0% found this document useful (0 votes)
60 views67 pages

Load Calculation Excel Templet

Uploaded by

ismal siraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views67 pages

Load Calculation Excel Templet

Uploaded by

ismal siraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Grade Beam load analysis O

0.3 De. Beam


4.42 L, WALL Dimentiocn
4.42 L, WINDOW No of h= Quantity
similar
30.11 L, ALMUNIUM t=
4.62 L, SPAN ϒ 14
H 2.1 25.9896
1
1 wall load T 0.2
plastering 25.9896
2 Wall finishing painting ϒ 17
mozaic or wall H 2.1
tiles 9.46764
1
3 Beam dead load 1.44 T 0.06
9.46764
ϒ 25
H 1.13 0.49946
1
T 0.004
0.49946
ϒ 27
W 0.5 2.43891
1
T 0.006
2.43891
8.310738095

Grade Beam load analysis O


0.3 De. Beam
0 L, WALL Dimentiocn
No of
2.96 L, WINDOW similar h= Quantity
64.48 L, ALMUNIUM t=
3.36 L, SPAN ϒ 14
H 0 0
1
1 wall load T 0.2
plastering 0
2 Wall finishing painting ϒ 17
mozaic or wall
tiles H 0 0
1
3 Beam dead load 1.44 T 0.06
0
ϒ 25
H 2.93 0.86728
1
T 0.004
0.86728
ϒ 27
W 0.5 5.22288
1
5.22288
1
T 0.006
5.22288
1.812547619

Grade Beam load analysis ON


0.3 De. Beam
0.84 L, WALL Dimentiocn
No of
2.96 L, door similar h= Quantity
0 L- Almunium t=
3.15 L, SPAN ϒ 14
H 2.93 13.78272
2
1 wall load T 0.2
plastering 13.78272
2 Wall finishing painting ϒ 17
mozaic or wall
tiles H 2.93 2.510424
1
3 Beam dead load 1.44 T 0.06
2.510424
ϒ 6
H 2.93 2.60184
1
T 0.05
2.60184
ϒ 27
W 0.5 0
1
T 0.006
0
5.998407619

Grade Beam load analysis O


0.3 De. Beam
4.42 L, WALL Dimentiocn
No of
4.42 L, WINDOW similar h= Quantity
30.11 L, ALMUNIUM t=
4.62 L, SPAN ϒ 14
H 2.1 25.9896
1
1 wall load T 0.2
plastering 25.9896
2 Wall finishing painting ϒ 17
mozaic or wall
H 2.1 9.46764
tiles 1
3 Beam dead load 1.44 T 0.06
9.46764
ϒ 25
0.49946
1
H 1.13 0.49946
1
T 0.004
0.49946
ϒ 27
W 0.5 2.43891
1
T 0.006
2.43891
8.310738095

Grade Beam load analysis O


0.3 De. Beam
0 L, WALL Dimentiocn
No of
2.96 L, WINDOW similar h= Quantity
64.48 L, ALMUNIUM t=
3.36 L, SPAN ϒ 14
H 0 0
1
1 wall load T 0.2
plastering 0
2 Wall finishing painting ϒ 17
mozaic or wall
tiles H 0 0
1
3 Beam dead load 1.44 T 0.06
0
ϒ 25
H 2.93 0.86728
1
T 0.004
0.86728
ϒ 27
W 0.5 5.22288
1
T 0.006
5.22288
1.812547619

Grade Beam load analysis ON


0.3 De. Beam
0.84 L, WALL Dimentiocn
No of
2.96 L, door h= Quantity
similar
0 L- Almunium t=
3.15 L, SPAN ϒ 14
H 2.93 13.78272
2
1 wall load T 0.2
plastering 13.78272
2 Wall finishing
2 Wall finishing painting ϒ 17
mozaic or wall
H 2.93 2.510424
tiles 1
3 Beam dead load 1.44 T 0.06
2.510424
ϒ 6
H 2.93 2.60184
1
T 0.05
2.60184
ϒ 27
W 0.5 0
1
T 0.006
0
5.998407619

0.4 De. Beam


0.61 L, WALL
0.65 L, GLASS Grade Beam load analy
0 L, ALMUNIUM
4.75 L, SPAN 14
2.8 14.3472
3
0.2
around window HCB, wall load, 14.3472
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 5.22648
3
14 0.06
0.4 5.22648
2
1.5 25
0.2 2.4 0.624
4
3.36 KN 0.004
0.624
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
2
T Tickness in meter 0.006
L length meter 0
4.959511579

