolom 20 x 25 cm
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, 2Ø 6 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek

d. Kolom 15 x 30 cm
- Beton
- Besi
- Begisting

e. Kolom 15 x 25 cm
- Beton
- Besi
- Begisting

f. Kolom 15 x 20 cm
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, sengkang Ø8 mm-15 cm
NO. ITEM Spek

- Begisting Multriplek

g. Kolom 10 x 15 cm
- Beton
- Besi
- Begisting

h. Kolom 10 x 10 cm
- Beton Molen Site Mix, K-175
- Besi 4Ø 6 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek

4. Pekerjaan Balok Lantai 2


a. Balok 25 x 40 cm Bentang 5 s/d 6 Meter Balok Utama
- Beton
- Besi
- Begisting
b. Balok 20 x 30 cm Bentang 5 s/d 6 Meter Balok Bagi
- Beton Molen Site Mix, K-225
- Besi 6Ø 13 mm, 2Ø 10 mm sengkang Ø8 mm-15 cm
- Begisting Multriplek
c. Balok 20 x 35 cm Bentang 4 s/d 5 Meter Balok Utama
- Beton
- Besi
- Begisting
d. Balok 20 x 25 cm Bentang 4 s/d 5 Meter Balok Bagi
- Beton Molen Site Mix, K-225
- Besi 6Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek
e. Balok 20 x 25 cm Bentang 3 Meter Balok Utama
- Beton
- Besi
- Begisting
f. Balok 15 x 20 cm Bentang 3 Meter Balok Bagi
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek
g. Balok 10 x 15 cm - Balok Untuk Struktur Parapet
- Beton Molen Site Mix, K-225
- Besi 4Ø 8 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek
h. Balok 15 x 20 cm - Balok Untuk Struktur Atap
- Beton Molen Site Mix, K-225
- Besi 4Ø 8 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek
i. Balok 10 x 15 cm - Balok Untuk Dinding Tanpa Beban
- Beton Molen Site Mix, K-225
- Besi 4Ø 6 mm, sengkang Ø 6 mm-20 cm
- Begisting Multriplek

5. Topian Beton
- Beton Molen Site Mix, K-175
- Besi Ø 8 mm-20 cm
- Begisting Multriplek

6. Janggutan Beton
- Beton Molen Site Mix, K-175
- Besi Ø 8 mm-20 cm
- Begisting Multriplek

7. Pekerjaan Tangga
a. Plat Tangga & Bordes
- Beton Molen Site Mix, K-225
- Besi Tul. Bawah Ø 10 mm - 15 cm, Tul. Atas Ø 8 mm - 15 cm (Dobel Layer)
- Begisting Multriplek
b. Anak Tangga
- Beton Molen Site Mix, K-225
- Besi Tul. Bawah Ø 8 mm - 15 cm, Tul. Atas Ø 8 mm - 15 cm (Singgel Layer)
- Begisting Multriplek

C. 3. Struktur Lantai 3
1. Pekerjaan Plat Lantai t = 12 cm
- Beton Molen Site Mix, K225
- Besi M7 2 Layer
- Bondek Bondek 0,75 mm

2. Pekerjaan Kolom
a Kolom 15 x 25 cm (Untuk Top Roof Hanya Beban Toren Bentang 3 s/d 4 m)
- Beton Molen Site Mix, K-225
NO. ITEM Spek

- Besi 4Ø 10 mm, , sengkang Ø8 mm-15 cm


- Begisting Multriplek

b Kolom 15 x 20 cm (Untuk Dak Talang Bentang 3 s/d 4 m)


- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek

c Kolom 10 x 15 cm (Untuk Parapet Bentang 3 m)


- Beton Molen Site Mix, K-175
- Besi 4Ø 8 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek

d Kolom 10 x 10 cm (Untuk Pertemuan dinding dan Opening Pintu / jendela Bentang 3 m)


- Beton Molen Site Mix, K-175
- Besi 4Ø 6 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek

3. Pekerjaan Balok
a. Balok 20 x 25 cm ( Bentang 3 Meter Balok Utama Toren)
- Beton Molen Site Mix, K-225
- Besi 4Ø 10 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek

b. Balok 15 x 20 cm ( Bentang 3 Meter Balok Bagi Toren)


- Beton Molen Site Mix, K-225
- Besi 4Ø 8 mm, sengkang Ø8 mm-15 cm
- Begisting Multriplek

c. Balok 10 x 15 cm ( Bentang 3 Meter Balok Parapet )


- Beton Molen Site Mix, K-225
- Besi 4Ø 8 mm, sengkang Ø6 mm-15 cm
- Begisting Multriplek

C. 4. Struktur Top Roof


1. Pekerjaan Plat Lantai t = 12 cm
- Beton Molen Site Mix, K225
- Besi M7 2 Layer
- Bondek Bondek 0,75 mm

D. Pekerjaan Atap
1. Atap Bangunan Utama
a. Rangka Baja Ringan
- Rangka Baja 0,75 mm
- Rangka Baja 1 mm
- Rangka Baja 1,2 mm

b. Aluminium Foil
- Singgel Foam
- Dobel Foam

c. Atap
- Genteng Beton Flat
- Genteng Spandek Berpasir
- Genteng Metal Berpasir Berpasir

d. Nok Genteng
- Genteng Beton Flat
- Genteng Spandek Berpasir
- Genteng Metal Berpasir Berpasir

2. Atap Area Rooftop / Canopy


a. Atap Solar Flat
b. Atap Alderon
c. Atap Kaca Tempred
d. Atap Spandek

3. Finishing Atap
a. Roof Drain
b. Sika Top
c. Water Profing
d. Screding
e. Flashing Ban - Banan
Up Cealing (m')
Plafond Gypsum Flat Tengah Pinggir
1 KT Tamu 7.3 7.2 2.2
KM. KT Tamu 2.71
Gudang 3.762
Garasi Sepeda 3.762
Dapur Kotor 2.64
Dapur Kotor (Miring) 6.45
Dapur Bersih & Ruant Utama 26.65 19.35 10.5
KT ART 5.27 1.2
Area Cuci 6.6
65.144
2 KT Utama 13.67 9.4 4
WIC 17.87 11.1 5
KM. KT Utama 14.71 8.2
Foyer 6.35 6.43
52.6
3 Foyer 12.67 12.4 5
KT Anak 11.82 10.4 5
KM KT Anak 4.7
Home Teater 10.97 9.4 0
40.16

GRC Flat
taman samping 0.81
taman belakang & depan 20.93
Carport Depan 2.51
24.25
Expose + Mu 200
KM ART 1.6
Powder Room 4.6
6.2
p Cealing (m')
Total Atap Utama Luas
9.4 1 KT Tamu, Gudang & R. Sepeda 17.195
0 Dapur Kotor 8.47
0 Ruang Cuci Jemur 8.58
0
0 2 Tidak Ada 0
0
29.85 3 Foyer tangga 8.245
1.2 KT Anak & Teater Home 29.945
0
40.45
13.4 Pendukung
16.1 1 Carport 49.56
8.2 Samping Karport 23.31
6.43 Gudang 1.45
44.13 R. Sepeda 0.5
Dapur Kotor 1
17.4 R. Cuci Jemur 3.68
15.4
0 2 Tidak Ada
9.4
42.2 3 Void Tangga 1.105
Area Bebas (Toren) 8.05
Lisplank Flahing BATU KALI lebar
8 13.25 Horizontal 0.3
3 8.25 0.3
3.9 8.3 0.3

12.25 Kll Bangunan 0.3


0.3
3.75 8.9 0.3
4.85 17.25
panjang tinggi total (A)
14.80 1.00 4.44
8.90 1.00 2.67 7.11
1.00 0.00

27.70 1.00 8.31


0.50 0.00 8.31
0.50 0.00

66
A Fondasi 0.80 x 0.80 x 0.30 m
- Jumlah = 18.00 Ttk
- Jarak = 0.15 cm
- Jml Besi - X = 7.00 bh 13 mm → 12.50 kg
- Jml Besi - Y = 7.00 bh 13 mm → 12.50 kg
- Besi
- Jml Besi - X = 24.00 bt → 299.93 kg 168.00
- Jml Besi - Y = 24.00 bt → 299.93 kg 125.00
Jumlah = 599.86 kg 68.00
Volume 77
- Beton = 3.46 m3 20.00
- Besi = 599.86 m2 24.00
- Begisting = 17.28 m2 22.00
- Galian Tanah = 23.04 m3 9.00
513.00
B Fondasi 0.60 x 0.60 x 0.30 m
- Jumlah = 4.00 Ttk
- Jarak = 0.15 cm
- Jml Besi - X = 5.00 bh 13 mm → 12.50 kg
- Jml Besi - Y = 5.00 bh 13 mm → 12.50 kg
- Besi
- Jml Besi - X = 3.00 bt → 37.49 kg
- Jml Besi - Y = 3.00 bt → 37.49 kg
Jumlah = 74.98 kg
Volume
- Beton = 0.43 m3
- Besi = 74.98 m2
- Begisting = 2.88 m2
- Galian Tanah = 2.88 m3
B Fondasi 0.40 x 0.40 x 0.20 m
- Jumlah = 11.00 Ttk
- Jarak = 0.15 cm
- Jml Besi - X = 4.00 bh 13 mm → 12.50 kg
- Jml Besi - Y = 4.00 bh 13 mm → 12.50 kg
- Besi
- Jml Besi - X = 5.00 bt → 62.49 kg
- Jml Besi - Y = 5.00 bt → 62.49 kg
Jumlah = 124.97 kg
Volume
- Beton = 0.35 m3
- Besi = 124.97 m2
- Begisting = 3.52 m2
- Galian Tanah = 1.76 m3

