Load Calculation Excel Templet
Load Calculation Excel Templet
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
wooden door
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
window, glass
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
window, glass
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (A, B) and (B,C ) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.93m
KN
KN/M3
M
wooden door
M
KN/M
KN/M3
M
window almunium
M
KN/M
A_B
KN/M Total load affter
KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
B_C
KN/M Total load affter DDT
KN/M3
On axis 4 between axis (B, C) thickness of HCB wall 20cm
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
C_D
KN/M Total load affter DDT
KN/M3
M On axis 4 between axis (D, E) thickness of HCB wall 20cm
M 11.46
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
D_E
KN/M Total load affter DDT
KN/M3
M On axis 4 between axis (E_F)) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
E_F
KN/M Total load affter DDT
KN/M3
M On axis 2 between axis (A_B) and (F_G) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
window almunium DDT
M
KN
A_B
KN/M Total load affter DDT
KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
B_C
KN/M Total load affter DDT
KN/M3
M On axis 4 between axis (D, E) thickness of HCB wall 20cm
M
KN CONCIDER
INTERMIDIAT
KN/M3 BEAM
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
C_D
KN/M Total load affter DDT
KN/M3
M On axis 4 between axis (B, C) thickness of HCB wall 20cm
M
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
D_E
KN/M Total load affter DDT
KN/M3
M On axis 2 between axis (A_B) and (F_G) thickness of HCB
M wall 20cm
KN
KN/M3
M Plastering HCB wall in both sides thicness of 3cm and its
M hight 2.8m
KN
KN/M3
M
window, glass DDT
window, glass DDT
M
KN
KN/M3
M
window almunium DDT
M
KN
A_B
KN/M Total load affter DDT
TYPICAL BEAM 1ST FLOOR TO 4TH FLOOR
0.4 De. Beam
1.74 L, WALL
0.65 L, GLASS
Typical Beam load analysis ON AXIS 4 (A_B&B
0 L, ALMUNIUM
4.75 L, SPAN 14 KN/M3
2.8 10.2312 M On axis 4 between axis (A_B&B_C) thic
1 HCB wall 15cm
0.15 M
around window HCB, wall 10.2312 KN
load,
17 KN/M3
TIMIZING ϒ/H/L/T Quantity (KN) 2.8 4.96944 M Plastering HCB wall in both sides thicne
1
14 ϒ 0.06 M and its hight 2.8m
0.8 H 4.96944 KN
2
1.5 L 25 KN/M3
0.2 T 2 0.26 M
2 window, glass DDT
6.72 KN 0.004 M
0.26 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
4.66961 KN/M Total load affter DDT
L length meter 0 KN
3.27309 KN/M Total load affter DDT
0.2 T 2 0.8 M
2 window, glass DDT
4.48 KN 0.004 M
0.8 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
1 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
1.11158 KN/M Total load affter DDT
0.2 T 2 0 M
2 window, glass DDT
0 KN 0.004 M
0 KN
ϒ Unit weight of HCB KN/M3 27 KN/M3
H Height in meter 0.5 0 M
2 window almunium DDT
T Tickness in meter 0.006 M
L length meter 0 KN
6.2664 KN/M Total load affter DDT
ON AXIS 4 (E_F&F_G)
D E F
s ON AXIS 2 (C_D&D_E)
ng HCB wall in both sides thicness of 3cm All load on each beam o
and its hight 2.8m pannel are the same
ON AXIS 2 (E_F&F_G))
s ON AXIS 2 (A_B&B_C)
s ON AXIS 2 (C_D&D_E)