0.4 De. Beam


0.15 L, WALL
0.45 L, GLASS
Grade Beam load analy
0 L, ALMUNIUM
4.75 L, SPAN 14
2.646
3
2.8 2.646
3
0.15
around window HCB, wall load, 2.646
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 1.2852
3
14 ϒ 0.06
0.4 H 1.2852
4
1.1 L 25
0.2 T 2.4 0.864
8
4.928 KN 0.004
0.864
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
4
T Tickness in meter 0.006
L length meter 0
2.046989474

0.2 De. Beam


0.15 L, WALL
0.6 L, GLASS
Grade Beam load analysis
0 L, ALMUNIUM
2.35 L, SPAN 14
3 1.26
1
0.2
around window HCB, wall load, 8.4
17
TIMIZING ϒ/H/L/T Quantity (KN) 3 0.459
1
14 0.06
0.4 3.06
2
1.5 25
0.2 2.4 0.288
2
3.36 KN 0.004
0.288
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
1
T Tickness in meter 0.006
L length meter 0
11.46

0.3 De. Beam


0 L, WALL
3.6 L, GLASS
Grade Beam load analysis
Grade Beam load analysis
10.1 L, ALMUNIUM
4 L, SPAN 14
2.9 0
1
0.2
around window HCB, wall load, 0
17
TIMIZING ϒ/H/L/T Quantity (KN) 3 0
1
14 0.06
0 0
2
1.5 25
0.2 3 5.4
5
0 KN 0.004
5.4
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 2.04525
2.5
T Tickness in meter 0.006
L length meter 2.04525
1.8613125

ON AXIS 3 ALL VALUES ARE 0

0.3 De. Beam


1.46 L, WALL
2.28 L, GLASS Grade Beam load analysis ON
10.1 L, ALMUNIUM
4 L, SPAN 14
3 12.264
1
0.2
around window HCB, wall load, 12.264
17
TIMIZING ϒ/H/L/T Quantity (KN) 3 4.4676
1
14 0.06
0.661 4.4676
2
1.13 25
0.2 2.4 2.1888
4
4.182808 KN 0.004
2.1888
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 1.6362
2
1.6362
2
T Tickness in meter 0.006
L length meter 1.6362
6.184852

0.4 De. Beam


0.4 L, WALL
1.34 L, GLASS
Grade Beam load analysis
0 L, ALMUNIUM
4.75 L, SPAN 14
2.8 2.352
1
0.15
around window HCB, wall load, 2.352
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 1.1424
1
14 ϒ 0.06
0.4 H 1.1424
4
1.1 L 25
0.2 T 2.4 0.6432
2
4.928 KN 0.004
0.6432
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
2
T Tickness in meter 0.006
L length meter 0
1.908547368

0.4 De. Beam


0 L, WALL
2.9 L, GLASS Grade Beam load anal
0 L, ALMUNIUM
2.35 L, SPAN 14
2.8 0
1
0.15
around window HCB, wall load, 0
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0
1
14 0.06
0.4 0
2
1.5 25
0.2 2.4 0.696
1
3.36 KN 0.004
0.696
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
1
T Tickness in meter 0.006
L length meter 0
1.725957447

0.4 De. Beam


0 L, WALL
1 L, GLASS Grade Beam load analysis
0 L, ALMUNIUM
4.75 L, SPAN 14
2.8 0
1
0.2
around window HCB, wall load, 0
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0
1
14 0.06
0.4 0
2
1.5 25
0.2 2.4 1.2
5
3.36 KN 0.004
1.2
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
2.5
T Tickness in meter 0.006
L length meter 0
0.96

0.4 De. Beam


0 L, WALL
4.75 L, GLASS Grade Beam load analy
0 L, ALMUNIUM
4.75 L, SPAN 14
2.8 0
1
0.2
around window HCB, wall load, 0
17
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0
1
14 0.06
0.4 0
2
0 25
0.2 2.4 4.56
4
4.56
4
0 KN 0.004
4.56
ϒ Unit weight of HCB KN/M3 27
H Height in meter 0.5 0
2
T Tickness in meter 0.006
L length meter 0
0.96
e Beam load analysis ON AXIS 1and4 (A_B )
Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter

e Beam load analysis ON AXIS 1and4 (B_C )


Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
window almunium
M
KN/M
A_B
KN/M Total load affter

Beam load analysis ON AXIS 1and4 (Others )


Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
wooden door
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter

e Beam load analysis ON AXIS 1and4 (A_B )


Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
window, glass
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter

e Beam load analysis ON AXIS 1and4 (B_C )


Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter

Beam load analysis ON AXIS 1and4 (Others )


Discription
Unit
1. HCB or Wall load on grade beam

KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
wooden door
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter

am load analysis ON AXIS 4 (B_C)

KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
B_C
KN/M Total load affter DDT

eam load analysis ON AXIS 4(C_D)

KN/M3
On axis 4 between axis (B, C) thickness of HCB wall 20cm
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
C_D
KN/M Total load affter DDT

m load analysis ON AXIS 4(D_E) yiferu

KN/M3
M On axis 4 between axis (D, E) thickness of HCB wall 20cm
M 11.46
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
D_E
KN/M Total load affter DDT

m load analysis ON AXIS 4(E_F) yiferu


m load analysis ON AXIS 4(E_F) yiferu

KN/M3
M On axis 4 between axis (E_F)) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
E_F
KN/M Total load affter DDT

ALUES ARE 00000

d analysis ON AXIS 2(A_B&F_G) yiferu

KN/M3
M On axis 2 between axis (A_B) and (F_G) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
window almunium DDT
M
KN
A_B
KN/M Total load affter DDT

m load analysis ON AXIS 2 (B_C&E_F)

KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
B_C
KN/M Total load affter DDT

eam load analysis(2, C_D&D_E))

KN/M3
M On axis 4 between axis (D, E) thickness of HCB wall 20cm
M
KN CONCIDER
INTERMIDIAT
KN/M3 BEAM
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
C_D
KN/M Total load affter DDT

load analysis ON AXIS 1(A_B&F_G)

KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
D_E
KN/M Total load affter DDT

am load analysis ON AXIS 2(B_F)

KN/M3
M On axis 2 between axis (A_B) and (F_G) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
A_B
KN/M Total load affter DDT
TYPICAL BEAM 1ST FLOOR TO 4TH FLOOR
0.4 De. Beam
1.74 L, WALL
0.65 L, GLASS
Typical Beam load analysis ON AXIS 4 (A_B&B
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 10.2312 M On axis 4 between axis (A_B&B_C) thic
1 HCB wall 15cm
0.15 M
around window HCB, wall 10.2312 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 4.96944 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 4.96944 KN
2
1.5 L 25 KN/M3
0.2 T 2 0.26 M
2 window, glass DDT
6.72 KN 0.004 M
0.26 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
4.66961 KN/M Total load affter DDT

0.4 De. Beam


0.15 L, WALL
1.1 L, GLASS
Typical Beam load analysis ON AXIS 4 (C_D
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 2.646 M On axis 4 between axis (C_D) thicknes
3 wall 15cm
0.15 M
around window HCB, wall 2.646 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 1.2852 M Plastering HCB wall in both sides thicne
3
14 ϒ 0.06 M and its hight 2.8m
0.8 H 1.2852 KN
4
1.1 L 25 KN/M3
0.2 T 2 1.76 M
8 window, glass DDT
9.856 KN 0.004 M
1.76 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
4 window almunium DDT
T Tickness in meter 0.006 M
4 window almunium DDT

L length meter 0 KN
3.27309 KN/M Total load affter DDT

0.4 De. Beam


0.15 L, WALL
0.46 L, GLASS
Typical Beam load analysis ON AXIS 4 (D_E
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0.882 M On axis 4 between axis (D_E) thicknes
1 wall 15cm
0.15 M
around window HCB, wall 0.882 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0.4284 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 0.4284 KN
2
1.25 L 25 KN/M3
0.2 T 2 0.368 M
4 window, glass DDT
5.6 KN 0.004 M
0.368 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
1.53229 KN/M Total load affter DDT

0.4 De. Beam


0 L, WALL
0.77 L, GLASS
Typial Beam load analysis ON AXIS 4 (E_F&F
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0 M On axis 4 between axis (E_F) thickness
1 wall 15cm
0.15 M
around window HCB, wall 0 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 0 KN
2
4.75 L 25 KN/M3
0.2 T 2 0.77 M
5 window, glass DDT
21.28 KN 0.004 M
0.77 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2.5 window almunium DDT
0
2.5 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
4.64211 KN/M Total load affter DDT

Typical beam load analysis ON AXIS 3 ALL WALL LOAD 0.00


0.4 De. Beam
4.75 L, WALL
0 L, GLASS
Typical Beam load analysis ON AXIS 2 (A_B&B
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 27.93 M On axis 4 between axis (A_B&B_C) thic
1 HCB wall 15cm
0.15 M
around window HCB, wall 27.93 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 13.566 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 13.566 KN
2
0 L 25 KN/M3
0.2 T 2 0 M
2 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
8.736 KN/M Total load affter DDT