C. Fondasi 1.10 x 0.30 x 0.40 m


- Jumlah = 1.00 Ttk
- Jarak = 0.15 cm
- Jml Besi - X = 9.00 bh 10 mm → 7.39 kg
- Jml Besi - Y = 3.00 bh 10 mm → 7.39 kg
- Besi
- Jml Besi - X = 2.00 bt → 14.79 kg
- Jml Besi - Y = 1.00 bt → 7.39 kg
Jumlah = 22.18 kg
Volume
- Beton = 0.13 m3
- Besi = 22.18 m2
- Begisting = 1.12 m2
- Galian Tanah = 0.33 m3
a. Sloof 0.20 x 0.25 m
- Panjang = 43.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 25.8 bt → 274.73 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 18.43 bt → 136.27 kg
Jumlah = 411.00 kg
Volume
- Beton = 2.15 m3
- Besi = 411.00 kg
- Begisting = 25.80 m2

b. Sloof 0.15 x 0.25 m


- Panjang = 46.90 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = 2.00 bh 12 mm → 10.65 kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 18.8 bt → 199.76 kg
- Bagi Ø = 9.4 bt → 99.88 kg
- Begel Ø = 17.87 bt → 84.56 kg
Jumlah = 384.20 kg
Volume
- Beton = 1.76 m3
- Besi = 384.20 kg
- Begisting = 23.45 m2

c. Sloof 0.15 x 0.15 m


- Panjang = 33.45 m
- Jarak Sengkang = 0.15 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 6 mm → 2.66 kg
- Besi
- Utama Ø = 13.4 bt → 63.32 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 11.15 bt → 29.68 kg
Jumlah = 93.00 kg
Volume
- Beton = 0.75 m3
- Besi = 93.00 kg
- Begisting = 12.04 m2
LANTAI 1
A. Kolom Split 0.20 x 0.40 m
- Tinggi Kolom = 5.50 m
- Titik = 6.00 ttk
= 0.18 m
- Jml Besi Utama = 10.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = bh mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 28.9 bt → 360.85 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 22.63 bt → 167.33 kg
Jumlah = 528.18 kg
Volume
- Beton = 2.64 m3
- Besi = 528.18 kg
- Begisting = 39.60 m2
A. Kolom Depan 0.20 x 0.40 m
- Tinggi Kolom = 5.10 m
- Titik = 5.00 ttk
= 0.18 m
- Jml Besi Utama = 10.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = bh mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 22.5 bt → 281.50 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 17.49 bt → 129.30 kg
Jumlah = 410.80 kg
Volume
- Beton = 2.04 m3
- Besi = 410.80 kg
- Begisting = 30.60 m2
C. Kolom 0.15 x 0.30 m
- Tinggi Kolom = 5.30 m
- Titik = 11.00 ttk
= 0.18 m
- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 29.9 bt → 374.22 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 29.98 bt → 141.90 kg
Jumlah = 516.12 kg
Volume
- Beton = 2.62 m3
- Besi = 516.12 kg
- Begisting = 52.47 m2
C. Kolom 0.15 x 0.30 m
- Tinggi Kolom = 5.50 m
- Titik = 2.00 ttk
= 0.18 m
- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 6.3 bt → 79.04 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 5.66 bt → 41.83 kg
Jumlah = 120.88 kg
Volume
- Beton = 0.50 m3
- Besi = 120.88 kg
- Begisting = 9.90 m2
D. Kolom 0.15 x 0.15 m
- Tinggi Kolom = 3.45 m
- Titik = 14.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 16.4 bt → 77.83 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 14.49 bt → 68.58 kg
Jumlah = 146.40 kg
Volume
- Beton = 1.09 m3
- Besi = 146.40 kg
- Begisting = 28.98 m2
LANTAI 2
B. Kolom 0.20 x 0.30 m
- Tinggi Kolom = 3.80 m
- Titik = 14.00 ttk
= 0.18 m
- Jml Besi Utama = 8.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 36.2 bt → 452.73 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 30.40 bt → 224.80 kg
Jumlah = 677.53 kg
Volume
- Beton = 3.19 m3
- Besi = 677.53 kg
- Begisting = 53.20 m2

C. Kolom 0.15 x 0.35 m


- Tinggi Kolom = 3.80 m
- Titik = 7.00 ttk
= 0.18 m
- Jml Besi Utama = 8.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 18.5 bt → 231.11 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 15.20 bt → 112.40 kg
Jumlah = 343.51 kg
Volume
- Beton = 1.40 m3
- Besi = 343.51 kg
- Begisting = 26.60 m2

a. Kolom 0.15 x 0.25 m


- Tinggi Kolom = 3.60 m
- Titik = 2.00 ttk
= 0.18 m
- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 2.8 bt → 29.39 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 3.29 bt → 15.58 kg
Jumlah = 44.97 kg
Volume
- Beton = 0.27 m3
- Besi = 44.97 kg
- Begisting = 5.76 m2
B. Kolom 0.15 x 0.20 m
- Tinggi Kolom = 3.60 m
- Titik = 14.00 ttk
= 0.18 m
- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 17.2 bt → 126.89 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 20.16 bt → 95.41 kg
Jumlah = 222.30 kg
Volume
- Beton = 1.51 m3
- Besi = 222.30 kg
- Begisting = 35.28 m2
D. Kolom 0.10 x 0.10 m
- Tinggi Kolom = 3.60 m
- Titik = 14.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 17.2 bt → 81.21 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 10.08 bt → 47.70 kg
Jumlah = 128.92 kg
Volume
- Beton = 0.50 m3
- Besi = 128.92 kg
- Begisting = 20.16 m2
LANTAI 3
B. Kolom 0.15 x 0.20 m
- Tinggi Kolom = 3.80 m
- Titik = 14.00 ttk
= 0.18 m
- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 18.1 bt → 133.94 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 21.28 bt → 100.71 kg
Jumlah = 234.65 kg
Volume
- Beton = 1.60 m3
- Besi = 234.65 kg
- Begisting = 37.24 m2
B. Kolom 0.15 x 0.35 m
- Tinggi Kolom = 3.80 m
- Titik = 6.00 ttk
= 0.18 m
- Jml Besi Utama = 8.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 16.0 bt → 199.45 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 13.03 bt → 96.34 kg
Jumlah = 295.80 kg
Volume
- Beton = 1.20 m3
- Besi = 295.80 kg
- Begisting = 22.80 m2

b. Kolom 0.10 x 0.10 m


- Tinggi Kolom = 3.80 m
- Titik = 4.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 5.4 bt → 25.78 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 3.04 bt → 14.39 kg
Jumlah = 40.16 kg
Volume
- Beton = 0.15 m3
- Besi = 40.16 kg
- Begisting = 6.08 m2
LANTAI 4
a. Kolom 0.15 x 0.30 m
- Tinggi Kolom = 3.80 m
- Titik = 7.00 ttk
= 0.18 m
- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 13.9 bt → 173.33 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 13.68 bt → 101.16 kg
Jumlah = 274.49 kg
Volume
- Beton = 1.20 m3
- Besi = 274.49 kg
- Begisting = 23.94 m2
b. Kolom 0.10 x 0.10 m
- Tinggi Kolom = 3.80 m
- Titik = 8.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 10.5 bt → 49.76 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 6.08 bt → 28.77 kg
Jumlah = 78.53 kg
Volume
- Beton = 0.30 m3
- Besi = 78.53 kg
- Begisting = 12.16 m2
c. Kolom 0.15 x 0.20 m TANGGA
- Tinggi Kolom = 4.00 m
- Titik = 1.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg/bt
- Jml Besi Bagi = 2.00 bh 8 mm → 4.73 kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 1.7 bt → 12.82 kg
- Bagi Ø = 0.8 bt → 3.63 kg
- Begel Ø = 1.40 bt → 6.63 kg
Jumlah = 23.07 kg
Volume
- Beton = 0.12 m3
- Besi = 23.07 kg
- Begisting = 2.80 m2
Kolom Lantai 2
a. Kolom 0.15 x 0.30 m
- Tinggi Kolom = 4.00 m
- Titik = 19.00 ttk
= 0.18 m
- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 10 mm → 7.39 kg/bt
- Besi
- Utama Ø = 38.6 bt → 482.39 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 39.09 bt → 289.03 kg
Jumlah = 771.41 kg
Volume
- Beton = 3.42 m3
- Besi = 771.41 kg
- Begisting = 68.40 m2

b. Kolom 0.10 x 0.10 m


- Tinggi Kolom = 3.80 m
- Titik = 9.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 11.8 bt → 55.75 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 6.84 bt → 32.37 kg
Jumlah = 88.12 kg
Volume
- Beton = 0.34 m3
- Besi = 88.12 kg
- Begisting = 13.68 m2

c. Kolom 0.15 x 0.20 m TANGGA


- Tinggi Kolom = 4.00 m
- Titik = 1.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg/bt
- Jml Besi Bagi = 2.00 bh 8 mm → 4.73 kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 1.7 bt → 12.82 kg
- Bagi Ø = 0.8 bt → 3.63 kg
- Begel Ø = 1.40 bt → 6.63 kg
Jumlah = 23.07 kg
Volume
- Beton = 0.12 m3
- Besi = 23.07 kg
- Begisting = 2.80 m2

Kolom Lantai 3
a. Kolom 0.15 x 0.25 m
- Tinggi Kolom = 3.90 m
- Titik = 11.00 ttk
= 0.18 m
- Jml Besi Utama = 6.00 bh 12 mm → 10.65 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 22.0 bt → 234.64 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 19.61 bt → 92.81 kg
Jumlah = 327.45 kg
Volume
- Beton = 1.61 m3
- Besi = 327.45 kg
- Begisting = 34.32 m2

d. Kolom 0.10 x 0.10 m


- Tinggi Kolom = 3.90 m
- Titik = 11.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 14.7 bt → 69.52 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 8.58 bt → 40.61 kg
Jumlah = 110.13 kg
Volume
- Beton = 0.43 m3
- Besi = 110.13 kg
- Begisting = 17.16 m2

Kolom PARAPET
a. Kolom 0.13 x 0.13 m
- Tinggi Kolom = 2.00 m
- Titik = 5.00 ttk
= 0.20 m
- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg/bt
- Jml Besi Bagi = - bh - mm → - kg/bt
- Begel = 1.00 bh 8 mm → 4.73 kg/bt
- Besi
- Utama Ø = 3.5 bt → 16.72 kg
- Bagi Ø = 0.1 bt → - kg
- Begel Ø = 2.60 bt → 12.30 kg
Jumlah = 29.03 kg
Volume
- Beton = 0.17 m3
- Besi = 29.03 kg
- Begisting = 5.20 m2
LANTAI 1
a. Balok Split 0.20 x 0.40 m
- Panjang = 17.20 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 10.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = bh mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 17.2 bt → 214.95 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 9.83 bt → 72.68 kg
Jumlah = 287.63 kg
Volume
- Beton = 1.38 m3
- Besi = 287.63 kg
- Begisting = 13.76 m2
a. Balok Depan 0.20 x 0.40 m
- Panjang = 8.00 m 44
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 10.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = bh mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 8.0 bt → 99.98 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 4.57 bt → 33.80 kg
Jumlah = 133.78 kg
Volume
- Beton = 0.64 m3
- Besi = 133.78 kg
- Begisting = 6.40 m2
c. Balok 0.15 x 0.35 m
- Panjang = 49.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 8.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 39.2 bt → 489.88 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 23.33 bt → 172.54 kg
Jumlah = 662.43 kg
Volume
- Beton = 2.57 m3
- Besi = 662.43 kg
- Begisting = 34.30 m2
c. Balok 0.15 x 0.25 m
- Panjang = 56.70 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 22.7 bt → 241.50 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 21.60 bt → 102.22 kg
Jumlah = 343.73 kg
Volume
- Beton = 2.13 m3
- Besi = 343.73 kg
- Begisting = 28.35 m2
b. Balok 0.15 x 0.25 m
- Panjang = 8.50 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 3.4 bt → 36.20 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 3.24 bt → 15.32 kg
Jumlah = 51.53 kg
Volume
- Beton = 0.32 m3
- Besi = 51.53 kg
- Begisting = 4.25 m2
b. Balok 0.15 x 0.15 m
- Panjang = 8.50 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 3.4 bt → 25.14 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 2.43 bt → 11.49 kg
Jumlah = 36.64 kg
Volume
- Beton = 0.19 m3
- Besi = 36.64 kg
- Begisting = 2.55 m2
LANTAI 2
b. Balok 0.20 x 0.40 m
- Panjang = m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 10.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = - bt → - kg
- Bagi Ø = - bt → - kg
- Begel Ø = - bt → - kg
Jumlah = - kg
Volume
- Beton = - m3
- Besi = - kg
- Begisting = - m2

