GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Tuesday, 1 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 215.0 224.0 9.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 1 of 86
DATE: 01/08/2023 DATE: 02/08/2023
Page 2 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Tuesday, 1 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 215.0 224.0 9.0
TOTAL 5.80
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 3 of 86
DATE: 01/08/2023 DATE:
Page 4 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Tuesday, 1 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 224.0 234.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet loc. 18:30 19:00 00:30
Mixing Mud 19:00 19:30 00:30
Reaming Casing PQ 13.00 16.00 19:30 00:00 04:30 ACT
Rest time 00:00 01:00 01:00
Reaming Casing PQ 16.00 18.00 01:00 02:30 01:30 ACT
Continue Drill HQ 27.70 29.10 1.40 90% 02:30 04:30 02:00
Waiting water 04:30 05:30 01:00
Clean Up Area 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 5 of 86
DATE: 01/08/2023 DATE: 02/08/2023
Page 6 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Tuesday, 1 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 224.0 234.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 27.70 28.10 0.40 0.40 100%
Water Loss
Diamond Core Drilling Run 2 HQ 28.10 29.10 1.00 0.80 80%
TOTAL 1.40
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 7 of 86
DATE: 01/08/2023 DATE: 02/08/2023
Page 8 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Wednesday, 2 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 234.0 242.0 8.0
TOTAL - 12:00
PARTS, ACCESSORIES & INSTALLATIONS
PARTS & ACCESSORIES UNIT QTY QTY
CONSUMABLES TYPE SIZE FROM TO TOTAL
HQ Bit S6 SN (2397184 S6) AUS GEL (BAGS) 0.00
HQ Barrel 1.5m AMC EZEE PAC R (PAIL) - TROLL 0.53
Shoebit s/n : 2393484 AMC CR650/POLYMER (PAIL) 0.33
No. Stabilizer : 1221539_235186576 AMC LIQ ROD GREASE (Ltr) 0.00
dll………. AUS PLUG (BOX) 0.13
BENTONITE (BAGS)
SODA ASH (KGS) 3.00
CEMENT (BAGS)
ACTIVITIES SUMMARY (CHARGE) UNIT QTY dll………….
PQ Drilling Meter 0.00 INCLINO CASING (LGT)
HQ Drilling Meter 0.00 INCLINO TOP CAP (EA)
Active time (ACT) Hour 6.33 INCLINO BOTTOM CAP (EA)
Standby time (ST) Hour 1.66 INCLINO BOTTOM COUPLING (EA) MECHANICAL REPORT
Moving (MOV) To PRT-GT15 Trip 0 INCLINO CABLE (MTR) ( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Slow Drilling Rate (SLO) Shift GREASE (KGS) 1.00
HYDRAULIC OIL (LTS) 1.00
OIL 90 (LTS)
OIL 40 (LTS)
SAFETY WIRELINE (FOR VWP)
UDS TUBE, PVC FOR VWP, ETC
Fuel diesel (Litre) 100.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 9 of 86
Dian Kurniawan Angganitha
DATE: 02/08/2023 DATE: 03/08/2023
Page 10 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Wednesday, 2 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 234.0 242.0 8.0
TOTAL 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 11 of 86
Dian Kurniawan Angganitha
DATE: 02/08/2023 DATE: 03/08/2023
Page 12 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Wednesday, 2 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 242.0 252.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Mixing Mud 19:00 19:30 00:30 ACT
Handling Hole Collaps 19:30 22:00 02:30 ACT
Pull Out Rod and Reaming Casing 22:00 00:00 02:00 ACT
Rest time 00:00 01:00 01:00
Handling Water Loss 01:00 03:30 02:30 ACT
Waiting water 03:30 04:30 01:00 ST
Clean Up Area 04:30 05:00 00:30
TOTAL - 11:00
PARTS, ACCESSORIES & INSTALLATIONS
PARTS & ACCESSORIES UNIT QTY QTY
CONSUMABLES TYPE SIZE FROM TO TOTAL
HQ Bit S6 SN (2397184 S6) AUS GEL (BAGS) 0.00
HQ Barrel 1.5m AMC EZEE PAC R (PAIL) - TROLL 0.87
Shoebit s/n : 2393484/ 2392638 HQ AMC CR650/POLYMER (PAIL) 0.47
No. Stabilizer : 1221539_235186576 AMC LIQ ROD GREASE (Ltr) 0.00
dll………. AUS PLUG (BOX) 0.13
BENTONITE (KG)
SODA ASH (KGS) 3.00
CEMENT (BAGS)
ACTIVITIES SUMMARY (CHARGE) UNIT QTY dll………….
