You are on page 1of 27

Image from Google

LTS No. 033040 (Phase 1)


LTS No. 033085 (Phase 2)
LTS No. 033084 (Phase 3)
Vicinity Map
Infrastructure Updates

CALAX
CAVITE-LAGUNA EXPRESSWAY

Image from Google (Not Actual Photo For Briefing Purposes only) Image from Google (Not Actual Photo For Briefing Purposes only)

LRT-1 extension going in and out of Cavite being The Cavite-Laguna Expressway (CALAX) a 4-lane,
under way and is expected to be operational by 44.63 km closed-system tolled expressway
early 2021 connecting CAVITEX and SLEX.

UPDATE: As of Q1 2018, LRT1 Extension shall UPDATE: Construction started by 2Q 2017 and
commence by mid-2018, and shall still be planned completion by 2020**
completed by 2021*
*https://ppp.gov.ph/?in_the_news=lrt-1-extension-works-set-to-start-by-mid-year
**http://www.dpwh.gov.ph/dpwh/PPP/projs/cala
Market

Image from Google

Student Market Alternative Market


• 20,000+ Student population • Faculty Members
• Approximated 2% growth rate per year • Doctors and nursing staff
• Area of Origin Cavite, Laguna, • Parents visiting their Children
Batangas • Conferences and seminars
• Alumni gatherings and other events
Masterplan

Land Area 16,174 sq.m


No. of Floors 19 storeys (excluding B1)
No. of Units 3,254 (total for all towers)
No. of Parking ±489 (to be shared by all towers)
Retail Ground Floor
Amenity Floor 2nd Floor (shared by all towers)
Turnover Tower 1 : Starting October 31, 2021
Tower 2 : Starting June 30, 2022
Tower 3 : Starting December 31, 2022

Type Size (sq.m) Tower 1 Tower 2 Tower 3


Studio ±18.98 – 1,006 1,021 1,091
±26.53 [95%] [95%] [97%]

2 BR ±31.57 – 51 51 34
±35.23 [5%] [5%] [ 3%]

Total 1,057 1,072 1,125

Building Façade, Artist’s Perspective


Masterplan

TOWER 3
TOWER 1
TOWER 2 N

COMMERCIAL
STRIP
Tower Zoning

3F – 22F – Residential Units (no 4F, 13F, 14F)

2F – Amenities and Residential Units

GF – Commercial strip, Comm/Resi Parking

Building Façade, Artist’s Perspective B1 – Residential Parking


Project Amenities

1
Gov. D. Mangubat Ave.

4
4
7
4
4 2
3

6 4 5

1 – Study Areas (Phase I) 5 – Gym (Phase 2)


2 – Swimming Pool (Phase I) 6 – Function Room (Phase 3)
3 – Kiddie Pool (Phase I) 7 – Covered Porch/Lounge (Phase 3)
4 – Multi-purpose lawns (Phase I)
N
Tower 1 Lobby (Phase 1)

Artist’s Perspective
Study Area (Phase 1)

Artist’s Perspective
Swimming Pool (Phase 1)

Artist’s Perspective
Fitness Gym (Phase 2)

Artist’s Perspective
Function Room (Phase 3)

Artist’s Perspective
Covered Porch (Phase 3)

Artist’s Perspective
Tower 3 Floor Plans
Typical Unit Layout

N
StandardDeliverables
Standard Deliverables

• Floor tiles in all areas of the unit


• Toilet and bath with painted plain cement
finish and tiles on walls (1.50m high tiles
in shower area and one layer of tiles in
toilet area)
• Kitchen counter-top with under-the-
counter cabinets
• Water closet, lavatory, soap holder, tissue
holder, shower head and faucet in the
toilet & bath
• Provision of tapping point for water
heater in the shower area only
• Aluminum-framed windows
Dressed – Up Studio Unit

