WEEK THREE

1. Carriage Way grading.

Cutting of the Ditches

> Cutting of the Road Slopes

Setting of the Mitre drains

2. Spreading of Gravel both mechanical and Labour based

Motor Grades

Back Hoe Loader

Labour based use of Rakes and Spades

3. Watering of the Road Surface with a Motor Water Boozer

4. Compaction and Levelling of the Carriage way.

> Compact Roller


Motor Grader

Mo

Hou

strug

runa

of livi

forced

their b

to sque

addition

that had

frozen
High Cou

which

nto fo

mmed

er ap

ges y

1 NO

(Bank Men 4 NO)

4. Labourers

40 Men

20 Women

> General Clerk-1 NO


Stores/ Supplies Clerk-2 NO

Total -60 NO

5. Clerical Staff

TIME FLAME/WORK PLAN

WEEK ONE

Road Sign Board - printing and fitting at both ends of the Road

Organisaton for the permit and payment of:

> Local Authority CHARGES AND PAYMENTS

Site Rent Hire

Site Fencing

> Construction of Site Huts

New taxes is gh

of Re
Construction of Sanitation Block

Site Clearance

Transportation of Plant Machines to the Site

Quarry Site Investigation

DAT

MA

AD

CULUM VITA

WEEK TWO

1. Light Bush clearing

> Mechanical methods (Tractor and Moore)

Labour base Clearing (Pangas and Slashers)

2. Culvet Cleaning
> Mechanical and Labour based (Use of Plant Machines and Labour based - Back Hoe Loader and hand
Labour Spades and Jembes)

> Light Grading (Use of Motor Graders - 2 NO)

3. Gravel Hauling to Contractors Site and material grading to Engineers-specification.

4. Free hauling of gravel to carriage way deposited in 5 cubic meter bulks @ 6 meters intervals

WEEK THREE

1. Carriage Way grading.

Cutting of the Ditches

Cutting of the Road Slopes

> Setting of the Mitre drains

2. Spreading of Gravel both mechanical and Labour based

Motor Grades

M
Back Hoe Loader

> Labour based use of Rakes and Spades

and

vel

ent

3. Watering of the Road Surface with a Motor Water Boozer

4. Compaction and Levelling of the Carriageway.

> Compact Roller

Motor Grader