PQ Drilling Meter 0.00 INCLINO CASING (LGT)
HQ Drilling Meter 0.00 INCLINO TOP CAP (EA)
Active time (ACT) Hour 7.50 INCLINO BOTTOM CAP (EA)
Standby time (ST) Hour 1.00 INCLINO BOTTOM COUPLING (EA) MECHANICAL REPORT
Moving (MOV) Trip INCLINO CABLE (MTR) ( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Slow Drilling Rate (SLO) Shift GREASE (KGS) 0.00
HYDRAULIC OIL (LTS)
OIL 90 (LTS)
OIL 40 (LTS) 1.00
SAFETY WIRELINE (FOR VWP)
UDS TUBE, PVC FOR VWP, ETC
Fuel diesel (Litre) 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 13 of 86
DATE: 02/08/2023 DATE: 03/08/2023
Page 14 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Wednesday, 2 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 242.0 252.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
TOTAL 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 15 of 86
DATE: 02/08/2023 DATE:
Page 16 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Thursday, 3 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 252.0 261.0 9.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 17 of 86
Dian Kurniawan Angganitha
DATE: 03/08/2023 DATE: 04/08/2023
Page 18 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Thursday, 3 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 252.0 261.0 9.0
TOTAL 10.50
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 19 of 86
Dian Kurniawan Angganitha
DATE: 03/08/2023 DATE: 04/08/2023
Page 20 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Thursday, 3 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 261.0 271.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Waiting water 19:00 20:00 01:00 ST
Fill Water & Mixing Mud 20:00 22:30 02:30 ACT
Start Drill HQ 39.60 42.60 3.00 100% 22:30 00:00 01:30
Rest Time 00:00 01:00 01:00
Continue Drill HQ 42.60 47.10 4.50 100% 01:00 02:30 01:30
Fill Water & Mixing Mud 02:30 03:30 01:00 ACT
Continue Drill HQ 47.10 51.10 4.00 80% 03:30 05:30 02:00
Clean Up Area & Tools 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 21 of 86
DATE: 03/08/2023 DATE: 04/08/2023
Page 22 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Thursday, 3 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 IWAN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 261.0 271.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 39.60 41.10 1.50 1.50 100%
Diamond Core Drilling Run 2 HQ 41.10 42.60 1.50 1.50 100%
Diamond Core Drilling Run 3 HQ 42.60 44.10 1.50 1.50 100%
Diamond Core Drilling Run 4 HQ 44.10 45.60 1.50 1.50 100%
Diamond Core Drilling Run 5 HQ 45.60 47.10 1.50 1.50 100%
Diamond Core Drilling Run 6 HQ 47.10 48.60 1.50 1.50 100%
Diamond Core Drilling Run 7 HQ 48.60 50.10 1.50 1.50 100%
Diamond Core Drilling Run 8 HQ 50.10 51.10 1.00 0.40 40%
TOTAL 11.50
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 23 of 86
DATE: 03/08/2023 DATE: 04/08/2023
Page 24 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Friday, 4 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 271.0 274.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 25 of 86
Dian Kurniawan Angganitha
DATE: 04/08/2023 DATE:
Page 26 of 86
LLING REPORT
ICAL DRILLING
Friday, 4 August 2023
SUNNY
PT. BKP
PARTOLANG
PRT-GT15
TOTAL
3.0
REMARKS
INSTALLATIONS
TOTAL
MECHANICAL REPORT
( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Page 27 of 86
Angganitha
DATE:
Page 28 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Friday, 4 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 271.0 274.0 3.0
