REF NO – QUO/JUNE/2023/009 DATE – 08/06/2023

QUOATION
To,

The Owner
75 Sophia Road, Singapore 228156

Dear Sir/Madam,

With reference to your enquiry, we are extremely pleased to offer you with our best cost-
effective competitive proposal for your kind reference.

SL Description of Works Qty Unit Rate Amount


No. ($) ($)
Providing labour and tools to install engineered
wooden floor.

(Supply of wooden planks not included)


1 Providing labour and tools to install engineered 1288.25 sqft 1.10 $1,417.07
wooden floor.
1st Storey Floor Area = 1288.25 sqft

2 Providing labour and tools to install engineered 1244.26 sqft 1.10 $1,368.68
wooden floor.
2nd Storey Floor Area = 1244.26 sqft

3 Providing labour and tools to install engineered 1261.84 sqft 1.10 $1,388.02
wooden floor.
3rd Storey Floor Area = 1261.84 sqft

TOTAL AMOUNT $4,173.77

Add: GST @8% $333.90

GRAND TOTAL AMOUNT $4,507.67

Amount in words: (Singapore Dollars Four Thousand Five Hundred Seven and Sixty Seven Cents only)
Terms & Conditions:

1. The quote includes Workmen's Injury Compensation and workmanship warranty.


2. 50% of the quoted amount is to be paid before work commencement, and the balance 50%
amount is to be paid after completion of the work.
3. We will exercise due care to your property & furniture while carrying out the works.
4. Work delivery may delay due to unforeseen reasons beyond our control. Such delays, if any,
will be communicated during work delivery.
5. All Payments to be only made via online method Via Paynow UEN or Cheque.
6. The above price is not inclusive of any permit fees or other types of third-party approval fees.

Thanks & Regards.

(This is a computer-generated document. No signature is required)