b. Balok 0.20 x 0.30 m


- Panjang = 55.40 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 8.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 44.3 bt → 553.87 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 26.38 bt → 195.08 kg
Jumlah = 748.95 kg
Volume
- Beton = 3.32 m3
- Besi = 748.95 kg
- Begisting = 33.24 m2

c. Balok 0.15 x 0.30 m


- Panjang = 23.25 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 14.0 bt → 174.33 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 9.96 bt → 73.68 kg
Jumlah = 248.02 kg
Volume
- Beton = 1.05 m3
- Besi = 248.02 kg
- Begisting = 13.95 m2
c. Balok 0.15 x 0.25 m
- Panjang = 3.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 1.2 bt → 12.78 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 1.14 bt → 5.41 kg
Jumlah = 18.19 kg
Volume
- Beton = 0.11 m3
- Besi = 18.19 kg
- Begisting = 1.50 m2
c. Balok 0.15 x 0.20 m
- Panjang = 10.20 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 4.1 bt → 30.17 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 3.40 bt → 16.09 kg
Jumlah = 46.26 kg
Volume
- Beton = 0.31 m3
- Besi = 46.26 kg
- Begisting = 4.08 m2
b. Balok 0.15 x 0.15 m
- Panjang = 14.80 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 5.9 bt → 43.78 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 4.23 bt → 20.01 kg
Jumlah = 63.79 kg
Volume
- Beton = 0.33 m3
- Besi = 63.79 kg
- Begisting = 4.44 m2
LANTAI 3
d. Balok 0.15 x 0.20 m
- Panjang = 41.40 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 16.6 bt → 122.46 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 13.80 bt → 102.05 kg
Jumlah = 224.50 kg
Volume
- Beton = 1.24 m3
- Besi = 224.50 kg
- Begisting = 16.56 m2

c. Balok 0.15 x 0.30 m


- Panjang = 7.30 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 4.4 bt → 46.64 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 3.13 bt → 14.81 kg
Jumlah = 61.45 kg
Volume
- Beton = 0.33 m3
- Besi = 61.45 kg
- Begisting = 4.38 m2
d. Balok Latai Lt 4 0.10 x 0.10 m
- Panjang = 4.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 1.6 bt → 7.57 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 0.67 bt → 3.16 kg
Jumlah = 10.73 kg
Volume
- Beton = 0.04 m3
- Besi = 10.73 kg
- Begisting = 0.96 m2
d. Balok Latai Lt 1 0.10 x 0.10 m
- Panjang = 25.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 10.0 bt → 47.33 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 4.17 bt → 19.72 kg
Jumlah = 67.05 kg
Volume
- Beton = 0.25 m3
- Besi = 67.05 kg
- Begisting = 6.00 m2
d. Balok Latai 0.10 x 0.10 m
- Panjang = 10.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 4.0 bt → 18.93 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 1.67 bt → 7.89 kg
Jumlah = 26.82 kg
Volume
- Beton = 0.10 m3
- Besi = 26.82 kg
- Begisting = 2.40 m2
d. Balok Latai 2 0.10 x 0.10 m
- Panjang = 15.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 6.0 bt → 28.40 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 2.50 bt → 11.83 kg
Jumlah = 40.23 kg
Volume
- Beton = 0.15 m3
- Besi = 40.23 kg
- Begisting = 3.60 m2
LANTAI 4
c. Balok 0.15 x 0.30 m
- Panjang = 22.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 13.2 bt → 164.96 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 9.43 bt → 69.72 kg
Jumlah = 234.68 kg
Volume
- Beton = 0.99 m3
- Besi = 234.68 kg
- Begisting = 13.20 m2
d. Balok 0.15 x 0.20 m
- Panjang = 6.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = bh mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 2.4 bt → 25.56 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 1.75 bt → 8.28 kg
Jumlah = 33.84 kg
Volume
- Beton = 0.18 m3
- Besi = 33.84 kg
- Begisting = 2.40 m2
d. Balok Tangga 0.15 x 0.20 m
- Panjang = 7.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = 2.00 bh 8 mm → 4.73 kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 2.8 bt → 20.71 kg
- Bagi Ø = 1.4 bt → 6.63 kg
- Begel Ø = 2.04 bt → 9.66 kg
Jumlah = 36.99 kg
Volume
- Beton = 0.21 m3
- Besi = 36.99 kg
- Begisting = 2.80 m2

BALOK LANTAI 2
a. Balok 0.15 x 0.30 m
- Panjang = 65.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 13 mm → 12.50 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 10 mm → 7.39 kg
- Besi
- Utama Ø = 39.0 bt → 487.38 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 27.86 bt → 206.00 kg
Jumlah = 693.38 kg
Volume
- Beton = 2.93 m3
- Besi = 693.38 kg
- Begisting = 39.00 m2

B. Balok 0.15 x 0.25 m


- Panjang = 10.50 m
- Jarak Sengkang = 0.18 m
- Jml Besi Utama = 6.00 bh 12 mm → 10.65 kg
- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 6.3 bt → 67.08 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 4.00 bt → 18.93 kg
Jumlah = 86.02 kg
Volume
- Beton = 0.39 m3
- Besi = 86.02 kg
- Begisting = 5.25 m2

C. Balok 0.15 x 0.20 m


- Panjang = 10.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 4.0 bt → 29.58 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 3.33 bt → 15.78 kg
Jumlah = 45.35 kg
Volume
- Beton = 0.30 m3
- Besi = 45.35 kg
- Begisting = 4.00 m2

D. Balok 0.10 x 0.10 m LINTEL


- Panjang = 14.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 5.6 bt → 26.50 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 2.33 bt → 11.04 kg
Jumlah = 37.55 kg
Volume
- Beton = 0.14 m3
- Besi = 37.55 kg
- Begisting = 2.80 m2

E. Balok 0.15 x 0.20 m TANGGA


- Panjang = 2.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = 2.00 bh 8 mm → 4.73 kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 0.8 bt → 5.92 kg
- Bagi Ø = 0.4 bt → 1.89 kg
- Begel Ø = 0.58 bt → 2.76 kg
Jumlah = 10.57 kg
Volume
- Beton = 0.06 m3
- Besi = 10.57 kg
- Begisting = 0.80 m2

BALOK LANTAI 3
a. Balok 0.15 x 0.25 m
- Panjang = 65.50 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 6.00 bh 12 mm → 10.65 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 39.3 bt → 418.48 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 24.95 bt → 118.09 kg
Jumlah = 536.57 kg
Volume
- Beton = 2.46 m3
- Besi = 536.57 kg
- Begisting = 32.75 m2

b. Balok 0.15 x 0.15 m


- Panjang = 10.00 m
- Jarak Sengkang = 0.18 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 4.0 bt → 29.58 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 2.86 bt → 13.52 kg
Jumlah = 43.10 kg
Volume
- Beton = 0.23 m3
- Besi = 43.10 kg
- Begisting = 3.00 m2

c. Balok 0.10 x 0.10 m LINTEL


- Panjang = 13.75 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 5.5 bt → 26.03 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 2.29 bt → 10.85 kg
Jumlah = 36.87 kg
Volume
- Beton = 0.14 m3
- Besi = 36.87 kg
- Begisting = 2.75 m2

PARAPET
a. Balok 0.13 x 0.15 m
- Panjang = 23.00 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 8 mm → 4.73 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 9.2 bt → 43.54 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 5.37 bt → 25.40 kg
Jumlah = 68.94 kg
Volume
- Beton = 0.45 m3
- Besi = 68.94 kg
- Begisting = 6.90 m2

a. Balok 0.15 x 0.20 m


- Panjang = 15.90 m
- Jarak Sengkang = 0.20 m

- Jml Besi Utama = 4.00 bh 10 mm → 7.39 kg


- Jml Besi Bagi = - bh - mm → - kg
- Begel = 1.00 bh 8 mm → 4.73 kg
- Besi
- Utama Ø = 6.4 bt → 47.03 kg
- Bagi Ø = - bt → - kg
- Begel Ø = 4.64 bt → 21.95 kg
Jumlah = 68.98 kg
Volume
- Beton = 0.48 m3
- Besi = 68.98 kg
- Begisting = 6.36 m2
TANGGA BETON
A. Pekerjaan Tangga LT. 01
1. Plat Tangga & Bordes
- Panjang = 7.00 m
- Lebar = 1.00 m
- Tebal = 0.12 m
- Jml Besi - X = 35.00 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 5.00 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 7.84 bt → 37.10 kg
Jml Besi - Y = 7.12 bt → 33.70 kg
Jumlah = 141.60 kg
- Volume
- Beton = 0.84 m3
- Besi = 141.60 kg
- Begisting = 8.68 m2

2. Anak Tangga
- Panjang = 1.00 m
- aantrade = 0.30 m
- Optrade = 0.20 m
- Floor To Flor = 3.80 m FtC+Ceiling+Beam+Plat
- Jumlah Trap = 19.00 bh
- Jml Besi - X = 2.00 bt 6 mm → 2.66 kg → 0.20 m
- Jml Besi - Y = 5.00 bt 6 mm → 2.66 kg → 0.20 m
- Besi
Jml Besi - X = 4.12 bt → 10.96 kg
Jml Besi - Y = 3.96 bt → 10.54 kg
Jumlah = 21.50 kg
- Volume
- Beton = 0.57 m3
- Besi = 21.50 kg
- Begisting = 6.08 m2

B. Pekerjaan Tangga LT. 03


1. Plat Tangga & Bordes
- Panjang = 2.00 m
- Lebar = 1.00 m
- Tebal = 0.12 m
- Jml Besi - X = 10.00 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 5.00 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 2.24 bt → 10.60 kg
Jml Besi - Y = 2.12 bt → 10.03 kg
Jumlah = 41.27 kg
- Volume
- Beton = 0.24 m3
- Besi = 41.27 kg
- Begisting = 2.48 m2

2. Anak Tangga
- Panjang = 1.00 m
- aantrade = 0.30 m
- Optrade = 0.20 m
- Floor To Flor = 0.40 m FtC+Ceiling+Beam+Plat
- Jumlah Trap = 2.00 bh
- Jml Besi - X = 2.00 bt 6 mm → 2.66 kg → 0.20 m
- Jml Besi - Y = 5.00 bt 6 mm → 2.66 kg → 0.20 m
- Besi
Jml Besi - X = 0.43 bt → 1.15 kg
Jml Besi - Y = 0.42 bt → 1.11 kg
Jumlah = 2.26 kg
- Volume
- Beton = 0.06 m3
- Besi = 2.26 kg
- Begisting = 0.64 m2