ON AXIS 2 (E_F&F_G))
L length meter 0 KN
1.248 KN/M Total load affter DDT
1 wall load
OOF 1 plastering
Wall
2 painting
finishing
mozaic or wall
Beam dead tiles
rder beams means the parapet 3 load
be seeted Hp=2.5m
w almunium DDT
OOF 2
w almunium DDT
w almunium DDT
Widt 1.42
M
Length 2.75 M
Thick 0.16 M
1, LANDING
Steps give data from ϒ.unit.w 24
architectural drawing KN/M3
DL DL 3.84
2, FLIGHT
STIAR LOAD CALULATION
STAIR ONE (live load = 3kn/m2)
W 1.44 M
t 0.3 M
Steps give data from r 0.15 M
architectural drawing ϒ 24 KN/M3
SO first fined the volum of one single step. The volm of stair is
area multiplies by its width
M3
V=1/2(L*H)*W 0.0324
The volum of all 9 steps are 0.324 M3
1.7647059 KN/M2
the dead load of stair from steps = F/A
Finishing
Cement screened 3cm plastering t=0.03
TIMIZING ϒ/H/L/T Quantity (KN) TIMIZING ϒ/H/L/T Quantity (KN)
ϒ ϒ
24 17
A A
1 1
0.03 T 0.03 T
0.72 KN 0.51 KN
Ceramic tiles 4mm
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
22
Floor finishing load
A
1
0.004 T
0.088 KN
TOTAL DEAD LOAD 3.082706 KN/M2
SO first fined the volum of one single step. The volm of stair is
area multiplies by its width
M3
V=1/2(L*H)*W 0.0336
The volum of all 9 steps are 0.3024 M3
1.7647059 KN/M2
the dead load of stair from steps = F/A
cCement scr
Cement screened 3cm plastering t=0.03
TIMIZING ϒ/H/L/T Quantity (KN) TIMIZING ϒ/H/L/T Quantity (KN)
ϒ ϒ
24 17
A A
1 1
0.03 T 0.03 T
0.72 KN 0.51 KN
Ceramic tiles
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
22
Floor finishing load
A
1
0.004 T
0.088 KN
TOTAL DEAD LOAD 3.0827059 KN/M2
STIAR LOAD CALULATION SELF WEIGHT OF LANDING
W 1.42 M
L 2.75 M
Steps give data from T 0.16 M
architectural drawing ϒ 25 KN/M3
DL DL 4
Tread =29cm
Its stiar width of 1.3m
lb
ir sa
riser= 16cm sta 0.29*9=2.61
0.16cm*10=1.6m
m
. 06
3
b=
sla
d
p ea
lo
Ls
1.318 KN/M2
Tread =29cm
Its stiar width of 1.3m
alb
riser= 16cm tair s 0.29*9=2.61
s
0.16cm*10=1.6m
6m
3.0
b=
sla
d
p ea
lo
Ls
1.318 KN/M2
TION stair 1
load=3kn/m3 is unde category c1
BCS1 1995)
ff 1.318
Plastering HCB wall in both sides thicness of 3cm and its hight pl 2.08360976
3.05m 5.78592 11.95992 2.08361
6.174
0.29*9=2.61
m
. 06
3
b=
sla
ad
pe
lo
Ls
0.29*9=2.61
6m
3.0
b=
sla
ad
pe
lo
Ls
first to fourth floor
0.15 De. Slab
0 L, WALL typical slab pannel 1 (Live load=3kn/m3 is un
0 L, GLASS category c1 EBCS1 1995)
0 L, ALMUNIUM
27.7 Area of floor 14 KN/M3
3.05 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.15 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3.05 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
27 KN/M3
22
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.384 1.384 KN/M2 Total load affter DDT
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
2.53485 KN/M2 Total load affter DDT
TERACE 1
0.2 De. Slab
0 L, WALL
0 L, GLASS
Flat roof (Live load 3KN/M2)
0 L, ALMUNIUM
3.78 Area of floor 14 KN/M3
3 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.2 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
1
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.432 KN/M2 Total load affter DDT
Roof level
0.2 De. Slab
0 L, WALL
0 L, GLASS
Flat roof (Live load 0.5KN/M2)