Artist’s Perspective

Artist’s Perspective
Dressed – Up Combined Studio Units

Artist’s Perspective Artist’s Perspective

Artist’s Perspective Artist’s Perspective


Building Features

5 elevators Allocated emergency load for residential units in


Centralized garbage room case of power outage
Mail Room Wi-Fi ready in Study Areas
Fire sprinkler System CCTV cameras in common areas
Automatic Fire Detection & Alarm System (FDAS) 24 hour security and maintenance
Stand-by back-up automatic generator system Centralized STP and cistern
for common areas
2 Fire exits every residential floor

N
Q1 2019 Payment Terms (Tower 1)

DISCOUNT
PAYMENT SCHEME PARTICULARS PARKING
RESIDENTIAL

CASH2 100% Spot Cash in 30 Days 10.0% 4.0%


DEFERRED2 100% Payable in 31 months 2.0% -
10% Spot / 90% in 31 months 2.0% -
SPOT DP 20% Spot / 80% in 31 months 4.0% -
50% Spot / 50% in 31 months 5.0% -
15% in 31 months/ 85% through cash or bank - -
SPREAD DP
20% in 31 months / 80% through cash or bank - -
10% Spot / 10% in 30 months / 80% through cash or bank 0.5% -
EASY PAYMENT
20% Spot / 10% in 30 months / 70% through cash or bank 1.0% -

1. Reservation Fee
a. Residential Units - P25,000.00
b. Parking Unit - P10,000.00
2. Cash and Deferred terms shall be subject to a retention amount of P50,000.00 due on the turnover month. For Deferred
terms, computation shall be as follows:
= (100% TAP – Retention Amount) / X months
3. Effectivity date is after December 2018 Sales cut-off to March 2019 sales cut-off.
4. Make checks payable to VANCOUVER LANDS, INC.
Q1 2019 Payment Terms (Tower 2)

DISCOUNT
PAYMENT SCHEME PARTICULARS PARKING
RESIDENTIAL

CASH2 100% Spot Cash in 30 Days 10.0% 4.0%


DEFERRED2 100% Payable in 39 months 2.0% -
10% Spot / 90% in 39 months 2.0% -
SPOT DP 20% Spot / 80% in 39 months 4.0% -
50% Spot / 50% in 39 months 5.0% -
15% in 39 months/ 85% through cash or bank - -
SPREAD DP
20% in 39 months / 80% through cash or bank - -
10% Spot / 10% in 38 months / 80% through cash or bank 0.5% -
EASY PAYMENT
20% Spot / 10% in 38 months / 70% through cash or bank 1.0% -

1. Reservation Fee
a. Residential Units - P25,000.00
b. Parking Unit - P10,000.00
2. Cash and Deferred terms shall be subject to a retention amount of P50,000.00 due on the turnover month. For Deferred
terms, computation shall be as follows:
= (100% TAP – Retention Amount) / X months
3. Effectivity date is after December 2018 Sales cut-off to March 2019 sales cut-off.
4. Make checks payable to VANCOUVER LANDS, INC.
Q1 2019 Payment Terms (Tower 3)

DISCOUNT
PAYMENT SCHEME PARTICULARS PARKING
RESIDENTIAL

CASH2 100% Spot Cash in 30 Days 10.0% 4.0%


DEFERRED2 100% Payable in 44 months 2.0% -
10% Spot / 90% in 44 months 2.0% -
SPOT DP 20% Spot / 80% in 44 months 4.0% -
50% Spot / 50% in 44 months 5.0% -
15% in 44 months/ 85% through cash or bank - -
SPREAD DP
20% in 44 months / 80% through cash or bank - -
10% Spot / 10% in 43 months / 80% through cash or bank 0.5% -
EASY PAYMENT
20% Spot / 10% in 43 months / 70% through cash or bank 1.0% -

1. Reservation Fee
a. Residential Units - P25,000.00
b. Parking Unit - P10,000.00
2. Cash and Deferred terms shall be subject to a retention amount of P50,000.00 due on the turnover month. For Deferred
terms, computation shall be as follows:
= (100% TAP – Retention Amount) / X months
3. Effectivity date is after December 2018 Sales cut-off to March 2019 sales cut-off.
4. Make checks payable to VANCOUVER LANDS, INC.
Happy Selling!!! 

You might also like