0.4 De. Beam


0 L, WALL
2 L, GLASS
Typical Beam load analysis ON AXIS 2 (C_D&D
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0 M On axis 4 between axis (C_D) thicknes
3 wall 15cm
0.15 M
around window HCB, wall 0 KN
load,
23 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0 M Plastering HCB wall in both sides thicne
3
14 ϒ 0.006 M and its hight 2.8m
0.8 H 0 KN
1
2 L 25 KN/M3
0.8
2 window, glass DDT
1

0.2 T 2 0.8 M
2 window, glass DDT
4.48 KN 0.004 M
0.8 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
1 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
1.11158 KN/M Total load affter DDT

0.4 De. Beam


0 L, WALL
0 L, GLASS
Typical Beam load analysis ON AXIS 2 (E_F&F
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0 M On axis 4 between axis (D_E) thicknes
1 wall 15cm
0.15 M
around window HCB, wall 0 KN
load,
23 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.006 M and its hight 2.8m
0.8 H 0 KN
2
0 L 25 KN/M3
0.2 T 2 0 M
4 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
0 KN/M Total load affter DDT

0.4 De. Beam


4.75 L, WALL
0 L, GLASS
Typical Beam load analysis ON AXIS 2 (A_B&B
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 27.93 M On axis 4 between axis (A_B&B_C) thic
1 HCB wall 15cm
0.15 M
around window HCB, wall 27.93 KN
load,
23 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 1.8354 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.006 M and its hight 2.8m
0.8 H 1.8354 KN
2
0 L 25 KN/M3
0
2 window, glass DDT
2

0.2 T 2 0 M
2 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
6.2664 KN/M Total load affter DDT

0.4 De. Beam


0 L, WALL
2 L, GLASS
Typical Beam load analysis ON AXIS 2 (C_D&D
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0 M On axis 4 between axis (C_D) thicknes
3 wall 15cm
0.15 M
around window HCB, wall 0 KN
load,
23 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0 M Plastering HCB wall in both sides thicne
3
14 ϒ 0.006 M and its hight 2.8m
0.8 H 0 KN
1
2 L 25 KN/M3
0.2 T 2 0.8 M
2 window, glass DDT
4.48 KN 0.004 M
0.8 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
1 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
1.11158 KN/M Total load affter DDT

0.4 De. Beam


0 L, WALL
0 L, GLASS
Typical Beam load analysis ON AXIS 2 (E_F&F
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 0 M On axis 4 between axis (D_E) thicknes
1 wall 15cm
0.15 M
around window HCB, wall 0 KN
load,
23 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 0 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.006 M and its hight 2.8m
0.8 H 0 KN
2
0 L 25 KN/M3
0.2 T 2 0 M
4 window, glass DDT
0
4 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
0 KN/M Total load affter DDT
H FLOOR
ON AXIS 4
s ON AXIS 4 (A_B&B_C) 1 wall load
plastering
2 Wall finishing painting
4 between axis (A_B&B_C) thickness of mozaic or
HCB wall 15cm wall tiles
3 Beam dead load
0.765
4.2
For stair beam 4.965
ng HCB wall in both sides thicness of 3cm
and its hight 2.8m
For Grad beam 8.310738095

For Typical beam 8.736


window, glass DDT
For Terace baem 7.8

For roof beam 1.248


window almunium DDT

Total load affter DDT


A_B

ysis ON AXIS 4 (C_D)

4 between axis (C_D) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT


window almunium DDT

Total load affter DDT


C_D

ysis ON AXIS 4 (D_E)

4 between axis (D_E) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT

Total load affter DDT


D_E

ON AXIS 4 (E_F&F_G)

4 between axis (E_F) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT


window almunium DDT

Total load affter DDT


E_F

WALL LOAD 0.00


ON AXIS 2
s ON AXIS 2 (A_B&B_C)

4 between axis (A_B&B_C) thickness of


HCB wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT

Total load affter DDT


A_B

D E F
s ON AXIS 2 (C_D&D_E)

4 between axis (C_D) thickness of HCB


wall 15cm INTERMIDIAT BEAM

ng HCB wall in both sides thicness of 3cm All load on each beam o
and its hight 2.8m pannel are the same

window, glass DDT


window, glass DDT

window almunium DDT

Total load affter DDT


C_D

ON AXIS 2 (E_F&F_G))

4 between axis (D_E) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT

Total load affter DDT


E-F

s ON AXIS 2 (A_B&B_C)

4 between axis (A_B&B_C) thickness of


HCB wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT


window, glass DDT

window almunium DDT

Total load affter DDT

ON AXIS 1 NOT CHECKED

s ON AXIS 2 (C_D&D_E)

4 between axis (C_D) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT

window almunium DDT

Total load affter DDT

ON AXIS 2 (E_F&F_G))

