Sheet2_2

KOP LEMBAGA

(ALAMAT LENGKAP)

RENCANA ANGGARAN BIAYA


PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI : BANTUAN KEMENTRIAN KETENAGA KERJAAN RI
KEJURUAN : ........................ (GRUP B)
TAHUN ANGGARAN : 2023

HARGA
JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN
HARGA (Rp.)
(Rp.)
1 2,00 4,00 5,00 6,00
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1,00 unit -47 -47
2 Pek. Laporan & Dokumentasi 1,00 ls -47 -47
Sub Total A -95 -95
B PEKERJAAN PFONDASI DAN TANAH
1 Pek. Galian Tanah Pondasi 79,84 m3 49.953 3.988.216
2 Pek. Urug Tanah Kemabali 26,61 m3 24.953 663.989
3 Pek. Urug Tanah Peniggian Pell Lantai (1 -10 cm) 22,40 m3 -47 -1.062
4 Pek. Pasir Urug
- Bawah Fondasi 7,79 m3 29.953 233.331
- Bawah Lantai 11,20 m3 29.953 335.469
5 Pek. Findasi Tepok P1 (90 x 90 x 20)
- Beton K-225 2,59 m3 64.953 168.227
- Pembesian 639,36 kg 10.453 6.682.977
- Bekisting 11,52 m2 39.953 460.254
6 Pek. Fondasi Batu Belah P2 27,51 m3 24.953 686.446
7 Pek. Fondasi Tapak P3 (50 x 50 x 20)
- Beton K-255 0,10 m3 64.953 6.495
- Pembersian 26,64 kg 10.453 278.457
- Bekisting 0,80 m2 39.953 31.962
8 Pek. Sloof Beton S1 (15/30)
- Beton K-255 4,14 m3 64.953 268.904
- Pembesian 752,64 kg 10.453 7.867.048
- Bekisting 55,26 m2 39.953 2.207.781
9 Pek. Sloof Beton S2 (15/25)
- Beton K-255 0,26 m3 64.953 16.888
- Pembesian 53,42 kg 10.453 558.378
- Bekisting 3,40 m2 39.953 135.839
Sub Total B 621.147 24.589.600
C PEKERJAAN STRUKTURAL
C.1 STRUKTUR BETON
1 Pek. Kolam Beton K1 (25/25) T.1,35 m
- Beton K-255 0,17 m3 64.953 11.042
- Pembesian 27,71 kg 10.453 289.642
- Bekisting 2,70 m2 39.953 107.872
2 Pek. Kolam Beton K2 (25/25) T.4,93 m
- Beton K-255 1,85 m3 64.953 120.162
- Pembesian 303,61 kg 10.453 3.173.515
- Bekisting 29,58 m2 59.953 1.773.398
3 Pek. Kolam Beton K3 (25/25) T.4,58 m
- Beton K-255 0,57 m3 64.953 37.023
- Pembesian 94,02 kg 10.453 982.754
- Bekisting 9,16 m2 59.953 549.166

