2022 01 19 - B Certificate Requirements New
2022 01 19 - B Certificate Requirements New
Portion 1 and remainder of ERF 552 La Mercy Lagoon DR LA MERCY RES PRV DV0402 91.3 6 85.3
COM0001/06/2018/N
Creation of portion 1 of ERF 80 Ottawa and remainder of ERF 80 16 School RD KATZKOP PRV DV0373 148.1 84 64.1
Ottawa
COM 005/06/2015 Creation of proposed portions 4-20 of ERF 3481, Durban North - 90 Old 90 Old North Coast Road EFFINGHAM LL Z16 115.175 40 75.18
North Coast Road
guarantee
COM0001/06/2016N (i) Water Reticulation for iZinga Estate Phase 2D Portion 2-6 of erf: 3465 Herrwood Drive/Wager Ave Umhlanga Reservoir
Creation of portion 430-434 and the remainder of portion 77 (of 19) of 156 Buffels drive 220 172 48 done
SUB 0002/11/2018N(i) the farm Roodkrans no. 828 Redclife 1 ET
Subdivion of remainder of ERF 52 OTTAWA to form proposed portion 66.5 46 20.5 done
SUB 0001/03/2020/N 4,5 and remainder of erf 52 Ottawa situated at 7 Gazzard road, Ottawa. 7 Gazzard Road KATZKOP RES
Creation of portions 759-767 of remainder of portion 131 (of 14) of the 132 70 62 done
SUB 0002/12/2019N(i) far Riet Rivier no.842 61520 Street TRENANCE 1 RES
The Syubdivision of the remainder of ERF 86 Kenville to form proposed 121.421 68 53.421 done
SUB 001/12/2019C portions 2 and remainder of ERF Avoca Located at 100 Crown Road 100 Crown Road EFFINGHAM RES
Description
Address ZONE Res TWL (m) FL (m) Pipe MSL (m) PRV Head (m) Checks Prenisha Status Received Instructed Comments
Prenisha to Issue
Vol: 6 110 ST
27 200 mPVC
18
Confirm
Portion 15 59 Old Main Road KATZKOP RES 148.107 144.54 52 67 71.107
Demand/pipe
54 PP DV0373
Confirm
Portion 14 59 Old Main Road KATZKOP RES 148.107 144.54 48 67 75.107 Demand/pipe
54 PP DV0373
75mPVC DV5354
Mount Edgecombe 9/2/2022