4 between axis (D_E) thickness of HCB


wall 15cm

ng HCB wall in both sides thicness of 3cm


and its hight 2.8m

window, glass DDT


window, glass DDT

window almunium DDT

Total load affter DDT


All load on each beam or
pannel are the same
0.4 De. Beam
4.75 L, WALL
0 L, GLASS
TOP TIE BEAM FLAT ROOF 1
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.5 24.9375 M Is consider only border beams means the parap
1 wall can be seeted Hp=2.5m
0.15 M
around window HCB, 24.9375 KN
wall load,
17 KN/M3
TIMIZING ϒ/H/L/T
Quantity (KN) 2.5 12.1125 M Plastering HCB wall in both sides thicness of 3c
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 12.1125 KN
2
0 L 25 KN/M3
0.2 T 2 0 M
4 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
7.8 KN/M Total load affter DDT

0.4 De. Beam


4.75 L, WALL
0 L, GLASS
TOP TIE BEAM FLAT ROOF 2
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
0.4 3.99 M Is consider only border beams means the parap
1 wall can be seeted Hp=0.4m
0.15 M
around window HCB, 3.99 KN
wall load,
17 KN/M3
TIMIZING ϒ/H/L/T
Quantity (KN) 0.4 1.938 M Plastering HCB wall in both sides thicness of 3c
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 1.938 KN
2
0 L 25 KN/M3
0.2 T 2 0 M
4 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
2 window almunium DDT

L length meter 0 KN
1.248 KN/M Total load affter DDT
1 wall load
OOF 1 plastering
Wall
2 painting
finishing
mozaic or wall
Beam dead tiles
rder beams means the parapet 3 load
be seeted Hp=2.5m

all in both sides thicness of 3cm


d its hight 2.8m

dow, glass DDT

w almunium DDT

l load affter DDT


E-F

OOF 2

rder beams means the parapet


be seeted Hp=0.4m

all in both sides thicness of 3cm


d its hight 2.8m

dow, glass DDT

w almunium DDT
w almunium DDT

l load affter DDT


E-F
STIAR LOAD CALULATION SELF WEIGHT OF LANDING

Widt 1.42
M
Length 2.75 M
Thick 0.16 M
1, LANDING
Steps give data from ϒ.unit.w 24
architectural drawing KN/M3

DL DL 3.84

2, FLIGHT
STIAR LOAD CALULATION
STAIR ONE (live load = 3kn/m2)
W 1.44 M
t 0.3 M
Steps give data from r 0.15 M
architectural drawing ϒ 24 KN/M3

SO first fined the volum of one single step. The volm of stair is
area multiplies by its width

M3
V=1/2(L*H)*W 0.0324
The volum of all 9 steps are 0.324 M3

Calculate force that applied on satiar slab


F=ϒ*V in KN 7.776 KN
Area of slab sloped length*width of stair
A=W*Lsloped slab 4.4064

1.7647059 KN/M2
the dead load of stair from steps = F/A
Finishing
Cement screened 3cm plastering t=0.03
TIMIZING ϒ/H/L/T Quantity (KN) TIMIZING ϒ/H/L/T Quantity (KN)
ϒ ϒ
24 17
A A
1 1
0.03 T 0.03 T
0.72 KN 0.51 KN
Ceramic tiles 4mm
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
22
Floor finishing load
A
1
0.004 T
0.088 KN
TOTAL DEAD LOAD 3.082706 KN/M2

STAIR TWO (live load = 3kn/m2)


W 1.4 M
L 0.3 M
Steps give data from H 0.16 M
architectural drawing ϒ 25 KN/M3

SO first fined the volum of one single step. The volm of stair is
area multiplies by its width

M3
V=1/2(L*H)*W 0.0336
The volum of all 9 steps are 0.3024 M3

Calculate force that applied on satiar slab


F=ϒ*V in KN 7.56 KN
Area of slab sloped length*width of stair
A=W*Lsloped slab 4.284

1.7647059 KN/M2
the dead load of stair from steps = F/A
cCement scr
Cement screened 3cm plastering t=0.03
TIMIZING ϒ/H/L/T Quantity (KN) TIMIZING ϒ/H/L/T Quantity (KN)
ϒ ϒ
24 17
A A
1 1
0.03 T 0.03 T
0.72 KN 0.51 KN
Ceramic tiles
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
22
Floor finishing load
A
1
0.004 T
0.088 KN
TOTAL DEAD LOAD 3.0827059 KN/M2
STIAR LOAD CALULATION SELF WEIGHT OF LANDING
W 1.42 M
L 2.75 M
Steps give data from T 0.16 M
architectural drawing ϒ 25 KN/M3