C. Pekerjaan Tangga Akses Entrnace


1. Plat Tangga & Bordes
- Panjang = 1.60 m
- Lebar = 1.85 m
- Tebal = 0.12 m
- Jml Besi - X = 8.00 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 9.25 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 3.15 bt → 14.92 kg
Jml Besi - Y = 3.18 bt → 15.06 kg
Jumlah = 59.95 kg
- Volume
- Beton = 0.36 m3
- Besi = 59.95 kg
- Begisting = 3.34 m2

2. Plat Tangga & Bordes


- Panjang = 0.60 m
- Lebar = 1.85 m
- Tebal = 0.12 m
- Jml Besi - X = 3.00 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 9.25 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 1.18 bt → 5.59 kg
Jml Besi - Y = 1.33 bt → 6.30 kg
Jumlah = 23.80 kg
- Volume
- Beton = 0.13 m3
- Besi = 23.80 kg
- Begisting = 1.25 m2

3. Plat Tangga & Bordes


- Panjang = 0.30 m
- Lebar = 1.85 m
- Tebal = 0.12 m
- Jml Besi - X = 1.50 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 9.25 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 0.59 bt → 2.80 kg
Jml Besi - Y = 0.78 bt → 3.68 kg
Jumlah = 12.95 kg
- Volume
- Beton = 0.07 m3
- Besi = 12.95 kg
- Begisting = 0.63 m2

D. Pekerjaan Tangga Akses Teras Utama


1. Plat Tangga & Bordes
- Panjang = 1.15 m
- Lebar = 1.85 m
- Tebal = 0.12 m
- Jml Besi - X = 5.75 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 9.25 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 2.27 bt → 10.72 kg
Jml Besi - Y = 2.35 bt → 11.12 kg
Jumlah = 43.68 kg
- Volume
- Beton = 0.26 m3
- Besi = 43.68 kg
- Begisting = 2.40 m2

2 Plat Tangga & Bordes


- Panjang = 0.55 m
- Lebar = 1.50 m
- Tebal = 0.12 m
- Jml Besi - X = 2.75 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 7.50 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 0.89 bt → 4.22 kg
Jml Besi - Y = 1.01 bt → 4.76 kg
Jumlah = 17.95 kg
- Volume
- Beton = 0.10 m3
- Besi = 17.95 kg
- Begisting = 0.96 m2

E. Pekerjaan Tangga Akses Garasi Sepeda


1. Plat Tangga & Bordes
- Panjang = 0.93 m
- Lebar = 0.70 m
- Tebal = 0.12 m
- Jml Besi - X = 4.63 bt 8 mm → 4.73 kg → 0.20 m
- Jml Besi - Y = 3.50 bt 8 mm → 4.73 kg → 0.20 m
- Besi
Jml Besi - X = 0.76 bt → 3.59 kg
Jml Besi - Y = 0.73 bt → 3.46 kg
Jumlah = 14.10 kg
- Volume
- Beton = 0.08 m3
- Besi = 14.10 kg
- Begisting = 0.87 m2

PLAT GARASI
Pekerjaan Plat Lantai Garasi
- Luas = 12.60 m2 63.00
- Tebal = 0.10 m
- Keliling = 15.00 m
- Wiremesh M = 2.10 x 5.40 m → 47.31 kg/lbr
- Wiremesh M 7 = 1.11 lbr → 52.57 kg
Volume
- Beton = 1.26 m3
- Besi = 52.57 kg
- Begisting = 1.50 m2

PLAT DRAINASE
Pekerjaan Plat Drainase
- Luas = 3.80 m2
- Tebal = 0.12 m
- Keliling = 13.00 m
- Wiremesh M = 2.10 x 5.40 m → 47.31 kg/lbr
- Wiremesh M 7 = 0.67 lbr → 31.71 kg
Volume
- Beton = 0.46 m3
- Besi = 31.71 kg
- Begisting = 5.36 m2

Meja Beton 0.10 x 0.90 m


- Panjang Balok = 4.00 m
1. Plat
- Jml Besi - X = 20.00 bh 6 mm → 2.66 kg → 0.20 m
- Jml Besi - Y = 5.00 bh 6 mm → 2.66 kg → 0.20 m
Volume
- Besi
- Utama Ø 6 = 1.75 bt → 4.66 kg
- Bagi Ø 6 = 2.16 bt → 5.76 kg
Jumlah = 10.42 kg
Volume
- Beton = 0.36 m3
- Besi = 10.42 kg
- Begisting = 4.20 m2

2. Balok 0.10 x 0.15 m


- Panjang Balok = 4.00 m
- Jarak Sengkang = 0.20 m
- Pembesian Besi
- Jml Besi Utama = 4.00 bh 6 mm → 2.66 kg
- Begel = 1.00 bh 6 mm → 2.66 kg
- Utama Ø 6 = 1.3 bt → 3.55 kg
- Begel Ø 6 = 0.04 bt → 0.11 kg
Jumlah = 3.66 kg
Volume
- Beton = 0.06 m3
- Besi = 3.66 kg
- Begisting = 1.60 m2

PLAT LANTAI
1. Pekerjaan Plat Lantai 2
- Luas = 34.00 m2
- Tebal = 0.12 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Bondek 0,75 = 1.00 x 6.00 m → 120,000.00 /m2
- Besi
- Wiremesh M 8 = 4.00 lbr → 247.16 kg
- Wiremesh M 8 = 4.00 lbr → 247.16 kg
Jumlah = 494.32 kg
Volume
- Beton = 4.08 m3
- Besi = 494.32 kg
- Bondek = 37.78 m2

2. Pekerjaan Plat Lantai 3


- Luas = 46.50 m2
- Tebal = 0.12 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Bondek 0,75 = 1.00 x 6.00 m → 120,000.00 /m2
- Besi
- Wiremesh M 8 = 5.00 lbr → 308.95 kg
- Wiremesh M 8 = 5.00 lbr → 308.95 kg
Jumlah = 617.90 kg
Volume
- Beton = 5.58 m3
- Besi = 617.90 kg
- Bondek = 51.67 m2

2. Pekerjaan Plat Lantai 4


- Luas = 46.10 m2
- Tebal = 0.12 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Bondek 0,75 = 1.00 x 6.00 m → 120,000.00 /m2
- Besi
- Wiremesh M 8 = 5.00 lbr → 308.95 kg
- Wiremesh M 8 = 5.00 lbr → 308.95 kg
Jumlah = 617.90 kg
Volume
- Beton = 5.53 m3
- Besi = 617.90 kg
- Bondek = 51.22 m2

2. Pekerjaan Plat Lantai 5


- Luas = 23.50 m2
- Tebal = 0.12 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Bondek 0,75 = 1.00 x 6.00 m → 120,000.00 /m2
- Besi
- Wiremesh M 8 = 3.00 lbr → 185.37 kg
- Wiremesh M 8 = 3.00 lbr → 185.37 kg
Jumlah = 370.74 kg
Volume
- Beton = 2.82 m3
- Besi = 370.74 kg
- Bondek = 26.11 m2
PLAT TALANG AIR
A. DAK TOREN
- Luas = 16.70 m2
- Tebal = 0.10 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Besi
- Wiremesh M 8 = 2.00 lbr → 123.58 kg
- Wiremesh M 8 = 2.00 lbr → 123.58 kg
Jumlah = 247.16 kg
Volume
- Beton = 1.67 m3
- Besi = 247.16 kg
- Begisting = 20.04 m2

B. Lantai 2
- Luas = 8.30 m2
- Tebal = 0.10 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Besi
- Wiremesh M 8 = 1.00 lbr → 61.79 kg
- Wiremesh M 8 = 1.00 lbr → 61.79 kg
Jumlah = 123.58 kg
Volume
- Beton = 0.83 m3
- Besi = 123.58 kg
- Begisting = 9.96 m2

C. Lantai 3
- Luas = 3.70 m2
- Tebal = 0.10 m
Penggunaan Besi
- Wiremesh M = 2.00 x 5.10 m → 61.79 kg/lbr 61.79 kg/lbr 11,005.02 /kg
- Besi
- Wiremesh M 8 = 1.00 lbr → 61.79 kg
- Wiremesh M 8 = 1.00 lbr → 61.79 kg
Jumlah = 123.58 kg
Volume
- Beton = 0.37 m3
- Besi = 123.58 kg
- Begisting = 4.44 m2

JANGGUTAN BETON
1. Lantai 1 0.08 x 0.45 m
- Panjang = 14.00 m

- Jml Besi - X = 70.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 3.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø 8 = 6.18 bt → 29.26 kg
- Bagi Ø 6 = 7.04 bt → 18.74 kg
Jumlah = 48.00 kg
Volume
- Beton = 0.50 m3
- Besi = 48.00 kg
- Begisting = 6.83 m2

Lantai 1 0.08 x 0.55 m


- Panjang = 1.00 m

- Jml Besi - X = 5.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 3.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø 8 = 0.53 bt → 2.48 kg
- Bagi Ø 6 = 0.54 bt → 1.44 kg
Jumlah = 3.92 kg
Volume
- Beton = 0.04 m3
- Besi = 3.92 kg
- Begisting = 1.18 m2

B. Lantai 2 0.08 x 0.50 m


- Panjang = 13.00 m

- Jml Besi - X = 65.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 3.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø 8 = 6.28 bt → 29.74 kg
- Bagi Ø 6 = 6.54 bt → 17.41 kg
Jumlah = 47.15 kg
Volume
- Beton = 0.52 m3
- Besi = 47.15 kg
- Begisting = 7.08 m2

TOPIAN BETON
1. Topian Beton Lt. 1 1.20 x 0.10 m
- Panjang = 3.00 m

- Jml Besi - X = 6.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 15.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø = 3.25 bt → 15.38 kg
- Bagi Ø = 3.10 bt → 8.25 kg
Jumlah = 23.63 kg
Volume
- Beton = 0.36 m3
- Besi = 23.63 kg
- Begisting = 7.02 m2
2. Topian Beton Lt. 2 0.80 x 0.10 m
- Panjang = 3.00 m

- Jml Besi - X = 4.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 15.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø = 2.25 bt → 10.65 kg
- Bagi Ø = 2.07 bt → 5.50 kg
Jumlah = 16.15 kg
Volume
- Beton = 0.24 m3
- Besi = 16.15 kg
- Begisting = 4.14 m2

3. Topian Beton Lt. 3 0.40 x 0.10 m


- Panjang = 10.00 m

- Jml Besi - X = 2.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 50.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø = 4.17 bt → 19.72 kg
- Bagi Ø = 3.37 bt → 8.96 kg
Jumlah = 28.68 kg
Volume
- Beton = 0.40 m3
- Besi = 28.68 kg
- Begisting = 5.40 m2

