You are on page 1of 2

WEEKLY SAFETY INSPECTION REPORT

Date of Inspection 09-08-2023

PROJECT Proposed JHI MALL AT JUFFAIR

CONSULTANT Arab Architects

CONTRACTOR CINQO CONTRACTING WLL

CONSTRUCTION SITE

POSSIBLE HAZARD YES NO NOTES/ COMMENTS

Is there an adequate inventory of PPE available in the


workplace?

Are employees using required personal protective


equipment?

Is the Walkways free of sharp objects?

Are all threshold plates on all doors secure? No


protruding screws?

Housekeeping acceptable?

Emergency Exits visible clear?

Have fire extinguishers provided at Site?

Have all fire extinguishers been inspected within the


last year? Is the tag initialed and dated?

Is the employee lunchroom area


Acceptable?

Electrical – are all cords and wires in good


condition and out of the way?

Are supplies and other material stored in or on


shelves properly to avoid
Overloading and/or tipping?
Hazard board and signage up-to-date?

Signage displayed and legible?

Safety inductions for all on site?

Safety notice board placed at site?

Offices clean, adequate & good lighting?

Toilets – clean, washing water?

Clear, safe access to work areas?

Hoardings / fence and gates secure?


Loose materials secure from wind?

Fall Hazard at Lift shafts / stairs?

Fall Hazards Floor openings?

Fall Hazards Floor Edges?

Staff trained in tool use?

Scaffolding Erection Satisfactory?

Climbing Ladders Safe?

Inspected By Position Date Signature

HSE ENGINEER Muhammad Mehrose 09-08-2023

Tool Box Talk

You might also like