DL DL 4

LANDING LOAD CALCULATION stair 1


0 De. Beam
1.3 L, WALL typical slab pannel 5(Live load=3kn/m3 i
0 L, GLASS EBCS1 1995)
0 L, ALMUNIUM
Area of
3.85 floor 14 KN/M3
1.5 4.095 M
1 pannel 1 HCB
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 4.095 KN
ϒ 17 KN/M3
24 2.75 1.82325 M
A 1 Plastering of
1 0.03 M
0.03 T 1.82325 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
wind
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window
0.004 T 0.05 M
0.088 KN 0 KN
2.34520779 KN/M2 Total

LANDING LOAD CALCULATION stair 2


0 De. Beam
1.4 L, WALL typical slab pannel 5(Live load=3kn/m3 i
0 L, GLASS EBCS1 1995)
0 L, ALMUNIUM
Area of
5.74
floor 14 KN/M3
1.5 4.41 M
1 pannel 1 HCB
Cement screened 3cm 0.15 M
1 pannel 1 HCB

TIMIZING ϒ/H/L/T Quantity (KN) 4.41 KN


ϒ 24 KN/M3
24 4.1 4.1328 M Plastering HCB wall in bot
A 1
1 0.03 M
0.03 T 4.1328 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
wind
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window
0.004 T 0.05 M
0.088 KN 0 KN
2.29629268 KN/M2 Total
for hand calculation

1 Slab dead 3.84


2 steps self wieht 3.08270588235 ሁለት አይነት ሎድ ካልኩሌት እናደርጋ
1, for flight 0.069
slab palstering
3 finishing
painting
Flight tiels ceramic
landing self
1 weight

2, for slab palstering


landing
2 finishing
painting
Flight tiels
6.99170588

Tread =29cm
Its stiar width of 1.3m
lb
ir sa
riser= 16cm sta 0.29*9=2.61

0.16cm*10=1.6m
m
. 06
3
b=
sla
d
p ea
lo
Ls
1.318 KN/M2

Tread =29cm
Its stiar width of 1.3m
alb
riser= 16cm tair s 0.29*9=2.61
s

0.16cm*10=1.6m
6m
3.0
b=
sla
d
p ea
lo
Ls

1.318 KN/M2
TION stair 1
load=3kn/m3 is unde category c1
BCS1 1995)

pannel 1 HCB wall 15cm height 3.05m

Plastering of landind at bottom face

window, glass DDT

window almunium DDT

Total load affter DDT


plastering t=0.3
TIMIZING ϒ/H/L/TQuantity (KN)
TION stair 2 ϒ
17
A
load=3kn/m3 is unde category c1 1
BCS1 1995) 0.03 T
0.51 KN

pannel 1 HCB wall 15cm height 3.05m


pannel 1 HCB wall 15cm height 3.05m

ff 1.318
Plastering HCB wall in both sides thicness of 3cm and its hight pl 2.08360976
3.05m 5.78592 11.95992 2.08361
6.174

window, glass DDT

window almunium DDT

Total load affter DDT


ይነት ሎድ ካልኩሌት እናደርጋለን

0.29*9=2.61

m
. 06
3
b=
sla
ad
pe
lo
Ls
0.29*9=2.61

6m
3.0
b=
sla
ad
pe
lo
Ls
first to fourth floor
0.15 De. Slab
0 L, WALL typical slab pannel 1 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27.7 Area of floor 14 KN/M3
3.05 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3.05 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
27 KN/M3
22
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.384 1.384 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
3.35 L, WALL typical slab pannel 2(Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27.7 Area of floor 14 KN/M3
3.05 21.4568 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 21.4568 KN
ϒ 17 KN/M3
24 3.05 10.42185 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 10.42185 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
2 window, glass DDT

ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
2.53485 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
14.4 L, WALL typical slab pannel 3 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27.7 Area of floor 14 KN/M3
3.05 92.232 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 92.232 KN
ϒ 17 KN/M3
24 3.05 44.7984 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 44.7984 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
6.33095 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
6.6 L, WALL typical slab pannel 4 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
22.46 Area of floor 14 KN/M3
3.05 42.273 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 42.273 KN
ϒ 17 KN/M3
24 3.05 20.5326 M Plastering HCB wall in both sides thicness
A 1
1 and its hight 3.05m
24 20.5326 Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 20.5326 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
4.18033 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
1.26 L, WALL typical slab pannel 5(Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
15.14 Area of floor 14 KN/M3
3.05 8.0703 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 8.0703 KN
ϒ 17 KN/M3
24 3.05 3.91986 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 3.91986 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
2.17595 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
0.61 L, WALL typical slab pannel 6 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
19 Area of floor 14 KN/M3
3.05 3.90705 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 3.90705 KN
ϒ 17 KN/M3
24 3.05 1.89771 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 1.89771 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.68951 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
5.675 L, WALL typical slab pannel 7 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27 Area of floor 14 KN/M3
3.05 36.3484 M
1 pannel 7 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 36.3484 KN
ϒ 17 KN/M3
24 3.05 17.65493 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 17.65493 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
3.38412 KN/M2 Total load affter DDT