3. Topian Beton Lt. 4 0.40 x 0.10 m


- Panjang = 1.00 m

- Jml Besi - X = 2.00 bh 8 mm → 4.73 kg → 0.20 m


- Jml Besi - Y = 5.00 bh 6 mm → 2.66 kg → 0.20 m
- Besi
- Utama Ø = 0.42 bt → 1.97 kg
- Bagi Ø = 0.37 bt → 0.98 kg
Jumlah = 2.95 kg
Volume
- Beton = 0.04 m3
- Besi = 2.95 kg
- Begisting = 0.90 m2
Harga Modal Over Head
No Item Spek Matrial Sat
Harga Online Harga + Over Head Upah Jumlah 15%

1 Pekerjaan Struktur
- Beton Mutu K-100 m3 391,563.08 450,297.54 87,000.00 537,297.54
- Beton Mutu K-175 m3 556,563.08 640,047.54 87,000.00 727,047.54
- Beton Mutu K-225 m3 721,563.08 829,797.54 87,000.00 916,797.54
- Besi Per Kg Besi Polos kg 12,000.00 13,800.00 5,000.00 18,800.00
- Bondek 0,75 Bondek Tebal 0,75 mm m2 120,000.00 138,000.00 10,000.00 148,000.00
- Begisting Multriplek m2 55,000.00 63,250.00 40,000.00 103,250.00

2 Pekerjaan Instalasi Listrik


a. Instalasi Kabel Listrik
- Instalasi Saklar Kabel NYM 2 x 1,5 mm, T dos, Inbow dus, Pipa 1/2" ttk 94,017.24 108,119.83 40,000.00 148,119.83
- Instalasi Lampu Kabel NYM 2 x 1,5 mm, T dos, Pipa 1/2" ttk 82,362.07 94,716.38 40,000.00 134,716.38
- Instalasi Stop Kontak Kabel NYM 3 x 2,5 mm, T dos, Inbow dus, Pipa 1/2" ttk 133,534.48 153,564.66 40,000.00 193,564.66
- Instalasi Stop Kontak AC Kabel NYM 3 x 2,5 mm, T dos, Inbow dus, Pipa 1/2" ttk 133,534.48 153,564.66 40,000.00 193,564.66
- Instalasi Stop Kontak Mesin Pompa Kabel NYM 3 x 2,5 mm, T dos, Inbow dus, Pipa 1/2" ttk 133,534.48 153,564.66 40,000.00 193,564.66
- Instalasi KWH Meter Kabel NYY / TUFUR 4X6mm, T dos, Pipa 1/2" m' 240,000.00 276,000.00 40,000.00 316,000.00
- Instalasi Stop Kontak Water Booster Kabel NYM 3 x 2,5 mm, T dos, Inbow dus, Pipa 1/2" ttk 133,534.48 153,564.66 40,000.00 193,564.66

b. Armatur Listrik
1 Fiting Lampu
- Lampu Downlight Lampu Downlight LED Panel IB Bulat 12 Watt bh 85,000.00 97,750.00 29,750.00 127,500.00
- Lampu Outbow Lampu Downlight LED Panel OB Bulat 6W bh 85,000.00 97,750.00 29,750.00 127,500.00
- Viting Lampu Downlight Viting Philips Downlight 66664 Recessed Light 4 " Putih bh 65,000.00 74,750.00 22,750.00 97,500.00
- Viting Lampu Outbow Viting Lampu Downlight Outbow E27 4 Inch bh 65,000.00 74,750.00 22,750.00 97,500.00
- Lampu Strip Light Strip Light Drop Ceiling Plafon Putih 2835 Led m' 18,571.43 21,357.14 6,500.00 27,857.14
- Lampu Taman Spotlight BULAT 5x1 Watt OUTDOOR bh 60,000.00 69,000.00 21,000.00 90,000.00
- Lampu Pagar Lampu Pagar Lampu pilar IP65, 7 Watt bh 400,000.00 460,000.00 140,000.00 600,000.00
- Lampu Dinding Aklirik Hias Minimalis 29 x 11 Cm bh 350,000.00 402,500.00 122,500.00 525,000.00
- Lampu Gantung
- Lampu Sorot NYMANE - lampu sorot plafon dg 1 tempat putih bh 300,000.00 345,000.00 105,000.00 450,000.00
- Bohlam Lampu Philips 12 wat bh 30,000.00 34,500.00 10,500.00 45,000.00

2 Saklar
- Saklar Hotel Singgel
Boss/Saklar 1 Gang Dua Arah bh 30,000.00 34,500.00 12,000.00 46,500.00

- Saklar Singgel
New Gee Urea Broco 6621U / 1G bh 15,000.00 17,250.00 6,000.00 23,250.00
Broco Saklar Engkel Tunggal G161-59 - 56 bh 25,000.00 28,750.00 10,000.00 38,750.00
Boss/Saklar 1 Gang/Saklar Puro B1000 bh 25,000.00 28,750.00 10,000.00 38,750.00
Panasonic bh 40,000.00 46,000.00 16,000.00 62,000.00
Schneider Putih - E8231L1F_WE_G3 bh 56,000.00 64,400.00 22,400.00 86,800.00

- Saklar Dobel
New Gee Urea Broco 6622U / 2G bh 25,000.00 28,750.00 10,000.00 38,750.00
Boss/Saklar 2 Gang Boss / B1032/1/2A bh 33,000.00 37,950.00 13,200.00 51,150.00
Broco Saklar Seri 2G Galleo G162-54S 1 Way bh 40,000.00 46,000.00 16,000.00 62,000.00
Boss B1000 PURO 10A 250V 2 gang 1 way switch B1032/1/2A bh 45,000.00 51,750.00 18,000.00 69,750.00
Broco Saklar Seri 2G Galleo Biru G162-54S Blue Double 2 Gang 1 Way bh 45,000.00 51,750.00 18,000.00 69,750.00
- Saklar Tripel Schneider Saklar 3G Triple Vivace Kb33 1 We 3 Gang 1 Way Putih bh 50,000.00 57,500.00 SCHNEIDER
20,000.00
SAKLAR77,500.00
3G TRIPLE VIVACE KB33 1 WE 3 GANG 1 WAY PUTIH
Broco Saklar Switch Triple 3 Gang 1 Way IB 6613 bh 30,000.00 34,500.00 https://www.tokopedia.com/britplaza/broco-saklar-switch-triple-3-gang-1-way-ib-6613
12,000.00 46,500.00

3 Stop Kontak
- Stop Kontak indor Schneider Electric PIENO 60,869.57 70,000.00 15,000.00
- Stop Kontak Outdor (Pompa & Area Cuci) Schneider Electric Kavacha Penutup Stop Kontak Putih - E223R_WE 78,260.87 90,000.00 15,000.00
- Stop Kontak AC SCHNEIDER NEO STOP KONTAK AC 13A E3015D_EBGS 195,652.17 225,000.00 15,000.00

4 Soket Kabel Data, Kabel TV, & Kabel CCTV


- Soket Data
- Soket TV
- Soket CCTV

5 Panel KWH
- Bok MCB Schneider Electric Domae MCB Box 8 Modul - DOMH12108F bh 300,000.00 345,000.00 120,000.00 465,000.00
- ELCB Schneider A9R71225 bh 350,000.00 402,500.00 140,000.00 542,500.00
- MCB 6 Ampe Untuk Lampu ( 1 MCB Untuk 20 ttk Lampu Schneider bh 35,000.00 40,250.00 14,000.00 54,250.00
- Mcb 10 Amper Untuk Skop Kontak Schneider bh 45,000.00 51,750.00 18,000.00 69,750.00
- Mcb 10 Amper Untuk AC ( 1 Unit 1 MCB) Schneider bh 50,000.00 57,500.00 20,000.00 77,500.00

6 exhaust Fan
- exhaustfan Plafond (By Maspion) bh 185,000.00 350,000.00 150,000.00 500,000.00 https://www.tokopedia.com/beofficialstore/maspion-ceiling-exhaust-fan-plafon-mv-16-ex-6
- exhaustfan Dinding (By Maspion) bh 274,900.00 400,000.00 150,000.00 550,000.00 https://www.tokopedia.com/mel-8/maspion-exhaust-fan-hexos-dinding-mv-200-nex-8-inch

3 Pekerjaan Besi
Rangka Hollow Hollow 4 x 6 x 0,15 cm, Kerangka 50 x 100 cm & Fin. Cat Zincromate + Cat Hitam m2 263,900.00 303,485.00 136,100.00 439,585.00
Roof Drain Stenlis 3" m2 60,000.00 69,000.00 20,000.00 89,000.00
Sika Top Sika Top 107 Seal, 1 : 4,5 (2 Lapis) m2 28,800.00 33,120.00 15,000.00 48,120.00

4 Penutup Atap
Solar Flat Solar Flat Solid 1,2 mm Clear m2 200,000.00 230,000.00 50,000.00 280,000.00
Alderon Alderon 10 mm m2 400,000.00 460,000.00 50,000.00 510,000.00
Kaca Tempered Kaca Tempered Tebal 10 mm m2 1,600,000.00 1,840,000.00 50,000.00 1,890,000.00

5 Finishing Dinding
- Jenis Bata Tempel
- Bata Tempel Bevel – Natural Halus Bata Tempel Bevel – Natural Halus m2 130,000.00 149,500.00 50,000.00 199,500.00
- Bata Tempel Serabut Kelapa Bata Tempel Serabut Kelapa m2 115,000.00 132,250.00 50,000.00 182,250.00
- Bata Tempel Ekspos – Natural Halus Bata Tempel Ekspos – Natural Halus m2 135,000.00 155,250.00 50,000.00 205,250.00
- Bata Tempel Vintage Belanda Bata Tempel Vintage Belanda m2 125,000.00 143,750.00 50,000.00 193,750.00
- Bata Tempel natural Halus Tirakota Bata Tempel natural Halus Tirakota m2 125,000.00 143,750.00 50,000.00 193,750.00
- Bata Tempel Putih Natural Halus Bata Tempel Putih Natural Halus m2 140,000.00 161,000.00 50,000.00 211,000.00
- Bata Tempel Ekspos Natural Halus Tirakota Bata Tempel Ekspos Natural Halus Tirakota m2 130,000.00 149,500.00 50,000.00 199,500.00