Page 1
Sheet2_2
4 Pek. Kolam Beton K4 (25/25) T.4,08 m
- Beton K-255 0,51 m3 64.953 33.126
- Pembesian 83,86 kg 10.453 876.555
- Bekisting 8,17 m2 59.953 489.813
5 Pek. Kolam Beton K5 (25/25) T.3,5 m
- Beton K-255 1,31 m3 64.953 85.088
- Pembesian 215,54 kg 10.453 2.252.954
- Bekisting 21,00 m2 44.953 944.005
6 Pek. Kolam Beton K1 (25/25) T.90 cm
- Beton K-255 1,01 m3 64.953 65.602
- Pembesian 166,28 kg 10.453 1.738.059
- Bekisting 16,20 m2 39.953 647.232
7 Pek. Kolam Praktis K{ (11/11)
- Beton K-175 0,51 m3 64.953 33.126
- Pembesian 341,04 kg 10.453 3.564.756
- Bekisting 18,48 m2 39.953 738.324
8 Pek. Kolam Beton B1, B2 (20/30)
- Beton K-255 2,88 m3 64.953 187.064
- Pembesian 322,18 kg 10.453 3.367.620
- Bekisting 28,40 m2 59.953 1.702.654
9 Pek. Kolam Balok Lintel BL (12/15). RB (12/15)
- Beton K-175 1,65 m3 59.953 98.922
- Pembesian 384,73 kg 10.453 4.021.431
- Bekisting 38,60 m2 39.953 1.542.171
10 Pek. Ramp Beton T = 10 cm
- Beton K-175 0,46 m3 59.953 27.578
- Pembesian 33,07 kg 10.453 345.668
- Bekisting 0,66 m2 39.953 26.369
11 Pek. Balok B3 dan Balokl Sopi-Sopi (15/20)
- Beton K-175 1,02 m3 59.953 61.152
- Pembesian 195,98 kg 10.453 2.048.501
- Bekisting 18,70 m2 59.953 1.121.114
12 Pek. Plat Beton Topi-Topi (10/55)
- Beton K-255 0,62 m3 59.953 37.171
- Pembesian 83,33 kg 10.453 871.016
- Bekisting 7,39 m2 39.953 295.250
13 Pek. Kolam pipa besi 3”
- Pipa besi 18,70 m1 54.953 1.027.614
- Ankur Ø 12mm 16,00 bh 49.953 799.242
- Baut 12 m 16,00 bh 29.953 479.242
- Base plate 6 mm uk. 25 x 25 cm 5,89 kg 49.953 294.221
- Plate 6 mm uk. 7,5 x 7,5 cm dudukan rangka atap 1,06 kg 59.953 63.550
C.2 PEKERJAAN ATAP
Rangka Atap
1 L 40.40.4 320,04 kg -47 -15.168
2 2 X L 50,50,5 985,50 kg -47 -46.708
3 Kuda Kuda 2 x C 100.50.20.2,3 34,44 kg -47 -1.632
4 Gording C 100.50.20.2,3 811,80 kg -47 -38.476
5 L 50,50,5 dudukan gording 41,45 kg -47 -1.965
6 Trekstang Ø 12 94,25 kg -47 -4.467
7 Ikat angin Ø 16 187,70 kg -47 -8.896
8 Pelat sampin g T 10 mm 339,12 kg -47 -16.073
9 Angker Ø 16 x 300 mm 64,00 bh -47 -3.033
10 Bout M12 x 30 mm 608,00 bh -47 -28.816
11 Cat Sincromat Rangkas baja 101,18 m2 -47 -4.795
Penutup
1 Atap Spandek t = 0,35 mm 285,12 m2 -47 -13.513
2 Pasang Alumunium Foil, Glosuol, Roofmesh 140,00 m2 -47 -6.635

