WEEK THREE
Motor Grades
Mo
Hou
strug
runa
of livi
forced
their b
to sque
addition
that had
frozen
High Cou
which
nto fo
mmed
er ap
ges y
1 NO
4. Labourers
40 Men
20 Women
Total -60 NO
5. Clerical Staff
WEEK ONE
Road Sign Board - printing and fitting at both ends of the Road
Site Fencing
New taxes is gh
of Re
Construction of Sanitation Block
Site Clearance
DAT
MA
AD
CULUM VITA
WEEK TWO
2. Culvet Cleaning
> Mechanical and Labour based (Use of Plant Machines and Labour based - Back Hoe Loader and hand
Labour Spades and Jembes)
4. Free hauling of gravel to carriage way deposited in 5 cubic meter bulks @ 6 meters intervals
WEEK THREE
Motor Grades
M
Back Hoe Loader
and
vel
ent