Rekapan Pemeriksaan Penggunaan Apd Periode 22 Juli
Rekapan Pemeriksaan Penggunaan Apd Periode 22 Juli
7 6 5 8 8 5
PAKAI SEPATU KESELAMATAN/ SAFETY BOOT (Org)
PAKAI ROMPI KESELAMATAN/SAFETY VEST (Org) 8 8 8 8 8 8
HELM+SEPATU+ROMPI (Org)
8 8 8 8 8 8
PAKAI SEPATU KESELAMATAN/ SAFETY BOOT (Org)
PAKAI ROMPI KESELAMATAN/SAFETY VEST (Org) 11 11 11 11 12 12
0 0 0 0 0 0
HELM+SEPATU+ROMPI (Org)
0 0 0 0 0 0
TIDAK PAKAI APD SAMA SEKALI (Org)
3 3 3 3 12 13
PAKAI SEPATU KESELAMATAN/ SAFETY BOOT (Org)
PAKAI ROMPI KESELAMATAN/SAFETY VEST (Org) 3 3 3 3 12 12
0 0 0 0 0
HELM+SEPATU+ROMPI (Org)
3
TIDAK PAKAI APD SAMA SEKALI (Org)
REVOL E.RINTANG,ST
REKAPAN DATA HASIL INSPEKSI PENGGUNAAN APD PER MINGGU
PEJABAT PEMBUAT KOMITMEN : PPK 2.4 PROVINSI SULAWESI UTARA
PAKET PEKERJAAN : PENANGANAN LONGSORAN RUAS KAIYA - KOTAMOBAGU
KONTRAKTOR : PT. SENGGIGILANG
KONSULTAN PENGAWAS : PT.DIANTAMA REKANUSA,KSO
12 12 12 12 12 12
PAKAI SEPATU KESELAMATAN/ SAFETY BOOT (Org)
PAKAI ROMPI KESELAMATAN/SAFETY VEST (Org) 12 12 12 12 12 12
0 0 0 0 0 0
HELM+SEPATU+ROMPI (Org)
0 0 0 0 0 0
TIDAK PAKAI APD SAMA SEKALI (Org)
REVOL E.RINTANG,ST