Professional Documents
Culture Documents
国际玻璃陶瓷切削机SKII产品手册(英文)终版1025
国际玻璃陶瓷切削机SKII产品手册(英文)终版1025
INSTRUCTION MANUAL
YL-SKII
�
�
�
�
-�-
�
�
�
�
YL-SKII Back schematic diagram
�.Patch penal �.Reverses Dust Cleaner �.Air Fan �.Barometer �.air pipe,water pipe
�. PARAMETER
Product Dimension(L*W*H) ���*���*���mm
Product weight ���KG
Rotation angle of the axis A:+���° B:±��°
Stroke(X/Y/Z) ���*���*��mm
Total Power ���W
Milling Precision �.��mm
Magazine Capacity �
Cutter diameter �mm Diameter
�-axis ganged milling
Processing way
wet milling
Inner crown/single crown/
Processable product
Inlay/Titanium column
-�-
Regulated voltage: ���-���V
Regulated air pressure≥�.�bar
Installation condition
Temperature: ��-��°
Relative humidity<��%
USB/Ethernet connection
Transfer interface
( Rear USB interface ,cable interface)
Processable product Glass ceramic/Premills
�. TRANSPORTATION
CAUTION!!
To confirm a continuous normal use, we require the operators and maintainer are
qualified to transfer and pack, so please read these cautions below carefully.
�.� PACKING
The outer packing is composed with a wooden base, cotton and paper surroundings,
then wooden box outside. This is an unique designed packing way, could avoid physical
damage and other damages in the maximum during the transportation process. To
avoid damage,corrosion or other possible breakge, please do not disassemble the outer
packing carton before installation. When disassemble the package, try to ensure the
integrity of the package for the purpose of resume if need to return the equipment to the
factory.
-�-
�. PACKING LIST
Removing the package, check the packing list firstly. Please check if all items included
below.
� Glass Ceramic Milling Bur D�.� /D�.� /D�.� per one Pcs �
��� Hexagon socket
� �*��MM Pcs ��
head cap screw
�. INSTALLATION INSTRUCTIONS
�.� Installation requirement
Installation place must satisfy these conditions below:
➀ Forbidden to operate the equipment under extremely oil, solvent or moisture
environment; Forbidden to operate under polluted air condition; The equipment
platform should be flat and stable,the flatness of installation area should be below �mm,
the slopes ≤�℃ per square meter.
➁ The equipment placement platform should bear more than ���KG in weight with a
stable support to avoid the shocking during the process to avoid the influence to the
process precision .
-�-
➂ The space between the equipment and wall should be ��-��cm to confirm space
between the line and pipe and regular air circulate.
➃ The Regular and stable ���Vpower supply is needed; we suggest use a Voltage
Stabilizer and the Separated Wiring to confirm normal ground connection.
➄ Air supply �-�bar, no water no oil, regular flow. Suggested equipped with an indepen-
dent Air Tank and Air Dry Filter.
➅ Must equipped with an engineering Dust Collector, or Central Dust Collection Device.
�.� Internet
The equipment and computer must connected in one network with same IP, or use USB
for transmit.
Software HyperDENT V�
CPU Intel Core i�/i� �,�GHz Recommended
Memory ��G Recommended
Graphics NVIDIA inner core,video memory �G Recommended
Preinstalled system Win�� professional ��bite
HDD ���G
Caution:
Put the equipment wiring into the independent fuse wiring,or confirm no other
equipment connected into the same power source, to avoid voltage fluctuation.
Because great voltage fluctuation could cause control disturbances and system failures.
Attention:
The incoming compressed air pumped into the machine must no oil and dry, or may
damage the Spindle and the Electric Elements.
-�-
�. EQUIPMENT OPERATION
Control Interface
The incoming compressed air pumped into the machine must no oil and dry,or may
damage the Spindle and the Electric Elements.
� �
�
�
� �
-�-
Figure Page of operation system - Second page (Auxiliary page)
�. Frontage: Each axis rotate to the right side up position of the preset clamp.
�. Clamp Location: Each axle operated to the convenient preset position.
�. Magazine door: To control the door opened or closed.The button comes into effect
only until all axis operated in a security location
�. Tool setting: Test the Tool Length of current axle clamped.
�. Air blow:Open or close the air blow Solenoid Valve.
�. Loosen or clamp tool: Loosen or close the clamp head of the principle axis.
�. Software installation: Load software to changing or upgrading the system software
from outer medium.
�. T�: Replace the current clamped tool of the principle axle to confirm all back to preset
security location.
�. Network settings: set the network IP and the sharing catalog.
��. Maintainence: Display the information of the system.
Attention:
The processing area is the dangerous area, forbid to open the door during processing.
-�-
�. OPERATING GUIDE
�.� hyperDENTV�.� Usage guide
➀ ➁ ➂ ➃ ➄ ➅ ➆ ➇
➀Set the whole processing position. ➁Mark the characteristic line.
➂Height optimition. ➃Processing Strategy for choose.
➄Mark on the data surface. ➅Connecting Rod and Sintering Frame.
➆Maxillofacial support nail. ➇Customize area mark.
-�-
�. GUARANTEE
�.� Warranty
�. One year warranty for whole machine, except consumables (tools, filter, test materials,
etc.)
�. Within the warranty service, if the machine breakdown,the technician of Party A, need
to give FREE guidance (call or long-distance guide) to Party B, assist solving the issues
within ��hours after received the maintenance requirements.
�. Within the warranty service, after received maintenance requirement from Party B, if
the calling/online guidance could not solve the fault, Party A need to arrange techni-
cians give remote assistance, or provide a standby equipment to Party B for FREE. Party
B return back the broken equipment to the named place for FREE maintenance, the
freight is on Party A.
�. Equipment breakdown out of the warranty period, after Party B reported the mainte-
nance requirement, Party A technician need to response within ��hours, assist Party B
solve the issues by call or remote assistance.
�. Out of warranty period, if Party B report the maintenance requirement, call/web could
not solve the fault, Party A will arrange technician to give remote assistance according to
the fault degree, if repair onsite is necessary, Party B need to afford the cost of technician
travel expense, man-hour cost, and the consumable cost. Or Party A provide a standby
equipment, and Party B expressed the breakdown one to the named place for repair.
The cost of standby equipment, double-way freight for broken equipment, technician
man-hour cost and the consumables are all on Party B.
�.� Training
�. Party A is responsible for equipment installation, testing and usage training for �days
(provide remote training assistance to oversea clients.
�. Training details: equipment operation, maintenance, composing, etc., confirm the
clients technician could operate, maintain and manage the equipment independently.
�. Software details for operation, please follow the official instruction files.
-�-
Product warranty card
User name:
Postal address:
Contact number:
Product number:
Telephone: ���-��������
F a x : ���-��������
W e b s i t e : www.yilink-dental.com
E m a i l : yilink.gz@yilink-medical.com
A d d r e s s : Room ���, NO.���, Ke Zhu RD. Science City,
Hi-tech Development Zone, GZ, China.