A PEKERJAAN PERSIAPAN
1 Papan Proyek 1,00 unit -212 -212
2 Pek. Laporan & Dokumentasi 1,00 ls -212 -212
Sub Total A -425 -425
B PEKERJAAN PFONDASI DAN TANAH
1 Pek. Galian Tanah Pondasi 79,84 m3 49.788 3.975.037
2 Pek. Urug Tanah Kemabali 26,61 m3 24.788 659.596
3 Pek. Urug Tanah Peniggian Pell Lantai (1 -10 cm) 22,40 m3 -212 -4.759
4 Pek. Pasir Urug
- Bawah Fondasi 7,79 m3 29.788 232.045
- Bawah Lantai 11,20 m3 29.788 333.620
5 Pek. Findasi Tepok P1 (90 x 90 x 20)
- Beton K-225 2,59 m3 64.788 167.800
- Pembesian 639,36 kg 10.288 6.577.439
- Bekisting 11,52 m2 39.788 458.352
6 Pek. Fondasi Batu Belah P2 27,51 m3 24.788 681.905
7 Pek. Fondasi Tapak P3 (50 x 50 x 20)
- Beton K-255 0,10 m3 64.788 6.479
- Pembersian 26,64 kg 10.288 274.060
- Bekisting 0,80 m2 39.788 31.830
8 Pek. Sloof Beton S1 (15/30)
- Beton K-255 4,14 m3 64.788 268.220
- Pembesian 752,64 kg 10.288 7.742.811
- Bekisting 55,26 m2 39.788 2.198.659
9 Pek. Sloof Beton S2 (15/25)
- Beton K-255 0,26 m3 64.788 16.845
- Pembesian 53,42 kg 10.288 549.560
- Bekisting 3,40 m2 39.788 135.278
Sub Total B 618.176 24.304.777
C PEKERJAAN STRUKTURAL
C.1 STRUKTUR BETON
1 Pek. Kolam Beton K1 (25/25) T.1,35 m
- Beton K-255 0,17 m3 64.788 11.014
- Pembesian 27,71 kg 10.288 285.068
- Bekisting 2,70 m2 39.788 107.426
2 Pek. Kolam Beton K2 (25/25) T.4,93 m
- Beton K-255 1,85 m3 64.788 119.857
- Pembesian 303,61 kg 10.288 3.123.399
- Bekisting 29,58 m2 59.788 1.768.515
3 Pek. Kolam Beton K3 (25/25) T.4,58 m
- Beton K-255 0,57 m3 64.788 36.929
- Pembesian 94,02 kg 10.288 967.234
- Bekisting 9,16 m2 59.788 547.654

Page 1
Sheet2_2
4 Pek. Kolam Beton K4 (25/25) T.4,08 m
- Beton K-255 0,51 m3 64.788 33.042
- Pembesian 83,86 kg 10.288 862.713
- Bekisting 8,17 m2 59.788 488.464
5 Pek. Kolam Beton K5 (25/25) T.3,5 m
- Beton K-255 1,31 m3 64.788 84.872
- Pembesian 215,54 kg 10.288 2.217.375
- Bekisting 21,00 m2 44.788 940.538
6 Pek. Kolam Beton K1 (25/25) T.90 cm
- Beton K-255 1,01 m3 64.788 65.435
- Pembesian 166,28 kg 10.288 1.710.611
- Bekisting 16,20 m2 39.788 644.558
7 Pek. Kolam Praktis K{ (11/11)
- Beton K-175 0,51 m3 64.788 33.042
- Pembesian 341,04 kg 10.288 3.508.461
- Bekisting 18,48 m2 39.788 735.274
8 Pek. Kolam Beton B1, B2 (20/30)
- Beton K-255 2,88 m3 64.788 186.588
- Pembesian 322,18 kg 10.288 3.314.438
- Bekisting 28,40 m2 59.788 1.697.966
9 Pek. Kolam Balok Lintel BL (12/15). RB (12/15)
- Beton K-175 1,65 m3 59.788 98.649
- Pembesian 384,73 kg 10.288 3.957.924
- Bekisting 38,60 m2 39.788 1.535.799
10 Pek. Ramp Beton T = 10 cm
- Beton K-175 0,46 m3 59.788 27.502