6 Pekerjaan Plumbing
1. Rucika Untuk Instalasi Air Tekanan 10 Kg
- 1/2" - (22 mm) Rucika Tipe AW m' 10,824.75 12,448.46 10,000.00 22,448.46
- 3/4" - (26 mm) Rucika Tipe AW m' 14,688.00 16,891.20 10,000.00 26,891.20
- 1" - (32 mm) Rucika Tipe AW m' 20,081.25 23,093.44 10,000.00 33,093.44
- 1-1/4" - (42 mm) Rucika Tipe AW m' 30,026.25 34,530.19 10,000.00 44,530.19
- 1-1/2" - (48 mm) Rucika Tipe AW m' 34,463.25 39,632.74 10,000.00 49,632.74
- 2" - (60 mm) Rucika Tipe AW m' 44,102.25 50,717.59 10,000.00 60,717.59
- 2-1/2" - (76 mm) Rucika Tipe AW m' 64,298.25 73,942.99 10,000.00 83,942.99
- 3" - (89 mm) Rucika Tipe AW m' 90,576.00 104,162.40 15,000.00 119,162.40
- 4" - (114 mm) Rucika Tipe AW m' 150,054.75 172,562.96 20,000.00 192,562.96
- 5" - (140 mm) Rucika Tipe AW m' 237,685.50 273,338.33 25,000.00 298,338.33
- 6" - (165 mm) Rucika Tipe AW m' 333,387.00 383,395.05 30,000.00 413,395.05
- 8" - (216 mm) Rucika Tipe AW m' 559,406.25 643,317.19 35,000.00 678,317.19
- 10" - (267 mm) Rucika Tipe AW m' 864,947.25 994,689.34 45,000.00 1,039,689.34
- 12" - (318 mm) Rucika Tipe AW m' 1,219,601.25 1,402,541.44 60,000.00 1,462,541.44
2. Rucika Untuk Instalasi Air Tekanan 5 Kg
- 1-1/4" - (42 mm) Rucika Tipe D m' 18,857.25 21,685.84 10,000.00 31,685.84
- 1-1/2" - (48 mm) Rucika Tipe D m' 21,305.25 24,501.04 10,000.00 34,501.04
- 2" - (60 mm) Rucika Tipe D m' 27,310.50 31,407.08 10,000.00 41,407.08
- 2-1/2" - (76 mm) Rucika Tipe D m' 36,911.25 42,447.94 10,000.00 52,447.94
- 3" - (89 mm) Rucika Tipe D m' 48,998.25 56,347.99 15,000.00 71,347.99
- 4" - (114 mm) Rucika Tipe D m' 77,073.75 88,634.81 20,000.00 108,634.81
- 5" - (140 mm) Rucika Tipe D m' 118,651.50 136,449.23 25,000.00 161,449.23
- 6" - (165 mm) Rucika Tipe D m' 156,519.00 179,996.85 30,000.00 209,996.85
- 8" - (216 mm) Rucika Tipe D m' 275,247.00 316,534.05 35,000.00 351,534.05
- 10" - (267 mm) Rucika Tipe D m' 453,339.00 521,339.85 45,000.00 566,339.85
- 12" - (318 mm) Rucika Tipe D m' 636,327.00 731,776.05 60,000.00 791,776.05

7 Armatur Plumbing
1. Closet Duduk American Standar
- LA Vita LA01HA10K (By American Standar) LA Vita LA01HA10K (By American Standar) bh 8,920,000.00 10,258,000.00 300,000.00 10,558,000.00
- Acacia One Piece (By American Standar) Acacia One Piece (By American Standar) bh 7,290,000.00 8,383,500.00 300,000.00 8,683,500.00
- IMAGINE HA01YNC10 (By American Standar) IMAGINE HA01YNC10 (By American Standar) bh 6,980,000.00 8,027,000.00 300,000.00 8,327,000.00
- MOMENTS HAM9YNC10 (By American Standar) MOMENTS HAM9YNC10 (By American Standar) bh 6,400,000.00 7,360,000.00 300,000.00 7,660,000.00
- Acacia HAA4YQC10 (By American Standar) Acacia HAA4YQC10 (By American Standar) bh 6,210,000.00 7,141,500.00 300,000.00 7,441,500.00
- Acacia CAA4YPC10 (By American Standar) Acacia CAA4YPC10 (By American Standar) bh 6,220,000.00 7,153,000.00 300,000.00 7,453,000.00
- Neo Modern (By American Standar) Neo Modern (By American Standar) bh 3,800,000.00 4,370,000.00 300,000.00 4,670,000.00
- New Codio II One Piece (By American Standar) New Codio II One Piece (By American Standar) bh 3,780,000.00 4,347,000.00 300,000.00 4,647,000.00
- Winplus (By American Standar) Winplus (By American Standar) bh 2,590,000.00 2,978,500.00 300,000.00 3,278,500.00
- Rough in 40/45/47 (By American Standar) Rough in 40/45/47 (By American Standar) bh 2,450,000.00 2,817,500.00 300,000.00 3,117,500.00
- Newton Smart washer (By American Standar) Newton Smart washer (By American Standar) bh 2,119,000.00 2,436,850.00 300,000.00 2,736,850.00
- Granada Basic Dual Flush CCST (By American Standar) Granada Basic Dual Flush CCST (By American Standar) bh 2,009,000.00 2,310,350.00 300,000.00 2,610,350.00
- GR13CAxxK (By American Standar) GR13CAxxK (By American Standar) bh 1,750,000.00 2,012,500.00 300,000.00 2,312,500.00