first to fourth floor


first to fourth floor
0.15 De. Slab
1.187 L, WALL typical slab pannel 8(Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27 Area of floor 14 KN/M3
3.05 7.60274 M
1 pannel 8 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 7.60274 KN
ϒ 17 KN/M3
24 3.05 3.692757 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 3.692757 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.80235 KN/M2 Total load affter DDT

first to fourth floor


0.15 De. Slab
4.75 L, WALL typical slab pannel 9 (Live load=3kn/m3 is un
0 L, GLASS category c1B EBCS1 1995)
0 L, ALMUNIUM
27 Area of floor 14 KN/M3
3.05 30.4238 M
1 pannel 9 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 30.4238 KN
ϒ 17 KN/M3
24 3.05 14.77725 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 14.77725 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0
2 window almunium DDT
22
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
3.05811 KN/M2 Total load affter DDT

first to fourth floor


0.2 De. Slab
1.92 L, WALL typical slab pannel 10 (Live load=4kn/m2 is un
0 L, GLASS category c1 EBCS1 1995) cantilaver
0 L, ALMUNIUM
3.78 Area of floor 14 KN/M3
3 16.128 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.2 M
TIMIZING ϒ/H/L/T Quantity (KN) 16.128 KN
ϒ 17 KN/M3
24 3 5.8752 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 5.8752 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
7.20495 KN/M2 Total load affter DDT

TERACE 1
0.2 De. Slab
0 L, WALL
0 L, GLASS
Flat roof (Live load 3KN/M2)
0 L, ALMUNIUM
3.78 Area of floor 14 KN/M3
3 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.2 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
1

0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.432 KN/M2 Total load affter DDT

Roof level
0.2 De. Slab
0 L, WALL
0 L, GLASS
Flat roof (Live load 0.5KN/M2)
0 L, ALMUNIUM
3.78 Area of floor 14 KN/M3
3 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.2 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.432 KN/M2 Total load affter DDT
3kn/m3 is unde PANNEL 1
995)
plastering t=0.3
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
B wall 15cm height 3.05m
17
A
1
0.03 T
all in both sides thicness of 3cm 0.51 KN
its hight 3.05m
ff 1.384
pl 0
Panel name PL
dow, glass DDT Panel classifies in
P1,P5,P6,P8 0.913
partion load not
P2,P9 1.867 support condition
P4 3.119

P7 2.231
w almunium DDT
P3 5.518
P10 6.37
l load affter DDT

3kn/m3 is unde PANNEL 2


995)

B wall 15cm height 3.05m

1.150852 pl
1.384 ff
all in both sides thicness of 3cm
its hight 3.05m p1 1.384
p2 2.5348519856
p3 6.3309458484
p4 4.1803312556
dow, glass DDT
p5 2.1759524439 Typical
dow, glass DDT
Typical
p6 1.6895136842
p7 3.3841222222
p8 1.8023515556
w almunium DDT
p9 3.0581111111 Pannel dependes on the same
p10 7.204952381 load and the same support
conition
l load affter DDT Terace 1.432
Roof2 1.432

3kn/m3 is unde PANNEL 3


995)

Pannel depends on the


B wall 15cm height 3.05m same load and support
condition

all in both sides thicness of 3cm


its hight 3.05m
4.946946 pl
1.384 ff

dow, glass DDT


3.3296750903
1.02
0.874
5.2236750903
w almunium DDT

l load affter DDT

3kn/m3 is unde PANNEL 4


995)

B wall 15cm height 3.05m

all in both sides thicness of 3cm 2.796331 pl


its hight 3.05m
all in both sides thicness of 3cm
its hight 3.05m 1.384 ff

1.02
0.874
dow, glass DDT
1.8821460374
3.7761460374
4.2861460374

w almunium DDT

l load affter DDT

3kn/m3 is unde PANNEL 5


995)
#NAME?