- Pembesian 33,07 kg 10.288 340.209
- Bekisting 0,66 m2 39.788 26.260
11 Pek. Balok B3 dan Balokl Sopi-Sopi (15/20)
- Beton K-175 1,02 m3 59.788 60.983
- Pembesian 195,98 kg 10.288 2.016.151
- Bekisting 18,70 m2 59.788 1.118.027
12 Pek. Plat Beton Topi-Topi (10/55)
- Beton K-255 0,62 m3 59.788 37.068
- Pembesian 83,33 kg 10.288 857.260
- Bekisting 7,39 m2 39.788 294.030
13 Pek. Kolam pipa besi 3”
- Pipa besi 18,70 m1 54.788 1.024.527
- Ankur Ø 12mm 16,00 bh 49.788 796.601
- Baut 12 m 16,00 bh 29.788 476.601
- Base plate 6 mm uk. 25 x 25 cm 5,89 kg 49.788 293.249
- Plate 6 mm uk. 7,5 x 7,5 cm dudukan rangka atap 1,06 kg 59.788 63.375
C.2 PEKERJAAN ATAP
Rangka Atap
1 L 40.40.4 320,04 kg -212 -67.997
2 2 X L 50,50,5 985,50 kg -212 -209.383
3 Kuda Kuda 2 x C 100.50.20.2,3 34,44 kg -212 -7.317
4 Gording C 100.50.20.2,3 811,80 kg -212 -172.478
5 L 50,50,5 dudukan gording 41,45 kg -212 -8.807
6 Trekstang Ø 12 94,25 kg -212 -20.025
7 Ikat angin Ø 16 187,70 kg -212 -39.880
8 Pelat sampin g T 10 mm 339,12 kg -212 -72.051
9 Angker Ø 16 x 300 mm 64,00 bh -212 -13.598
10 Bout M12 x 30 mm 608,00 bh -212 -129.178
11 Cat Sincromat Rangkas baja 101,18 m2 -212 -21.497
Penutup
1 Atap Spandek t = 0,35 mm 285,12 m2 -212 -60.578
2 Pasang Alumunium Foil, Glosuol, Roofmesh 140,00 m2 -212 -29.745

Page 2
Sheet2_2
3 Listplank GRC 82,00 m2 -212 -17.422
4 Non samping flashing plat 63,20 m1 -212 -13.428
Sub Total C 1.704.102 35.631.304
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Ranka Hollow 4/4; t = 0,35 128,80 m2 39.788 5.124.635
2 Plafond Calsiboard 4,5 mm + Rangka 73,92 m2 29.788 2.201.895
3 Lis Gipsum 5 cm 227,20 m2 19.788 4.495.728
Sub Total D 89.363 11.822.257
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 247,60 m2 99.788 24.707.394
2 Plester dan Acian 495,21 m2 69.788 34.559.486
3 Pasang Rolliang Bata 70,30 m2 19.788 1.391.064
4 Pekerjaan Lapis cor Beton t – 5 cm bawah lantai keramik 9,60 m2 79.788 765.960
5 Pekarjaan Meja Beton Wastafel t – 8 cm 0,10 m2 -212 -21
6 Pasangan Keramik Lantai 40/40 Polished 129,43 m2 54.788 7.091.151
7 Pasangan Keramik Lantai 30/30 UnPolished (rabat) 55,60 m2 49.788 2.768.187
8 Pasangan keramik Lantai 30/30 Unpolished 2,97 m2 49.788 147.869
9 Pasangan Kplint Keramik Lantai 40/10 polished 119,60 m2 34.788 4.160.589
10 Pasangan Keramik meja & dinding wastafel 30/30 Polished 3,99 m2 59.788 238.552
11 Pasangan Keramik Dinding 30/40 Polished 12,20 m2 59.788 729.408
12 Plestran & Acian Kaprot halus Kolam Entrace 5,12 m2 -212 -1.088
13 Pek. Logo & tulisan plat dinding fln. Cat duco 1,00 ls -212 -212
