FIRST ANGLE PROJECTION ALL DIMENSIONS ARE IN MM

20-001-HT-PHC-PI-TAP 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
.oN GNIWARD

1 2 3 4 5 6 7 8 9 10
A A
37500
3000 4500 4500 4500 4500 4500 4500 4500 3000

D
DET- A DET- A
B B
DET- C DET- C
DET- A DET- C DET- C
DET- A DET- C DET- C

4800

7500
C C

C
DET- B
2700

Fold-7 DET- B
D D
15000

CL_OF_TRUSS
2700

E E

DET- B

B
it must not be used directly or indirectly in any way deterimental to the interest of the company.
The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED

DET- B

7500
COPY RIGHT AND CONFIDENTIAL

F F
4800

DET- A DET- C DET- C DET- C DET- C DET- C DET- C


DET- A DET- A DET- A

G G

BASE PLATE PLAN


1:60
Notes-
1) All anchor bolts shall be 4.8 grade and minimum embedded length for M42 bolt is 800mm
1 and projection from Top of Concrete=185mm and For M30 bolt the embedded length is 650mm
C and Projection from concrete TOP is 150mm.
1 2) Foundation grade Concrete considered is M28 ( Cylinder stress) sufficient Pedestal main bar
1 CT125X125X18.65
50mm(TYP) 2 and stirrups required to achieve a Bolt Tension and Shear as mentioned.
H H
for M42 dia Anchor ISMB600 For M42 Bolt- Working Tension=93KN, Shear-48 KN
45

75 250 75 bolt.
For M30 Bolt- Working Tension=48KN, Shear-24 KN
60

30 225 300 225


ISMB600 4 - 48 Ø HOLES
45

Fold-6
75 300mm (Min) if any 3) All welds with baseplate and gusset plate / Stiffener plate shall be 8mm fillet weld allround
30 200mm ISMB600
connection problem
75

4) All steel sections are Hot rolled sections as per IS-808 of minimum yield stress-250 MPa.
187

2
TY 0 with bracing
16 THK
P 16 THK
5) All connection bolts shall be 8.8 grade.
250

PLATE PLATE
10 retain-400
16

C
150
250

400
30

4 - 22 Ø HOLES 6) All weld size shall be 5mm UNO, for plate to plate and Plate to ISMB section it will be 8MM.
D

280
FFL.
300
700

150 12 THK 7) All weld to baseplate shall be 8mm thick.


1 1
GUSSET PLATE
FFL. 8) Provide 25mm thick Non shrink contentious grout below the baseplate.
95
75

30
I
450
212

16 THK plate ISSUE FOR REVIEW


00 shall LG LG SS 01.07.2023
4 - 48 Ø HOLES
700 30 THK
PLATE 25mm Thk plate 9) Minimum bolt Edge distance shall be 6times Diameter of Bolt, accordingly the pedestal
No DESCRIPTION DRN CHECKED APPROVED DATE I
be sized.
400 30 THK
PLATE FGL. 25mm THK 10) In case of any doubt, consult with Engineer in charge.
DETAILS OF TRUSS & GABLE END
04. BRACING FOR MAINLINE PUMP SHED
9200-12203-40301-009-00
(KGPL-2294-00)
DETAIL - A 36 dia. hole for 2 TYP FGL. 11) All dimensions are mm UNO.
AT PIPAVA
03. DETAILS OF GANTRY BRACKET, SIDE 9200-12203-40301-011-00
1:20 DETAIL 1 M30 Anchor bolt RAIL & LONGITUDINAL BRACING FOR (KGPL-2296-00)
1:20 DETAIL - B DETAIL 2
MAINLINE PUMP SHED AT PIPAVA
9200-12203-40301-008-00
J
1:20 02. DETAILS OF FOUNDATION, PEDESTAL
1:20 AND PLINTH BEAM FOR MAINLINE (KGPL-2293-00)
3 PUMP SHED AT PIPAVAV
J
3 G.A. AND DETAILS OF MAINLINE
01. PUMP SHED AT PIPAVAV 9200-12203-40301-003-00
300 (KGPL-2156-00)

50 200 50 ISMB600 S.NO REFERENCE DRAWING DWG. NO


For M30 anchor
bolt REFERENCE DOCUMENTS / DRAWINGS
ISMB600

CLIENT
16 THK IHB LIMITED
238

PLATE
4 - 36 Ø HOLES
PROJECT
KANDLA-GORAKHPUR LPG PIPELINE PROJECT
D
200
700

PMC
INDIAN OIL CORPORATION LIMITED
250

K
PLT3095 IndianOil Bhawan,Sector-1, Noida (UP)
3 3
FFL.
263

25

EPC CONTRACTOR:
75

SCALE:-
AS SHOWN
25 THK
BANKAPUR ENGINEERS & CONSULTANTS PVT. LTD.
70 PLATE

FABRICATION CONTRACTOR:

300 FGL. QUALITY FABRICATORS AND ERECTORS PVT. LTD.

DETAIL 3
L
DETAIL - C 1:20
NAME DATE DRAWING TITLE :-
ERECTION DRWAING OF MAINLINE PUMP SHED AT PIPAVAV
1:20
DRN LG 01.07.2023
DRAWING
DESCRIPTION :-
CHD LG 01.07.2023 BASE PLATE PLAN

DRAWING DOCUMENT NO. :-


APPD SS 01.07.2023 PAT-IP-CHP-TH-100-02 SHEET: OF REV.: 00