B wall 15cm height 3.05m

0.791952 pl
all in both sides thicness of 3cm 1.384 ff
its hight 3.05m

dow, glass DDT

w almunium DDT

l load affter DDT

3kn/m3 is unde PANNEL 6


995)
B wall 15cm height 3.05m

0.305514 pl
all in both sides thicness of 3cm 1.384 ff
its hight 3.05m

dow, glass DDT

w almunium DDT

l load affter DDT

=3kn/m3 is unde PANNEL 7


995)

B wall 15cm height 3.05m


2.000122 pl
1.384 ff

all in both sides thicness of 3cm


its hight 3.05m

dow, glass DDT

w almunium DDT

l load affter DDT


3kn/m3 is unde PANNEL 8
995)

B wall 15cm height 3.05m


0.418352 pl
1.384 ff

all in both sides thicness of 3cm


its hight 3.05m

dow, glass DDT

w almunium DDT

l load affter DDT

3kn/m3 is unde PANNEL 9


995)

B wall 15cm height 3.05m

1.674111 pl
1.384 ff
all in both sides thicness of 3cm
its hight 3.05m

dow, glass DDT

w almunium DDT
w almunium DDT

l load affter DDT

=4kn/m2 is unde PANNEL 10


cantilaver

B wall 15cm height 3.05m

all in both sides thicness of 3cm


its hight 3.05m

dow, glass DDT


1.384 ff
5.820952 pl

w almunium DDT

l load affter DDT

Terace level
N/M2)

0 pl
1.384 ff
B wall 15cm height 3.05m
3 LL

Roof covering bitumn t=0.002

all in both sides thicness of 3cm 24


its hight 3.05m 0.002
0.048
dow, glass DDT

w almunium DDT

l load affter DDT

flat roof
KN/M2)

0 pl
2.258 ff
B wall 15cm height 3.05m
0.5 LL

all in both sides thicness of 3cm


its hight 3.05m

dow, glass DDT

w almunium DDT

l load affter DDT


475.0000
475.0000 475.0000 475.0000 475.0000
260.0000

117.5000
15.0000
52.9663
92.5000 110.0000 125.0000 120.0000
110.0000

Ø25 Ø32 Ø32


Ø100 Ø100
co 287.3200
Ø25

P1
Ø25
149.9979
162.5449 162.5553

15.0000
22.5350
274.9750

40.0000 40.0000

P1
47.4650

P2
140.0350
410.0385

P5
189.1184

Ø20
P4
86.0126

20.5273

108.7500
19.9375
29.5482 23.9874

P3
+12.80 200.5704 61.4650

+12.80
204.4296

+3.20
260.0700

+3.20
170.0000

65.0000
208.7805
128.7195

61.7998

P1 P1
P1 P6
+12.80
+3.20 P1 P1 +12.80
+3.20
475.0350

118.7150

P1 P8
+12.80

P1 +12.80
+3.20
P7
567.5000

P1 +3.20
P9

P10 P10
80.0000

100.1125

91.8351

377.3400

FIRST to FOURTH FLOOR SN PLAN +3.20


SCALE :- 1:50
el dependes on the same
nd the same support
on

475.0000
475.0000 475.0000 475.0000 475.0000
260.0000

117.5000
15.0000
52.9663
92.5000 110.0000 125.0000 120.0000
110.0000

Ø25 Ø32 Ø32


Ø100 Ø100
co 287.3200

P1

Ø25

Ø25
149.9979
162.5449 162.5553

15.0000
22.5350
274.9750
40.0000 40.0000

P5 P1
47.4650

P2
140.0350
410.0385

189.1184

P4
86.0126

Ø20
20.5273

108.7500
19.9375
29.5482 23.9874

P3
+12.80 200.5704 61.4650
204.4296
+12.80
+3.20
260.0700

+3.20
170.0000

65.0000
208.7805
128.7195

61.7998

P6 P6
P7 P9
+12.80
+3.20 P8 P8 +12.80
+3.20
475.0350

118.7150

P12 P13
+12.80

P10 +12.80
+3.20
P11
567.5000

P12 +3.20
P14

P15 P15
80.0000

100.1125

91.8351

377.3400

FIRST to FOURTH FLOOR SN PLAN +3.20


SCALE :- 1:50
475.0000

P1

P1
+12.80
+3.20
475.0350

P9

100.1125
P10
91.8351

377.3400
475.0000 475.0000

287.3200

15.0000

4 P5 P1
61.4650

+12.80
+3.20
170.0000

65.0000
208.7805

61.7998

P6
P9
8 +12.80
+3.20
475.0350

118.7150

2 P13 P14

100.1125
P15
91.8351

377.3400
0.4

l 2.8 0.91 0.65


0.2 7.1344 7.1344 7.1344 5.096
7.84
14
HCB wall 0.2 14 0.8 4.48 kn/m
1.5 window
Glass 0.004 25 2 0.6 kn/m
27 5.08
4.587453
0.91
7.84 7.84 7.84

2.44 2.44

0.91 1.5 0.65 1.5 0.2