2. Closet Duduk Toto


- CW825J (By Toto) CW825J (By Toto) bh 9,300,000.00 10,695,000.00 300,000.00 10,995,000.00
- CW822JT1/TV150NRNV2 (By Toto) CW822JT1/TV150NRNV2 (By Toto) bh 8,419,000.00 9,681,850.00 300,000.00 9,981,850.00
- CW708NHJ/TV150NRNV2 (By Toto) CW708NHJ/TV150NRNV2 (By Toto) bh 8,210,000.00 9,441,500.00 300,000.00 9,741,500.00
- CW824PJT1/TV150NRNV2 (By Toto) CW824PJT1/TV150NRNV2 (By Toto) bh 8,055,000.00 9,263,250.00 300,000.00 9,563,250.00
- CW875NJT1/TV150NRNV2 (By Toto) CW875NJT1/TV150NRNV2 (By Toto) bh 8,017,000.00 9,219,550.00 300,000.00 9,519,550.00
- CW620JT2/TV150NRNV1 (By Toto) CW620JT2/TV150NRNV1 (By Toto) bh 7,525,000.00 8,653,750.00 300,000.00 8,953,750.00
- C436 (By Toto) C436 (By Toto) bh 7,218,000.00 8,300,700.00 300,000.00 8,600,700.00
- CW812J (By Toto) CW812J (By Toto) bh 7,105,000.00 8,170,750.00 300,000.00 8,470,750.00
- CW813PJ (By Toto) CW813PJ (By Toto) bh 6,490,000.00 7,463,500.00 300,000.00 7,763,500.00
- CW823J (By Toto) CW823J (By Toto) bh 6,220,000.00 7,153,000.00 300,000.00 7,453,000.00
- CW822NJ (By Toto) CW822NJ (By Toto) bh 6,190,000.00 7,118,500.00 300,000.00 7,418,500.00
- CW794B (By Toto) CW794B (By Toto) bh 6,200,000.00 7,130,000.00 300,000.00 7,430,000.00
- SW794BT2 (By Toto) SW794BT2 (By Toto) bh 6,240,000.00 7,176,000.00 300,000.00 7,476,000.00
- CW914J (By Toto) CW914J (By Toto) bh 5,850,000.00 6,727,500.00 300,000.00 7,027,500.00
- CW823J (By Toto) CW823J (By Toto) bh 5,750,000.00 6,612,500.00 300,000.00 6,912,500.00
- CES9683AJ (By Toto) CES9683AJ (By Toto) bh 5,330,000.00 6,129,500.00 300,000.00 6,429,500.00
- CW811PJ (By Toto) CW811PJ (By Toto) bh 5,529,000.00 6,358,350.00 300,000.00 6,658,350.00
- SW811JP (By Toto) SW811JP (By Toto) bh 5,539,000.00 6,369,850.00 300,000.00 6,669,850.00
- CW875NJ (By Toto) CW875NJ (By Toto) bh 5,441,000.00 6,257,150.00 300,000.00 6,557,150.00
- CW826J (By Toto) CW826J (By Toto) bh 5,300,000.00 6,095,000.00 300,000.00 6,395,000.00
- SW826JP (By Toto) SW826JP (By Toto) bh 5,350,000.00 6,152,500.00 300,000.00 6,452,500.00
- CW824PJ (By Toto) CW824PJ (By Toto) bh 5,480,000.00 6,302,000.00 300,000.00 6,602,000.00
- CW620J (By Toto) CW620J (By Toto) bh 4,960,000.00 5,704,000.00 300,000.00 6,004,000.00
- CW894J (By Toto) CW894J (By Toto) bh 4,930,000.00 5,669,500.00 300,000.00 5,969,500.00
- CW821J/SW821JP (By Toto) CW821J/SW821JP (By Toto) bh 4,460,000.00 5,129,000.00 300,000.00 5,429,000.00
- CW868NJ (By Toto) CW868NJ (By Toto) bh 4,225,000.00 4,858,750.00 300,000.00 5,158,750.00
- CW867NJ (By Toto) CW867NJ (By Toto) bh 4,070,000.00 4,680,500.00 300,000.00 4,980,500.00
- CW630PJ (By Toto) CW630PJ (By Toto) bh 3,712,000.00 4,268,800.00 300,000.00 4,568,800.00
- CW862NJ/SW862JP (By Toto) CW862NJ/SW862JP (By Toto) bh 3,621,000.00 4,164,150.00 300,000.00 4,464,150.00
- CW860NJ / SW861JP (By Toto) CW860NJ / SW861JP (By Toto) bh 3,620,000.00 4,163,000.00 300,000.00 4,463,000.00
- CW631PJ/SW631JP (By Toto) CW631PJ/SW631JP (By Toto) bh 3,211,000.00 3,692,650.00 300,000.00 3,992,650.00
- CW668PJ/SW668J (By Toto) CW668PJ/SW668J (By Toto) bh 3,126,000.00 3,594,900.00 300,000.00 3,894,900.00
- C704L/SW784JP (By Toto) C704L/SW784JP (By Toto) bh 3,061,000.00 3,520,150.00 300,000.00 3,820,150.00
- CW813PJ (By Toto) CW813PJ (By Toto) bh 6,490,000.00 7,463,500.00 300,000.00 7,763,500.00
- CW823J (By Toto) CW823J (By Toto) bh 6,220,000.00 7,153,000.00 300,000.00 7,453,000.00
- CW822NJ (By Toto) CW822NJ (By Toto) bh 6,190,000.00 7,118,500.00 300,000.00 7,418,500.00
- CW794B / SW794BT2 (By Toto) CW794B / SW794BT2 (By Toto) bh 6,200,000.00 7,130,000.00 300,000.00 7,430,000.00
- CW914J (By Toto) CW914J (By Toto) bh 5,850,000.00 6,727,500.00 300,000.00 7,027,500.00
- CE9/TV150NWV12J (By Toto) CE9/TV150NWV12J (By Toto) bh 2,619,000.00 3,011,850.00 300,000.00 3,311,850.00
- CW702J/SW784JP (By Toto) CW702J/SW784JP (By Toto) bh 2,522,000.00 2,900,300.00 300,000.00 3,200,300.00
- CE9/TV150NWV12J (By Toto) CE9/TV150NWV12J (By Toto) bh 2,680,000.00 3,082,000.00 300,000.00 3,382,000.00
- CW661PJT1/SW784JP (By Toto) CW661PJT1/SW784JP (By Toto) bh 2,880,000.00 3,312,000.00 300,000.00 3,612,000.00
- Monoblock Closet tipe 421 (By Toto) Monoblock Closet tipe 421 (By Toto) bh 2,058,000.00 2,366,700.00 300,000.00 2,666,700.00
- CW421J/SW420JP (By Toto) CW421J/SW420JP (By Toto) bh 2,158,000.00 2,481,700.00 300,000.00 2,781,700.00
- CW660PJ/SW660J (By Toto) CW660PJ/SW660J (By Toto) bh 2,168,000.00 2,493,200.00 300,000.00 2,793,200.00
- CW702J/SW784JP (By Toto) CW702J/SW784JP (By Toto) bh 2,550,000.00 2,932,500.00 300,000.00 3,232,500.00
- CW660PJ/SW660J (By Toto) CW660PJ/SW660J (By Toto) bh 2,168,000.00 2,493,200.00 300,000.00 2,793,200.00
- CW421J/SW420JP (By Toto) CW421J/SW420JP (By Toto) bh 2,158,000.00 2,481,700.00 300,000.00 2,781,700.00
- Coupled Toilet CW660NPJ/SW660J (By Toto) Coupled Toilet CW660NPJ/SW660J (By Toto) bh 1,960,000.00 2,254,000.00 300,000.00 2,554,000.00
3. Closet Duduk
- Closet duduk siram ToHo Closet duduk siram ToHo bh 420,000.00 483,000.00 300,000.00 783,000.00
- Closet Duduk Duty C07 Pink Closet Duduk Duty C07 Pink bh 572,000.00 657,800.00 300,000.00 957,800.00
- Closet duduk merk TRILIUN Closet duduk merk TRILIUN bh 600,000.00 690,000.00 300,000.00 990,000.00
- Closet duduk siram DUTY BIRU Closet duduk siram DUTY BIRU bh 600,000.00 690,000.00 300,000.00 990,000.00
- Closet duduk Icepol Closet duduk Icepol bh 600,000.00 690,000.00 300,000.00 990,000.00
- Closet duduk renovo Closet duduk renovo bh 700,000.00 805,000.00 300,000.00 1,105,000.00
- Kloset Sericite 1037 Duduk Siram / Closet Tanpa Tangki Kloset Sericite 1037 Duduk Siram / Closet Tanpa Tangki bh 720,000.00 828,000.00 300,000.00 1,128,000.00
- Closet duduk onyx putih Closet duduk onyx putih bh 750,000.00 862,500.00 300,000.00 1,162,500.00
- CLOSET DUDUK SIRAM INA CLOSET DUDUK SIRAM INA bh 775,000.00 891,250.00 300,000.00 1,191,250.00
- TIDY 017S CLOSET DUDUK (TWO PIECE TOILET) TIDY 017S CLOSET DUDUK (TWO PIECE TOILET) bh 799,200.00 919,080.00 300,000.00 1,219,080.00
- Closet Duduk Oulu c 433 Closet Duduk Oulu c 433 bh 810,000.00 931,500.00 300,000.00 1,231,500.00
- KOMPLIT SET CLOSET DUDUK PARMA T900 KOMPLIT SET CLOSET DUDUK PARMA T900 bh 815,000.00 937,250.00 300,000.00 1,237,250.00
- Closet Duduk Oulu A626 Closet Duduk Oulu A626 bh 915,000.00 1,052,250.00 300,000.00 1,352,250.00
- Closet Duduk Oulu C633 Closet Duduk Oulu C633 bh 935,000.00 1,075,250.00 300,000.00 1,375,250.00
- Closet Duduk VOK putih Closet Duduk VOK putih bh 950,000.00 1,092,500.00 300,000.00 1,392,500.00
- CLOSET DUDUK VOLT + tabung 008S white CLOSET DUDUK VOLT + tabung 008S white bh 950,000.00 1,092,500.00 300,000.00 1,392,500.00
- Enchanting E1333 closet toilet duduk free jet shower Enchanting E1333 closet toilet duduk free jet shower bh 918,000.00 1,055,700.00 300,000.00 1,355,700.00
- RENOVO KH 858 WHITE TWO PIECE CLOSET RENOVO KH 858 WHITE TWO PIECE CLOSET bh 900,200.00 1,035,230.00 300,000.00 1,335,230.00
- Kris Kloset Duduk Duoblock Washdown Ac2108 – Putih Kris Kloset Duduk Duoblock Washdown Ac2108 – Putih bh 900,200.00 1,035,230.00 300,000.00 1,335,230.00
- Closet duduk geta 8003 White Closet duduk geta 8003 White bh 900,000.00 1,035,000.00 300,000.00 1,335,000.00
- TIDY 008-S CLOSET DUDUK TIDY 008-S CLOSET DUDUK bh 900,100.00 1,035,115.00 300,000.00 1,335,115.00
- Closet Duduk Meridian Closet Duduk Meridian bh 935,000.00 1,075,250.00 300,000.00 1,375,250.00
- CLOSET DUDUK ENCHANTING-1309 CLOSET DUDUK ENCHANTING-1309 bh 950,000.00 1,092,500.00 300,000.00 1,392,500.00
- Closet Duduk NA 001 Merek Orchard/Alice Closet Duduk NA 001 Merek Orchard/Alice bh 950,000.00 1,092,500.00 300,000.00 1,392,500.00
- Closet Duduk Alice JA 0031 / WASHDOWN - Close Coupl Closet Duduk Alice JA 0031 / WASHDOWN - Close Coupled Series bh 979,000.00 1,125,850.00 300,000.00 1,425,850.00
- RENOVO KH-328 CLOSET TOILET MONOBLOK closet RENOVO KH-328 CLOSET TOILET MONOBLOK closet duduk bh 1,105,200.00 1,270,980.00 300,000.00 1,570,980.00
- Closet Duduk Merk Eco Grave Closet Duduk Merk Eco Grave bh 1,100,000.00 1,265,000.00 300,000.00 1,565,000.00
- Closet duduk Valpra made in china Closet duduk Valpra made in china bh 1,150,000.00 1,322,500.00 300,000.00 1,622,500.00
- CLOSET DUDUK ENCHANTING E1301 CLOSET DUDUK ENCHANTING E1301 bh 1,200,000.00 1,380,000.00 300,000.00 1,680,000.00
- Closet duduk Lexus Closet duduk Lexus bh 1,200,000.00 1,380,000.00 300,000.00 1,680,000.00
- Closet duduk Huida Closet duduk Huida bh 1,200,000.00 1,380,000.00 300,000.00 1,680,000.00
- Closet duduk Kris Closet duduk Kris bh 1,205,000.00 1,385,750.00 300,000.00 1,685,750.00
- HCG CS777DF CEZANNE WHITE CLOSE COUPLED T HCG CS777DF CEZANNE WHITE CLOSE COUPLED TOILET (CLOSET DUDUK) bh 1,209,200.00 1,390,580.00 300,000.00 1,690,580.00
- CERAMAX RIVERA TWO PIECE CLOSET (Kloset Dudu CERAMAX RIVERA TWO PIECE CLOSET (Kloset Duduk) bh 1,200,200.00 1,380,230.00 300,000.00 1,680,230.00
- CERAMAX CLANAIRE TWO PIECE CLOSET (Kloset Du CERAMAX CLANAIRE TWO PIECE CLOSET (Kloset Duduk) bh 1,200,200.00 1,380,230.00 300,000.00 1,680,230.00
- Kris Kloset Duduk Duoblock Washdown A5004 – Putih Kris Kloset Duduk Duoblock Washdown A5004 – Putih bh 1,300,000.00 1,495,000.00 300,000.00 1,795,000.00
- CLOSET DUDUK EVERTON HALMAR CLOSET DUDUK EVERTON HALMAR bh 1,500,000.00 1,725,000.00 300,000.00 2,025,000.00
- Kris Kloset Duduk Monoblock Washdown A8650 – Putih Kris Kloset Duduk Monoblock Washdown A8650 – Putih bh 1,600,000.00 1,840,000.00 300,000.00 2,140,000.00
- Aer Kloset Duduk Twm 01 Aer Kloset Duduk Twm 01 bh 1,700,000.00 1,955,000.00 300,000.00 2,255,000.00
- AMSTAD NEWTON 2 PIECE TOILET SET (CLOSET D AMSTAD NEWTON 2 PIECE TOILET SET (CLOSET DUDUK) bh 1,777,400.00 2,044,010.00 300,000.00 2,344,010.00
- CERAMAX AIRES MONOBLOK CLOSET (Kloset Duduk CERAMAX AIRES MONOBLOK CLOSET (Kloset Duduk) bh 1,789,000.00 2,057,350.00 300,000.00 2,357,350.00
- Closet Duduk Toto Rusunami White CW420J/SW420JP+T Closet Duduk Toto Rusunami White CW420J/SW420JP+TC505 (SET) bh 1,794,990.00 2,064,238.50 300,000.00 2,364,238.50
- Rialto Closet warna duduk type 5008 - Orange (closet duob Rialto Closet warna duduk type 5008 - Orange (closet duoblock) bh 1,750,000.00 2,012,500.00 300,000.00 2,312,500.00
- MONOBLOK / CLOSET DUDUK ROCA VICTORIA 305 MONOBLOK / CLOSET DUDUK ROCA VICTORIA 305 bh 1,800,000.00 2,070,000.00 300,000.00 2,370,000.00
- CERAMAX ALMEYDA TWO PIECE CLOSET (Kloset Du CERAMAX ALMEYDA TWO PIECE CLOSET (Kloset Duduk) bh 1,900,000.00 2,185,000.00 300,000.00 2,485,000.00
- KRIS CLOSET DUDUK WASHDOWN MDL MONOBLO KRIS CLOSET DUDUK WASHDOWN MDL MONOBLOK bh 2,000,000.00 2,300,000.00 300,000.00 2,600,000.00

4. Jet Spray
- Toto THX20NB Shower Spray White Toto THX20NB Shower Spray White unit 200,000.00 230,000.00 34,500.00 264,500.00
- Tidy FL010 Toilet Jet Shower Tidy FL010 Toilet Jet Shower unit 110,000.00 126,500.00 18,975.00 145,475.00
- Wasser WS-88TS Jet Shower Wasser WS-88TS Jet Shower unit 95,000.00 109,250.00 16,387.50 125,637.50
- Onda S75WCS White Jet Shower Onda S75WCS White Jet Shower unit 120,000.00 138,000.00 20,700.00 158,700.00
- Toto THX20NB N5 Black Toto THX20NB N5 Black unit 200,000.00 230,000.00 34,500.00 264,500.00