TOTAL 14.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 29 of 86
Dian Kurniawan Angganitha
DATE: 04/08/2023 DATE:
Page 30 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Friday, 4 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 274.0 283.0 9.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/ Assesment location 18:30 19:00 00:30
Down Hole Camera 19:00 20:00 01:00 ACT DHC Depth 60m
Fill Water & Mixing Mud 20:00 20:30 00:30 ACT
Start Drill HQ 65.10 77.10 12.00 100% 20:30 00:30 04:00
Rest Time 00:30 01:30 01:00
Continue Drill HQ 77.10 86.10 9.00 100% 01:30 04:30 03:00
Flushing Hole 04:30 05:30 01:00 ACT
Clean Up Area & Tools 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 31 of 86
DATE: 04/08/2023 DATE:
Page 32 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Friday, 4 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 274.0 283.0 9.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 65.10 66.60 1.50 1.50 100%
Diamond Core Drilling Run 2 HQ 66.60 68.10 1.50 1.50 100%
Diamond Core Drilling Run 3 HQ 68.10 69.60 1.50 1.50 100%
Diamond Core Drilling Run 4 HQ 69.60 71.10 1.50 1.50 100%
Diamond Core Drilling Run 5 HQ 71.10 72.60 1.50 1.50 100%
Diamond Core Drilling Run 6 HQ 72.60 74.10 1.50 1.50 100%
Diamond Core Drilling Run 7 HQ 74.10 75.60 1.50 1.50 100%
Diamond Core Drilling Run 8 HQ 75.60 77.10 1.50 1.50 100%
Diamond Core Drilling Run 9 HQ 77.10 78.60 1.50 1.50 100%
Diamond Core Drilling Run 10 HQ 78.60 80.10 1.50 1.50 100%
Diamond Core Drilling Run 11 HQ 80.10 81.60 1.50 1.50 100%
Diamond Core Drilling Run 12 HQ 81.60 83.10 1.50 1.50 100%
Diamond Core Drilling Run 13 HQ 83.10 84.60 1.50 1.50 100%
Diamond Core Drilling Run 14 HQ 84.60 86.10 1.50 1.50 100%
TOTAL 21.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 33 of 86
DATE: 04/08/2023 DATE:
Page 34 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Saturday, 5 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 283.0 292.0 9.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 35 of 86
Dian Kurniawan Angganitha
DATE: 05/08/2023 DATE: 08/08/2023
Page 36 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Saturday, 5 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 283.0 292.0 9.0
TOTAL 16.90
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 37 of 86
Dian Kurniawan Angganitha
DATE: 05/08/2023 DATE:
Page 38 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Saturday, 5 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 292.0 299.0 7.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Fill Water & Mixing Mud 19:00 19:30 00:30 ACT
Pull Out Rods 19:30 22:00 02:30 ACT
Handling Stuck Rods PQ 22:00 00:00 02:00 ACT
Rest Time 00:00 01:00 01:00
Waiting Water 01:00 01:30 00:30 ST
Fill Water & Mixing Mud 01:30 02:00 00:30 ACT
Handling Rods PQ 02:00 05:30 03:30 ACT
Clean Up Area & Tools 05:30 06:00 00:30
TOTAL - 12:00
PARTS, ACCESSORIES & INSTALLATIONS
PARTS & ACCESSORIES UNIT QTY QTY
CONSUMABLES TYPE SIZE FROM TO TOTAL
HQ Bit S6 SN (2397184 S6) AUS GEL (BAGS) 0.00
HQ Barrel 1.5m AMC EZEE PAC R (PAIL) - TROLL 0.53
Shoebit s/n : 2393484/ 2392638 HQ AMC CR650/POLYMER (PAIL) 0.27
No. Stabilizer : 1221539_235186576 AMC LIQ ROD GREASE (Ltr) 0.00
dll………. AUS PLUG (BOX) 0.00
BENTONITE (KG)
SODA ASH (KGS) 2.00
CEMENT (BAGS)
ACTIVITIES SUMMARY (CHARGE) UNIT QTY dll………….