14 Pasang Prasasti granit 40/60 1,00 ls 99.788 99.788
15 Pasang Papan Nama (terpasang) 1,00 ls 149.788 149.788
Sub Total E 826.813 76.807.913
F PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen/Pintu type P1 1,00 unt -212 -212
2 Kusen/Pintu type P2 4,00 unt -212 -850
3 Kusen/Pintu type P3 1,00 unt -212 -212
4 Kusen/Pintu type P4 (Spandrel) 1,00 unt -212 -212
5 Kusen/Pintu type J1 9,00 unt -212 -1.912
6 Kusen/Pintu type J3 4,00 unt -212 -850
7 Kusen/Pintu type BV 1,00 unt -212 -212
8 Tralis Jendela (Besi begel) 1,00 -212 -212
Sub Total F -1.700 -4.674
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 247,60 m2 -212 -52.606
2 Pek. Pengecatan Dinding Exterior 247,60 m2 -212 -52.606
3 Pek. Pengecatan Plafond 202,72 m2 -212 -43.071
4 Pek. Pengecatan Listplank 32,80 m2 -212 -6.969
Sub Total G -850 -155.252
H PEKERJAAN PLUMBING DAN SANITER
1 Instalasi Pipa PVC AW 4” 17,00 m2 -212 -3.612
2 Instalasi Pipa PVC AW 3” 12,00 m2 -212 -2.550
3 Instalasi Pipa PVC AW 2” 2,00 m2 -212 -425
4 Instalasi Pipa PVC AW 3/4” 20,00 m2 -212 -4.249
5 Instalasi Pipa PVC AW 1/2” 10,00 m2 -212 -2.125
6 Septicktank dan Rembesan 1,00 unt -212 -212
7 Pemasangan Closet Jongkok 1,00 bh -212 -212
8 Pemasangan Keran Air 2,00 bh -212 -425
9 Pemasangan Wastafel dan Keran 2,00 bh -212 -425
10 Floor Drain 1,00 bh -212 -212
11 Pemasangan Cermin Wastafel 100 x 160 1,00 unt -212 -212
Sub Total H -2.337 -14.660
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik (BP) dan UJL 55.000,00 VA -212 -11.685.529
2 Perijinan Sertifikat Layak Operasi (SLO) 55.000,00 VA -212 -11.685.529
3 Panel Listrik Indoor (30 x40 x 17) 1,00 unt -212 -212

Page 3
Sheet2_2
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2,00 m2 -212 -425
5 Pek. Instalasi Penerangan dan Power NYM 3 x 2,5 mm2 dan conduit 26,00 ttk -212 -5.524
6 Pek. Instalasi Power AC 2 PK (18000 BTU) 2,00 ttk -212 -425
7 Pemasangan Lampu TL LED 2 X 18 120 cm KAV V 13,00 bh -212 -2.762
8 Pemasangan Lampu Baret/Kap Baret LED 17 Watt Outbow 7,00 bh -212 -1.487
9 Pemasangan Lampu Sorot Outdoor 20 Watt 2,00 bh -212 -425
10 Pemasangan Lampu Philips Downlight LED 9 Watt Putih 4,00 bh -212 -850
11 Pemasangan Saklar Tunggal 4,00 bh -212 -850
12 Pemasangan Sakral Ganda 5,00 bh -212 -1.062
13 Pemasangan Stop Kibtak Single 8,00 bh -212 -1.700
14 Pemasangan Stop Kontak Ganda 16,00 bh -212 -3.399
15 Pemasangan Stop Kontak AC 2,00 bh -212 -425
16 Pemasangan AC split wall 2 PK (18.000 BTU) 2,00 unit -212 -425
17 Grounding (max 2 Ohm) 1,00 lot -212 -212
Sub Total I -3.612 -23.391.242