0 L, ALMUNIUM
3.78 Area of floor 14 KN/M3
3 0 M
1 pannel 1 HCB wall 15cm height 3.05m
Cement screened 3cm 0.2 M
TIMIZING ϒ/H/L/T Quantity (KN) 0 KN
ϒ 17 KN/M3
24 3 0 M Plastering HCB wall in both sides thicness
A 1
1 0.06 M and its hight 3.05m
0.03 T 0 KN
0.72 KN 25 KN/M3
ceramic tiles 7mm 2
2 0 M
window, glass DDT
TIMIZING ϒ/H/L/T Quantity (KN) 0.004 M
ϒ 0 KN
22 27 KN/M3
A
1 0.1 0 M
2 window almunium DDT
0.007 T 0.05 M
0.154 KN 0 KN
1.432 KN/M2 Total load affter DDT
3kn/m3 is unde PANNEL 1
995)
plastering t=0.3
TIMIZING ϒ/H/L/T Quantity (KN)
ϒ
B wall 15cm height 3.05m
17
A
1
0.03 T
all in both sides thicness of 3cm 0.51 KN
its hight 3.05m
ff 1.384
pl 0
Panel name PL
dow, glass DDT Panel classifies in
P1,P5,P6,P8 0.913
partion load not
P2,P9 1.867 support condition
P4 3.119
P7 2.231
w almunium DDT
P3 5.518
P10 6.37
l load affter DDT
1.150852 pl
1.384 ff
all in both sides thicness of 3cm
its hight 3.05m p1 1.384
p2 2.5348519856
p3 6.3309458484
p4 4.1803312556
dow, glass DDT
p5 2.1759524439 Typical
dow, glass DDT
Typical
p6 1.6895136842
p7 3.3841222222
p8 1.8023515556
w almunium DDT
p9 3.0581111111 Pannel dependes on the same
p10 7.204952381 load and the same support
conition
l load affter DDT Terace 1.432
Roof2 1.432
1.02
0.874
dow, glass DDT
1.8821460374
3.7761460374
4.2861460374
w almunium DDT
0.791952 pl
all in both sides thicness of 3cm 1.384 ff
its hight 3.05m
w almunium DDT
0.305514 pl
all in both sides thicness of 3cm 1.384 ff
its hight 3.05m
w almunium DDT
w almunium DDT
w almunium DDT
1.674111 pl
1.384 ff
all in both sides thicness of 3cm
its hight 3.05m
w almunium DDT
w almunium DDT
w almunium DDT
Terace level
N/M2)
0 pl
1.384 ff
B wall 15cm height 3.05m
3 LL
w almunium DDT
flat roof
KN/M2)
0 pl
2.258 ff
B wall 15cm height 3.05m
0.5 LL
w almunium DDT
117.5000
15.0000
52.9663
92.5000 110.0000 125.0000 120.0000
110.0000
P1
Ø25
149.9979
162.5449 162.5553
15.0000
22.5350
274.9750
40.0000 40.0000
P1
47.4650
P2
140.0350
410.0385
P5
189.1184
Ø20
P4
86.0126
20.5273
108.7500
19.9375
29.5482 23.9874
P3
+12.80 200.5704 61.4650
+12.80
204.4296
+3.20
260.0700
+3.20
170.0000
65.0000
208.7805
128.7195
61.7998
P1 P1
P1 P6
+12.80
+3.20 P1 P1 +12.80
+3.20
475.0350
118.7150
P1 P8
+12.80
P1 +12.80
+3.20
P7
567.5000
P1 +3.20
P9
P10 P10
80.0000
100.1125
91.8351
377.3400
475.0000
475.0000 475.0000 475.0000 475.0000
260.0000
117.5000
15.0000
52.9663
92.5000 110.0000 125.0000 120.0000
110.0000
P1
Ø25
Ø25
149.9979
162.5449 162.5553
15.0000
22.5350
274.9750
40.0000 40.0000
P5 P1
47.4650
P2
140.0350
410.0385
189.1184
P4
86.0126
Ø20
20.5273
108.7500
19.9375
29.5482 23.9874
P3
+12.80 200.5704 61.4650
204.4296
+12.80
+3.20
260.0700
+3.20
170.0000
65.0000
208.7805
128.7195
61.7998
P6 P6
P7 P9
+12.80
+3.20 P8 P8 +12.80
+3.20
475.0350
118.7150
P12 P13
+12.80
P10 +12.80
+3.20
P11
567.5000
P12 +3.20
P14
P15 P15
80.0000
100.1125
91.8351
377.3400
P1
P1
+12.80
+3.20
475.0350
P9
100.1125
P10
91.8351
377.3400
475.0000 475.0000
287.3200
15.0000
4 P5 P1
61.4650
+12.80
+3.20
170.0000
65.0000
208.7805
61.7998
P6
P9
8 +12.80
+3.20
475.0350
118.7150
2 P13 P14
100.1125
P15
91.8351
377.3400
0.4
2.44 2.44