PQ Drilling Meter 0.00 INCLINO CASING (LGT)
HQ Drilling Meter 0.00 INCLINO TOP CAP (EA)
Active time (ACT) Hour 9.00 INCLINO BOTTOM CAP (EA)
Standby time (ST) Hour 0.50 INCLINO BOTTOM COUPLING (EA) MECHANICAL REPORT
Moving (MOV) Trip INCLINO CABLE (MTR) ( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Slow Drilling Rate (SLO) Shift GREASE (KGS) 1.00
HYDRAULIC OIL (LTS) 1.00
OIL 90 (LTS)
OIL 40 (LTS)
SAFETY WIRELINE (FOR VWP)
UDS TUBE, PVC FOR VWP, ETC
Fuel diesel (Litre)
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 39 of 86
DATE: 05/08/2023 DATE: 08/08/2023
Page 40 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Saturday, 5 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 292.0 299.0 7.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
TOTAL 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 41 of 86
DATE: 05/08/2023 DATE: 08/08/2023
Page 42 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Sunday, 6 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 299.0 306.0 7.0
TOTAL - 12:00
PARTS, ACCESSORIES & INSTALLATIONS
PARTS & ACCESSORIES UNIT QTY QTY
CONSUMABLES TYPE SIZE FROM TO TOTAL
HQ Bit S6 SN (2397184 S6) AUS GEL (BAGS) 0.00
HQ Barrel 1.5m AMC EZEE PAC R (PAIL) - TROLL 0.00
Shoebit s/n : 2393484 AMC CR650/POLYMER (PAIL) 0.00
No. Stabilizer : 1221539_235186576 AMC LIQ ROD GREASE (Ltr) 0.00
dll………. AUS PLUG (BOX) 0.00
BENTONITE (BAGS)
SODA ASH (KGS) 0.00
CEMENT (BAGS)
ACTIVITIES SUMMARY (CHARGE) UNIT QTY dll………….
PQ Drilling Meter 0.00 INCLINO CASING (LGT)
HQ Drilling Meter 0.00 INCLINO TOP CAP (EA)
Active time (ACT) Hour 5.00 INCLINO BOTTOM CAP (EA)
Standby time (ST) Hour 1.00 INCLINO BOTTOM COUPLING (EA) MECHANICAL REPORT
Moving (MOV) To PRT-GT06 Trip 1 INCLINO CABLE (MTR) ( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Slow Drilling Rate (SLO) Shift GREASE (KGS)
HYDRAULIC OIL (LTS)
OIL 90 (LTS)
OIL 40 (LTS)
SAFETY WIRELINE (FOR VWP)
UDS TUBE, PVC FOR VWP, ETC
Fuel diesel (Litre)
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 43 of 86
Dian Kurniawan Angganitha
DATE: 06/08/2023 DATE: 09/08/2023
Page 44 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Sunday, 6 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 002 - LWMP
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 299.0 306.0 7.0
TOTAL 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 45 of 86
Dian Kurniawan Angganitha
DATE: 06/08/2023 DATE: 09/08/2023
Page 46 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Sunday, 6 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14722.0 14731.0 9.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/ Assesment location 18:30 19:00 00:30
Preparation drill 19:00 20:30 01:30
Set Up Core Barrel 20:30 21:30 01:00
Waiting Water 21:30 23:00 01:30 ST
Fill Water & Mixing Mud 23:00 23:30 00:30 ACT
Start Drill HQ 0.00 3.80 3.80 100% 23:30 01:00 01:30
Rest time 01:00 02:00 01:00
Continue Drill HQ 3.80 14.40 10.60 94% 02:00 04:30 02:30
Flushing Hole 04:30 05:30 01:00 ACT
Clean Up Tools & Area 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 47 of 86
DATE: 06/08/2023 DATE: 09/08/2023
Page 48 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Sunday, 6 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14722.0 14731.0 9.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 0.00 0.80 0.80 0.80 100%
Diamond Core Drilling Run 2 HQ 0.80 2.30 1.50 1.50 100%
Diamond Core Drilling Run 3 HQ 2.30 3.80 1.50 1.50 100%
Diamond Core Drilling Run 4 HQ 3.80 5.10 1.30 1.30 100%
Diamond Core Drilling Run 5 HQ 5.10 6.70 1.60 1.50 94%
Diamond Core Drilling Run 6 HQ 6.70 8.20 1.50 1.50 100%
Diamond Core Drilling Run 7 HQ 8.20 9.70 1.50 1.50 100%
Diamond Core Drilling Run 8 HQ 9.70 10.30 0.60 0.60 100%
Diamond Core Drilling Run 9 HQ 10.30 11.40 1.10 1.10 100%