5. Stop Kran Jet Shower


- Onda JF 08 ST Stop Kran T Cabang Onda JF 08 ST Stop Kran T Cabang bh 90,000.00 103,500.00 15,525.00 119,025.00
- ONE 2707-17 Stop Kran Jet Shower Cabang T ONE 2707-17 Stop Kran Jet Shower Cabang T bh 100,000.00 115,000.00 17,250.00 132,250.00
- WMF GZ009 Stop Keran Cabang WMF GZ009 Stop Keran Cabang bh 35,000.00 40,250.00 6,037.50 46,287.50
- Sello Stop Kran Jet Shower SL9711 Cabang Sello Stop Kran Jet Shower SL9711 Cabang bh 50,000.00 57,500.00 8,625.00 66,125.00

6. Shower Mandi
- Head Shower
- Shower Tiang Lever Column Set GERMANY BRILLIANT G Shower Tiang Lever Column Set GERMANY BRILLIANT GBV 1388 B (Full Set) bh 2,600,000.00 2,990,000.00 149,500.00 3,139,500.00
- Sello Set Shower Tiang - Mixer SL9811 (Full Set) Sello Set Shower Tiang - Mixer SL9811 (Full Set) bh 1,600,000.00 1,840,000.00 276,000.00 2,116,000.00
- Sello Set Shower Tiang - Mixer SL9817 (Full Set) Sello Set Shower Tiang - Mixer SL9817 (Full Set) bh 2,200,000.00 2,530,000.00 379,500.00 2,909,500.00
- ONDA SO250 + kran cabang onda k406 + tiang shower ONDA SO250 + kran cabang onda k406 + tiang shower bh 650,000.00 747,500.00 112,125.00 859,625.00
7. Shower Mandi
- Hend Shower
- Hand Shower Wasser SHS 533 (Exclude Kran) Hand Shower Wasser SHS 533 (Exclude Kran) bh 260,000.00 299,000.00 44,850.00 343,850.00
- Wasser SHS-567 Hand Shower (Exclude Kran) Wasser SHS-567 Hand Shower (Exclude Kran) bh 350,000.00 402,500.00 60,375.00 462,875.00

8. Kran Shower Mandi


- Kran Hend Shower
- Kran Double Faucet D 5K SS Kran Double Faucet D 5K SS bh 200,000.00 230,000.00 34,500.00 264,500.00
- Kran Double Faucet D 9G Z Kran Double Faucet D 9G Z bh 180,000.00 207,000.00 31,050.00 238,050.00
- Kran Cabang SShower Body FILTON-8803R Kran Cabang SShower Body FILTON-8803R bh 300,000.00 345,000.00 51,750.00 396,750.00
- Kran Cabang X2 Kran Cabang X2 bh 150,000.00 172,500.00 25,875.00 198,375.00
- AIR Kran Shower Cabang TA 5P BL AIR Kran Shower Cabang TA 5P BL bh 200,000.00 230,000.00 34,500.00 264,500.00

9. Kran Dinding
- Keran Tembok Onda CLS 03 CLS03 1/2" Keran Tembok Onda CLS 03 CLS03 1/2" bh 80,000.00 92,000.00 13,800.00 105,800.00
- Onda Keran Tembok/Taman CLS 01 [1/2 Inch] Onda Keran Tembok/Taman CLS 01 [1/2 Inch] bh 75,000.00 86,250.00 12,937.50 99,187.50
- Kran Air Besi 1/2" Kran Air Besi 1/2" bh 25,000.00 28,750.00 4,312.50 33,062.50
- kran Dinding VONE 2416-55 kran Dinding VONE 2416-55 bh 170,000.00 195,500.00 29,325.00 224,825.00
- Kran Dinding Cabang RINOKS SD-202 Kran Dinding Cabang RINOKS SD-202 bh 120,000.00 138,000.00 20,700.00 158,700.00
- Onda KUBC Kran Tembok [1/2 Inch] Onda KUBC Kran Tembok [1/2 Inch] bh 35,000.00 40,250.00 6,037.50 46,287.50
- Onda Kran Tembok BC [1/2 Inch] Onda Kran Tembok BC [1/2 Inch] bh 30,000.00 34,500.00 5,175.00 39,675.00
- Onda BM Kran Tembok [1/2 Inch] Onda BM Kran Tembok [1/2 Inch] bh 25,000.00 28,750.00 4,312.50 33,062.50
- Kran Tembok BLS ONDA 1-2″ Kran Tembok BLS ONDA 1-2″ bh 65,000.00 74,750.00 11,212.50 85,962.50
- Kran Tembok Onda CLS 02 Kran Tembok Onda CLS 02 bh 75,000.00 86,250.00 12,937.50 99,187.50
- Onda Kran Dinding Cabang K 406 CTG Onda Kran Dinding Cabang K 406 CTG bh 140,000.00 161,000.00 24,150.00 185,150.00

10 Floor Drain
- Smart Drain SS 304 Smart Drain SS 304 bh 140,000.00 161,000.00 24,150.00 185,150.00
- Floor Drain FS 02 SS Floor Drain FS 02 SS bh 30,000.00 34,500.00 5,175.00 39,675.00
- Germany Brilliant Floor drain GB01-SM Germany Brilliant Floor drain GB01-SM bh 250,000.00 287,500.00 43,125.00 330,625.00
- PAPS 6355-1 Floor Drain PAPS 6355-1 Floor Drain bh 65,000.00 74,750.00 11,212.50 85,962.50
- TOTO TX1EBV1 Floor Drain TOTO TX1EBV1 Floor Drain bh 350,000.00 402,500.00 60,375.00 462,875.00
- Floor drain mesin cuci full Floor drain mesin cuci full bh 700,000.00 805,000.00 120,750.00 925,750.00
- Wasser HSA-6042 4" Wasser HSA-6042 4" bh 270,000.00 310,500.00 46,575.00 357,075.00

11 Harga Multriplek (122 x 244 cm)


- Teakwood TM 3 x 7 Teakwood TM 3 x 7 bh 62,000.00 71,300.00 71,300.00
- Teakwood TM 4 x 8 Teakwood TM 4 x 8 bh 75,000.00 86,250.00 86,250.00
- Teakwood Silver 4 x 8 Teakwood Silver 4 x 8 bh 92,000.00 105,800.00 105,800.00

- MDF 9 mm MDF 9 mm bh 100,000.00 115,000.00 115,000.00


- MDF 15 mm MDF 15 mm bh 155,000.00 178,250.00 178,250.00
- MDF 18 mm MDF 18 mm bh 180,000.00 207,000.00 207,000.00

- Triplek Meranti 3mm Triplek Meranti 3mm bh 43,000.00 49,450.00 49,450.00


- Triplek Meranti 4mm Triplek Meranti 4mm bh 53,000.00 60,950.00 60,950.00
- Triplek Meranti 8mm Triplek Meranti 8mm bh 86,000.00 98,900.00 98,900.00
- Triplek Meranti 9mm Triplek Meranti 9mm bh 93,500.00 107,525.00 107,525.00
- Triplek Meranti 12mm Triplek Meranti 12mm bh 150,000.00 172,500.00 172,500.00
- Triplek Meranti 15mm Triplek Meranti 15mm bh 180,000.00 207,000.00 207,000.00
- Triplek Meranti 18mm Triplek Meranti 18mm bh 225,000.00 258,750.00 258,750.00

12 Penutup Lantai
a Kusen Alumunium Pintu
- Open Back Polos 4 inch (Untuk Kusen Pintu), P = 600 cm Open Back Polos 4 inch (Untuk Kusen Pintu), P = 600 cm bt 517,000.00 594,550.00 594,550.00 86,166.67
- Urat Kayu Alexindo 4 inch (Untuk Kusen Pintu) P = 600 c Urat Kayu Alexindo 4 inch (Untuk Kusen Pintu) P = 600 cm bt 610,000.00 701,500.00 701,500.00 101,666.67
- Inkalum Polos 4 inch (Untuk Kusen Pintu) P = 600 cm Inkalum Polos 4 inch (Untuk Kusen Pintu) P = 600 cm bt 350,000.00 402,500.00 402,500.00 58,333.33

b Tutup Kusen Pintu


- Tutup Polos 4 inch By Alexindo Tutup Polos 4 inch By Alexindo bt 220,000.00 253,000.00 253,000.00
- Tutup Polos 4 inch By Inkalum Tutup Polos 4 inch By Inkalum bt 130,000.00 149,500.00 149,500.00
- Tutup M 4 inch By Alexindo Tutup M 4 inch By Alexindo bt 295,000.00 339,250.00 339,250.00
- Tutup M 4 inch By Inkalum Tutup M 4 inch By Inkalum bt 105,000.00 120,750.00 120,750.00

c Kusen Alumunium Jendela


- Kusen M Polos 4 Inch By Alexindo Kusen M Polos 4 Inch By Alexindo bt 516,000.00 593,400.00 593,400.00
- Kusen M Polos 4 Inch, By Inkalum Kusen M Polos 4 Inch, By Inkalum bt 355,000.00 408,250.00 408,250.00

d Tutup Kusen Jendela Kaca Mati


- Tutup M 4 inch By Alexindo Tutup M 4 inch By Alexindo bt 295,000.00 339,250.00 339,250.00
- Tutup M 4 inch By Inkalum Tutup M 4 inch By Inkalum bt 105,000.00 120,750.00 120,750.00

e Frem Daun Jendela


- 1825 PC Alex58 By Alexindo (Polos) 1825 PC Alex58 By Alexindo (Polos) bt 326,000.00 374,900.00 374,900.00
- 1825 PC Inkalum By Inkalum (Polos) 1825 PC Inkalum By Inkalum (Polos) bt 232,000.00 266,800.00 266,800.00
f Stoper Daun Jendela
- 8130 PC Inkalum 8130 PC Inkalum bt 113,000.00 129,950.00 129,950.00
- 8130 Alexindo 8130 Alexindo bt 160,000.00 184,000.00 184,000.00

Kaca
- Kaca Clear 5 mm Kaca Clear 5 mm m2 300,000.00 345,000.00 345,000.00
- - m2 - -

g. Cat Dinding
- Interior
- Nipon Super Vinilex 8006-Lily White Nipon Super Vinilex 8006-Lily White m2 9,120.00 10,488.00 12,000.00 22,488.00
- Vinilex Pro Cat Interior 1.000-3033 Broken White 15 Lt Vinilex Pro Cat Interior 1.000-3033 Broken White 15 Lt m2 7,296.00 8,390.40 12,000.00 20,390.40
- - m2 - -

h Cat Dasar
- Danapaint Cat Dasar 591-0001 Alkali Resistant Sealer 20L Danapaint Cat Dasar 591-0001 Alkali Resistant Sealer 20L m2 7,040.00 8,096.00 12,000.00 20,096.00 40,486.40
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
- - m2 - -
Æ = 20 x 75
Æ = 1500

N = 150 x 3 x 4
1500 x 0.7 x 0.5 x

= 1800
525

N = 4
1

You might also like