Volume = P x L x T
= 110.00 x 0.80 x 0.70
= 61.60 m3
Vol I = P x L x T
= 110.00 x 0.20 x 0.50
= 11.00 m 3
I II
Vol II = P x L x T 0.50
= 110.00 x 0.20 x 0.50
= 11.00 m3
Vol III = P x L x T 0.20
= 110.00 x 0.80 x 0.20 III
= 17.60 m3
Total volume = 39.60 m3 0.20 0.40 0.20
HARGA SATUAN
NO URAIAN VOLUME SATUAN
(Rp.)
I BAHAN
1 Batu belah 48.00 m3 222,500
2 Pasir pasang 21.00 m3 305,000
3 Semen 40 kg/sak 161.00 sak 65,500
4
5
6
7
8
9
10
11
SUB TOTAL 1
II ALAT
1 Papan Proyek 1 buah 150,000
2 Ember 4 buah 13,500
3 Benang 1 buah 5,500
4
5
SUB TOTAL 2
III UPAH
1 Pekerja 106 HOK 85,000
2 Tukang 30 HOK 100,000
3 Kepala Tukang HOK 100,000
4 Mandor HOK 120,000
SUB TOTAL 3
IV OPERASIONAL TPK
1 Operasional TPK 1 paket 100,000
2 Pelaporan 1 paket 50,000
SUB TOTAL 4
JUMLAH TOTAL ( Rp. )
Disetujui, Telah Diverifikasi
Kepala Desa Mekarsari PDTI
ANGUNAN DESA
angunan Drainase Jalan
n Purwosari RT 01 RW 03
JUMLAH (Rp.)
10,680,000
6,405,000
10,545,500
-
-
-
-
-
-
-
-
27,630,500
150,000
54,000
5,500
-
-
209,500
9,010,000
3,000,000
-
-
12,010,000
100,000
50,000
-
150,000
40,000,000
Mekarsari, 30 Desember 2022
Pelaksana Kegiatan
MAMAN SUDIAMAN
HASIL SURVEI HARGA BAHAN DAN ALAT
TAHUN ANGGARAN 2023
Mengetahui, Toko/Suplier
Kepala Desa Mekarsari TB. INDO BETON
Mengetahui, Toko/Suplier
Kepala Desa Mekarsari MK. AMANAH
Mengetahui, Toko/Suplier
Kepala Desa Mekarsari TB. MAMAN
AAN ANDTRES SATRIAJI, S.IP H. MAMAN
Mengetahui,
Pj. Kepala Desa Mekarsari
MAMAN SUDIAMAN
N ALAT
MAMAN SUDIAMAN
N ALAT
N ALAT
MAMAN SUDIAMAN