Diamond Core Drilling Run 10 HQ 11.40 12.90 1.50 1.50 100%
Diamond Core Drilling Run 11 HQ 12.90 14.40 1.50 0.90 60%
TOTAL 14.40
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 49 of 86
DATE: 06/08/2023 DATE: 09/08/2023
Page 50 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Monday, 7 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14731.0 14739.0 8.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 51 of 86
Dian Kurniawan Angganitha
DATE: 07/08/2023 DATE: 09/08/2023
Page 52 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Monday, 7 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14731.0 14739.0 8.0
TOTAL 25.10
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 53 of 86
Dian Kurniawan Angganitha
DATE: 07/08/2023 DATE: 09/08/2023
Page 54 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Monday, 7 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14739.0 14749.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Fill Water & Mixing Mud 19:00 19:30 00:30 ACT
Continue Drill HQ 39.50 40.10 0.60 100% 19:30 20:00 00:30
Pull Out Rods to Handling Block Bit 20:00 21:00 01:00 ACT
Continue Drill HQ 40.10 47.40 7.30 100% 21:00 00:30 03:30
Rest Time 00:30 01:30 01:00
Fill Water & Mixing Mud 01:30 02:00 00:30 ACT
Continue Drill HQ 47.40 50.40 3.00 100% 02:00 03:00 01:00
Re-Pull Out Rods to Handling Block Bit 03:00 03:30 00:30 ACT
Flushing Hole 03:30 04:00 00:30 ACT
Continue Drill HQ 50.40 54.70 4.30 100% 04:00 05:30 01:30
Clean Up Tools and Area 05:30 05:59 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 56 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Monday, 7 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14739.0 14749.0 10.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 39.50 40.10 0.60 0.60 100%
Diamond Core Drilling Run 2 HQ 40.10 40.90 0.80 0.80 100%
Diamond Core Drilling Run 3 HQ 40.90 41.40 0.50 0.50 100%
Diamond Core Drilling Run 4 HQ 41.40 42.90 1.50 1.50 100%
Diamond Core Drilling Run 5 HQ 42.90 44.40 1.50 1.50 100%
Diamond Core Drilling Run 6 HQ 44.40 45.90 1.50 1.50 100%
Diamond Core Drilling Run 7 HQ 45.90 47.40 1.50 1.50 100%
Diamond Core Drilling Run 8 HQ 47.40 48.90 1.50 1.50 100%
Diamond Core Drilling Run 9 HQ 48.90 50.40 1.50 1.50 100%
Diamond Core Drilling Run 10 HQ 50.40 51.90 1.50 1.50 100%
Diamond Core Drilling Run 11 HQ 51.90 53.40 1.50 1.50 100%
Water Loss
Diamond Core Drilling Run 12 HQ 53.40 54.70 1.30 1.30 100%
TOTAL 15.20
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 58 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Tuesday, 8 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14749.0 14758.0 9.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 59 of 86
Dian Kurniawan Angganitha
DATE: 08/08/2023 DATE: 10/08/2023
Page 60 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Tuesday, 8 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT15
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 115 INCLIN. -78
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14749.0 14758.0 9.0
TOTAL 20.80
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 61 of 86
Dian Kurniawan Angganitha
DATE: 08/08/2023 DATE: 10/08/2023
Page 62 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Tuesday, 8 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14758.0 14764.0 6.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Waiting Water 19:00 20:30 01:30 ST
Fill Water & Mixing Mud 20:30 21:30 01:00 ACT
Continue Drill HQ 76.90 77.30 0.40 100% 21:30 00:00 02:30
Rest Time 00:00 01:00 01:00
Continue Drill HQ 82.00 84.90 2.90 100% 01:00 04:30 03:30
Down Hole Camera 04:30 05:00 00:30 ACT
Flushing Hole 05:00 05:30 00:30 ACT