Page 2
Sheet2_2
3 Listplank GRC 82,00 m2 -47 -3.886
4 Non samping flashing plat 63,20 m1 -47 -2.995
Sub Total C 1.713.346 36.733.699
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Ranka Hollow 4/4; t = 0,35 128,80 m2 39.953 5.145.895
2 Plafond Calsiboard 4,5 mm + Rangka 73,92 m2 29.953 2.214.097
3 Lis Gipsum 5 cm 227,20 m2 19.953 4.533.232
Sub Total D 89.858 11.893.224
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 247,60 m2 19.953 4.940.265
2 Plester dan Acian 495,21 m2 69.953 34.641.229
3 Pasang Rolliang Bata 70,30 m2 19.953 1.402.668
4 Pekerjaan Lapis cor Beton t – 5 cm bawah lantai keramik 9,60 m2 79.953 767.545
5 Pekarjaan Meja Beton Wastafel t – 8 cm 0,10 m2 -47 -5
6 Pasangan Keramik Lantai 40/40 Polished 129,43 m2 54.953 7.112.516
7 Pasangan Keramik Lantai 30/30 UnPolished (rabat) 55,60 m2 49.953 2.777.365
8 Pasangan keramik Lantai 30/30 Unpolished 2,97 m2 49.953 148.359
9 Pasangan Kplint Keramik Lantai 40/10 polished 119,60 m2 34.953 4.180.332
10 Pasangan Keramik meja & dinding wastafel 30/30 Polished 3,99 m2 59.953 239.211
11 Pasangan Keramik Dinding 30/40 Polished 12,20 m2 59.953 731.422
12 Plestran & Acian Kaprot halus Kolam Entrace 5,12 m2 -47 -243
13 Pek. Logo & tulisan plat dinding fln. Cat duco 1,00 ls -47 -47
14 Pasang Prasasti granit 40/60 1,00 ls 99.953 99.953
15 Pasang Papan Nama (terpasang) 1,00 ls -47 -47
Sub Total E 599.289 57.040.522
F PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen/Pintu type P1 1,00 unt -47 -47
2 Kusen/Pintu type P2 4,00 unt -47 -190
3 Kusen/Pintu type P3 1,00 unt -47 -47
4 Kusen/Pintu type P4 (Spandrel) 1,00 unt -47 -47
5 Kusen/Pintu type J1 9,00 unt -47 -427
6 Kusen/Pintu type J3 4,00 unt -47 -190
7 Kusen/Pintu type BV 1,00 unt -47 -47
8 Tralis Jendela (Besi begel) 1,00 -47 -47
Sub Total F -379 -1.043
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 247,60 m2 -47 -11.735
2 Pek. Pengecatan Dinding Exterior 247,60 m2 -47 -11.735
3 Pek. Pengecatan Plafond 202,72 m2 -47 -9.608
4 Pek. Pengecatan Listplank 32,80 m2 -47 -1.555
Sub Total G -190 -34.633
H PEKERJAAN PLUMBING DAN SANITER
1 Instalasi Pipa PVC AW 4” 17,00 m2 -47 -806
2 Instalasi Pipa PVC AW 3” 12,00 m2 -47 -569
3 Instalasi Pipa PVC AW 2” 2,00 m2 -47 -95
4 Instalasi Pipa PVC AW 3/4” 20,00 m2 -47 -948
5 Instalasi Pipa PVC AW 1/2” 10,00 m2 -47 -474
6 Septicktank dan Rembesan 1,00 unt -47 -47
7 Pemasangan Closet Jongkok 1,00 bh -47 -47
8 Pemasangan Keran Air 2,00 bh -47 -95
9 Pemasangan Wastafel dan Keran 2,00 bh -47 -95
10 Floor Drain 1,00 bh -47 -47
11 Pemasangan Cermin Wastafel 100 x 160 1,00 unt -47 -47
Sub Total H -521 -3.270
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik (BP) dan UJL 55.000,00 VA -47 -2.606.751
2 Perijinan Sertifikat Layak Operasi (SLO) 55.000,00 VA -47 -2.606.751
3 Panel Listrik Indoor (30 x40 x 17) 1,00 unt -47 -47

Page 3
Sheet2_2
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2,00 m2 -47 -95
5 Pek. Instalasi Penerangan dan Power NYM 3 x 2,5 mm2 dan conduit 26,00 ttk -47 -1.232
6 Pek. Instalasi Power AC 2 PK (18000 BTU) 2,00 ttk -47 -95
7 Pemasangan Lampu TL LED 2 X 18 120 cm KAV V 13,00 bh -47 -616
8 Pemasangan Lampu Baret/Kap Baret LED 17 Watt Outbow 7,00 bh -47 -332
9 Pemasangan Lampu Sorot Outdoor 20 Watt 2,00 bh -47 -95
10 Pemasangan Lampu Philips Downlight LED 9 Watt Putih 4,00 bh -47 -190
11 Pemasangan Saklar Tunggal 4,00 bh -47 -190
12 Pemasangan Sakral Ganda 5,00 bh -47 -237
13 Pemasangan Stop Kibtak Single 8,00 bh -47 -379
14 Pemasangan Stop Kontak Ganda 16,00 bh -47 -758
15 Pemasangan Stop Kontak AC 2,00 bh -47 -95
16 Pemasangan AC split wall 2 PK (18.000 BTU) 2,00 unit -47 -95
17 Grounding (max 2 Ohm) 1,00 lot -47 -47
Sub Total I -806 -5.218.004
TOTAL 120.907,24 3.022.407 125.000.000

Page 4