Professional Documents
Culture Documents
SentryWellheadSystems 1691162716794
SentryWellheadSystems 1691162716794
DRILLING SYSTEMS
(HTTPS://SENTRYWELLHEAD.C
SYSTEMS/)
CONVENTIONAL
SYSTEMS
(HTTPS://SENTRYWELLHEAD
SYSTEMS/)
CASING HEADS
(HTTPS://SENTRYWELLHE
HEADS/)
CASING SPOOLS
(HTTPS://SENTRYWELLHE
SPOOLS/)
CASING HANGERS
(HTTPS://SENTRYWELLHE
HANGERS/)
SECONDARY SEALS
(HTTPS://SENTRYWELLHE
SEALS/)
TUBING HEADS
(HTTPS://SENTRYWELLHE
HEADS/)
(HTTPS://SENTRYWELLHE
PLUGS-BOWL-
PROTECTORS/)
BOWL PROTECTORS
(HTTPS://SENTRYWELL
PROTECTORS/)
TEST PLUGS
(HTTPS://SENTRYWELL
PLUGS/)
LOCKDOWN SCREWS
(HTTPS://SENTRYWELLHE
SCREWS/)
SEAL TECHNOLOGY
(HTTPS://SENTRYWELLHE
TECHNOLOGY/)
ENGINEERED SYSTEMS
(HTTPS://SENTRYWELLHEAD
WELLHEAD-SYSTEMS/)
COMPLETION SYSTEMS
(HTTPS://SENTRYWELLHEAD.C
SYSTEMS/)
PRODUCTION SYSTEMS
(HTTPS://SENTRYWELLHEAD.C
SYSTEMS/)
Test Plugs
After a casing head or spool and Blow Out Preventers, (BOP), have been installed on a well a pressure integrity test for these items must be conducted. In order for the test to
take place, a test plug should be set in the casing head or spool.
• A BOP test plug can be installed by running it down through the BOP stack and landing it on the load shoulder in the head
• The test plug is usually run on a joint of drill pipe
• Once in place the hydraulic rams of the BOP can be closed on the pipe and a hydrostatic test performed
• This will insure the integrity of the well control equipment prior to the restart of drilling operations
BACK TO TOP
CORPORATE OFFICE