Clean Up Tools and Area 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 64 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Tuesday, 8 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 14758.0 14764.0 6.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 75.50 76.90 1.40 1.40 100%
Diamond Core Drilling Run 2 HQ 76.90 77.30 0.40 0.40 100%
Diamond Core Drilling Run 3 HQ 77.30 78.90 1.60 1.60 100%
Diamond Core Drilling Run 4 HQ 78.90 80.40 1.50 1.50 100%
Diamond Core Drilling Run 5 HQ 80.40 82.00 1.60 1.60 100%
Diamond Core Drilling Run 6 HQ 82.00 83.40 1.40 1.40 100% Water Loss
Diamond Core Drilling Run 7 HQ 83.40 84.90 1.50 1.50 100%
Diamond Core Drilling Run 8 HQ 84.90 86.40 1.50 1.50 100%
Diamond Core Drilling Run 9 HQ 86.40 87.90 1.50 1.50 100%
Diamond Core Drilling Run 10 HQ 87.90 89.40 1.50 1.50 100%
Diamond Core Drilling Run 11 HQ 89.40 90.40 1.00 1.00 100%
TOTAL 14.90
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 66 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Wednesday, 9 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14749.0 14758.0 9.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 67 of 86
Dian Kurniawan Angganitha
DATE: 09/08/2023 DATE:
Page 68 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Wednesday, 9 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 14749.0 14758.0 9.0
TOTAL 15.60
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 69 of 86
Dian Kurniawan Angganitha
DATE: 09/08/2023 DATE:
Page 70 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Wednesday, 9 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT05
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 170 INCLIN. -65
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 306.0 306.0 0.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesment location 18:30 19:00 00:30
Rig Down Desco 7000 19:00 20:30 01:30
Prepare Moving LWMP 20:30 21:30 01:00
Set Up Rig LWMP 21:30 00:00 02:30
Rest Time 00:00 01:00 01:00
Setting Equpment LWMP 01:00 02:30 01:30
Setting Water Line from Settling pond 02:30 05:30 03:00 ACT
Clean Up Tools and Area 05:30 06:00 00:30
TOTAL - 12:00
PARTS, ACCESSORIES & INSTALLATIONS
PARTS & ACCESSORIES UNIT QTY QTY
CONSUMABLES TYPE SIZE FROM TO TOTAL
HQ Bit SN (2391147 59 ) AUS GEL (BAGS) 0.00
HQ Barrel 1.5m AMC EZEE PAC R (PAIL) - TROLL 0.00
Shoebit s/n : 2393484/ 2392638 HQ AMC CR650/POLYMER (PAIL) 0.00
No. Stabilizer : 1221539_235186576 AMC LIQ ROD GREASE (Ltr) 0.00
dll………. AUS PLUG (BOX) 0.00
BENTONITE (KG)
SODA ASH (KGS)
CEMENT (BAGS)
ACTIVITIES SUMMARY (CHARGE) UNIT QTY dll………….
PQ Drilling Meter 0.00 INCLINO CASING (LGT)
HQ Drilling Meter 0.00 INCLINO TOP CAP (EA)
Active time (ACT) Hour 3.00 INCLINO BOTTOM CAP (EA)
Standby time (ST) Hour INCLINO BOTTOM COUPLING (EA) MECHANICAL REPORT
Moving (MOV) LWMP To PRT-GT05 Trip 1 INCLINO CABLE (MTR) ( BREAKDOWN DETAILS REPAIRS REQ. ETC.)
Slow Drilling Rate (SLO) Shift GREASE (KGS)
HYDRAULIC OIL (LTS)
OIL 90 (LTS)
OIL 40 (LTS)
SAFETY WIRELINE (FOR VWP)
UDS TUBE, PVC FOR VWP, ETC
Fuel diesel (Litre)
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 72 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Wednesday, 9 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT05
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 170 INCLIN. -65
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 306.0 306.0 0.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
TOTAL 0.00
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 74 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Thursday, 10 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 306.0 310.0 4.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 75 of 86
Dian Kurniawan Angganitha
DATE: 10/08/2023 DATE:
Page 76 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Thursday, 10 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 306.0 310.0 4.0
TOTAL 6.50
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 77 of 86
Dian Kurniawan Angganitha
DATE: 10/08/2023 DATE:
Page 78 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Thursday, 10 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT05
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 170 INCLIN. -65
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMO 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 310.0 317.0 7.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE TIME COST
DRILLING ACTIVITY /SIZE
REMARKS
FROM TO (M) REC (%) FROM TO TOTAL CODE
Safety/Toolbox Meeting 18:00 18:30 00:30
Prestart Check/Assesmet location 18:30 19:00 00:30
Mixing Mud 19:00 19:30 00:30 ACT
Start Drill HQ 6.50 12.00 5.50 100% 19:30 22:00 02:30
Install Casing PQ 0.00 3.00 22:00 22:30 00:30 ACT
Reaming Casing 22:30 23:00 00:30 ACT
Continue Drill HQ 12.00 15.10 3.10 100% 23:00 00:00 01:00
Rest Time 00:00 01:00 01:00
Mixing Mud 01:00 01:30 00:30 ACT
Continue Drill HQ 15.10 19.20 4.10 100% 01:30 04:30 03:00
Flushing Hole 04:30 05:30 01:00 ACT
Clean Up Tools and Area 05:30 06:00 00:30
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 80 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT NIGHT SHIFT DAY/DATE Thursday, 10 August 2023
TITLE NAME START FINISH HOURS WEATHER FAIR
PJO HEPY YANDRA/DIAN.K 18:00 6:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 18:00 6:00 HOURS LOCATION PARTOLANG
DRILLER SARWOTO/M. KHOLIS 18:00 6:00 HOURS HOLE NO. PRT-GT05
DRILL ASST. 1 ALI 18:00 6:00 HOURS AZIMUTH 170 INCLIN. -65
DRILL ASST. 2 AWALUDIN 18:00 6:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/OKTOVIANUS/AMON 18:00 6:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 18:00 6:00 HOURS RIG HOURS 310.0 317.0 7.0
HOURS
DRILLING ACTIVITY & PROGRESS
UNIT DEPTH (M) TOTAL CORE
DRILLING ACTIVITY /SIZE
CORE REMARK
FROM TO (M) REC (%)
Diamond Core Drilling Run 1 HQ 6.50 8.00 1.50 1.50 100%
Diamond Core Drilling Run 2 HQ 8.00 9.50 1.50 1.50 100%
Diamond Core Drilling Run 3 HQ 9.50 11.00 1.50 1.50 100%
Diamond Core Drilling Run 4 HQ 11.00 12.00 1.00 1.00 100%
Diamond Core Drilling Run 5 HQ 12.00 13.50 1.50 1.50 100%
Diamond Core Drilling Run 6 HQ 13.50 14.00 0.50 0.50 100% Semi Water Loss
Diamond Core Drilling Run 7 HQ 14.00 15.10 1.10 1.10 100%
Diamond Core Drilling Run 8 HQ 15.10 16.40 1.30 1.30 100%
Diamond Core Drilling Run 9 HQ 16.40 17.00 0.60 0.60 100%
Diamond Core Drilling Run 10 HQ 17.00 17.80 0.80 0.80 100%
Diamond Core Drilling Run 11 HQ 17.80 18.70 0.90 0.90 100%
Diamond Core Drilling Run 12 HQ 18.70 19.20 0.50 0.50 100%
TOTAL 12.70
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 82 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Friday, 11 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 317.0 321.0 4.0
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 83 of 86
Dian Kurniawan Angganitha
DATE: 11/08/2023 DATE:
Page 84 of 86
DAILY DRILLING REPORT
GEOTECHNICAL DRILLING
CORE RECOVERY CORING DATA
DRILLING CREWS SHIFT DAY SHIFT DAY/DATE Friday, 11 August 2023
TITLE NAME START FINISH HOURS WEATHER SUNNY
PJO HEPY YANDRA/DIAN.K 6:00 18:00 HOURS CLIENT PT. BKP
SUPERVISOR NOR FU'AD 6:00 18:00 HOURS LOCATION PARTOLANG
DRILLER R. DONAL 6:00 18:00 HOURS HOLE NO. PRT-GT06
DRILL ASST. 1 RANDI 6:00 18:00 HOURS AZIMUTH 105 INCLIN. -73
DRILL ASST. 2 YUDISTIRA 6:00 18:00 HOURS RIG NO. RIG BMP 001 - DESCO 7000
HELPER 1 RIZAL/ELMANDO/AMON 6:00 18:00 HOURS EQUIPMENT START FINISH TOTAL
HELPER 2 RENO/MELKY/SIMON 6:00 18:00 HOURS RIG HOURS 317.0 321.0 4.0
TOTAL 3.40
COMMENTS:
Note :
PT. BMP DRILL PT. BATUTUA KHARISMA PERMAI
Page 85 of 86
Dian Kurniawan Angganitha
DATE: 11/08/2023 DATE: