You are on page 1of 39

CUADRO COMPA

MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA CON UN SISTEMA DE RIEGO TECNIFICADO E


Presupues
COMUNIDAD CAMPESINA DE HUAMANCHARPA DEL DISTRITO DE SANTIAGO – PROVINCIA DE CUSCO –
to
CUSCO.

PIP Viable (A) PRESUPUESTO EXP. TEC ORIGINAL


ITEM UND

Descripcion Metrado APU Parcial

01 INFRAESTRUCTURA DE RIEGO 540,337.90


01.01 OBRAS PROVISIONALES 7,697.94
01.01.01 MOVILIZACION Y DESMOVILIZACION glb 2.00 750.00 1,500.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 2.00 348.97 697.94
01.01.03 OFICINAS mes 5.00 600.00 3,000.00
01.01.04 ALMACEN DE OBRA mes 5.00 500.00 2,500.00
01.01.05 CONSTRUCCION DE LETRINA DOMIC und
01.01.06 CONSTRUCCION DE ALMACEN DE O m2
01.02 OBRAS PRELIMINARES 6,517.23
01.02.01 TRAZO, NIVELACION Y REPLANTEO m 5,833.99 0.86 5,017.23
01.02.02 TRANSPORTE DE MATERIALES A OBR glb 2.00 750.00 1,500.00
01.02.03 LIMPIEZA MANUAL DE TERRENO NO m2
01.02.04 LIMPIEZA Y DESBROCE DEL TERRENO m2
01.02.05 EXTRACCION CANTERA (con explosivos m3
01.02.06 DESPEJE DE ARBOLES DENTRO DE m2
01.02.07 DEMOLICION DE CONSTRUCCIONES m2
01.02.08 ELIMINACION MATERIAL EXCEDENT m3
01.02.09 ELIMINACION FINAL CON TRANSPORT m3
01.03 CAPTACION CHINQUELNIYOC (TIPO LADERA 02 UND) 10,855.23
01.03.01 MOVIMIENTO DE TIERRAS 1,895.72
01.03.01.01 TRAZO NIVELES Y REPLANTEO D m2 4.50 1.95 8.78
01.03.01.02 EXCAVACION DE ZANJA EN TERR m3 10.67 27.03 288.41
01.03.01.03 RELLENO CON GRAVA SELECCION m3 6.60 126.81 836.95
01.03.01.04 ELIMINACION MATERIAL EXCEDENTE m3 13.34 57.09 761.58
01.03.02 CONCRETO ARMADO 8,959.51
01.03.02.01 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 149.33 7.31 1,091.60
01.03.02.02 ENCOFRADO Y DESENCOFRADO EN m2 32.40 76.51 2,478.92
01.03.02.03 CONCRETO F'C = 210 KG/CM2 m3 2.80 553.44 1,549.63
01.03.02.04 TAPA METALICA DE 0.40 X 0.40 m X 1 und 2.00 95.01 190.02
01.03.02.05 TAPA METALICA DE 0.60 X 0.60 m X 1 und 2.00 132.84 265.68
01.03.02.06 TARRAJEO CON IMPERMEABILIZANTE m2 19.28 43.98 847.93
01.03.02.07 TARRAJEO EXTERIOR E= 1.5CM MEZC m2 19.28 29.49 568.57
01.03.02.08 SUMINISTRO E INSTALACION DE glb 2.00 910.51 1,821.02
01.03.02.09 PINTADO DE MUROS EXTERIORES m2 19.28 7.58 146.14
01.03.03 CAPTACION CHINQUELNIYOC (TIPO A 01 UND) 0.00
01.03.03.01 MOVIMIENTO DE TIERRAS 0.00
01.03.03.01 TRAZO NIVELES Y REPLANTEO m2
01.03.03.01 EXCAVACION DE ZANJA EN TE m3
01.03.03.01 RELLENO CON GRAVA SELECCIO m3
01.03.03.01 ELIMINACION MATERIAL EXCEDEN m3
01.03.03.02 CONCRETO ARMADO 0.00
01.03.03.02 ACERO DE REFUERZO fy=4,200 kg/c kg
01.03.03.02 ENCOFRADO Y DESENCOFRADO m2
01.03.03.02 CONCRETO F'C = 210 KG/CM2 m3
01.03.03.02 TARRAJEO EXTERIOR E= 1.5CM ME m2
01.03.03.02 TARRAJEO CON IMPERMEABILIZAN m2
01.03.03.02 TAPA METALICA DE 0.60 X 0.60 m X und
01.03.03.02 TAPA METALICA DE 0.40 X 0.40 m X und
01.03.03.02 SUMINISTRO E INSTALACION glb
01.03.03.02 PINTADO DE MUROS EXTERIORES m2
01.03.04 CAPTACION CHINQUELNIYOC (TIPO B 01 UND) 0.00
01.03.04.01 MOVIMIENTO DE TIERRAS 0.00
01.03.04.01 TRAZO NIVELES Y REPLANTEO m2
01.03.04.01 EXCAVACION DE ZANJA EN TE m3
01.03.04.01 RELLENO CON GRAVA SELECCIO m3
01.03.04.01 ELIMINACION MATERIAL EXCEDEN m3
01.03.04.02 CONCRETO ARMADO 0.00
01.03.04.02 ACERO DE REFUERZO fy=4,200 kg/c kg
01.03.04.02 ENCOFRADO Y DESENCOFRADO m2
01.03.04.02 CONCRETO F'C = 210 KG/CM2 m3
01.03.04.02 TARRAJEO CON IMPERMEABILIZAN m2
01.03.04.02 SUMINISTRO E INSTALACION glb
01.03.04.02 TAPA METALICA DE 0.40 X 0.40 m X und
01.03.04.02 TARRAJEO EXTERIOR E= 1.5CM ME m2
01.03.04.02 SUMINISTRO Y COLOCACION DE und
01.03.04.02 TAPA METALICA DE 0.60 X 0.60 m X und
01.03.04.02 PINTADO DE MUROS EXTERIORES m2
01.03.05 CAPTACION CHINQUELNIYOC (TIPO C 01 UND) 0.00
01.03.05.01 MOVIMIENTO DE TIERRAS 0.00
01.03.05.01 TRAZO NIVELES Y REPLANTEO m2
01.03.05.01 EXCAVACION DE ZANJA EN TE m3
01.03.05.01 PERFILADO Y COMPACTADO SU m2
01.03.05.01 MURO SECO DE PIEDRA ACOMOD m3
01.03.05.01 RELLENO CON GRAVA SELECCIO m3
01.03.05.01 ELIMINACION MATERIAL EXCEDEN m3
01.03.05.02 CONCRETO ARMADO 0.00
01.03.05.02 ACERO DE REFUERZO fy=4,200 kg/c kg
01.03.05.02 ENCOFRADO Y DESENCOFRADO m2
01.03.05.02 CONCRETO F'C = 210 KG/CM2 m3
01.03.05.02 TARRAJEO EXTERIOR E= 1.5CM ME m2
01.03.05.02 TARRAJEO CON IMPERMEABILIZAN m2
01.03.05.02 TAPA METALICA DE 0.60 X 0.60 m X und
01.03.05.02 TAPA METALICA DE 0.40 X 0.40 m X und
01.03.05.02 SUMINISTRO E INSTALACION glb
01.03.05.02 PINTADO DE MUROS EXTERIORES m2
01.04 RESERVORIO (01 UND) 67,476.23
01.04.01 MOVIMIENTO DE TIERRAS 11,391.79
01.04.01.01 TRAZO NIVELES Y REPLANTEO D m2 35.00 1.95 68.25
01.04.01.02 EXCAVACION DE ZANJA EN TERR m3 113.75 27.03 3,074.66
01.04.01.03 COMPACTADO DE SUELO DE FUND m2 35.00 3.75 131.25
01.04.01.04 ELIMINACION MATERIAL EXCEDENTE m3 142.19 57.09 8,117.63
01.04.01.05 EXCAVACION MASIVA EN ROCA S m3
01.04.02 CONCRETO ARMADO 56,084.44
01.04.02.01 SOLADO DE CONCRETO e = 0.10 m2 35.00 28.39 993.65
01.04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,594.80 7.31 11,657.99
01.04.02.03 ENCOFRADO Y DESENCOFRADO EN m2 163.56 76.51 12,513.98
01.04.02.04 CONCRETO F'C = 210 KG/CM2 m3 30.88 553.44 17,090.23
01.04.02.05 TARRAJEO CON IMPERMEABILIZANTE m2 104.78 43.98 4,608.22
01.04.02.06 TARRAJEO EXTERIOR E= 1.5CM MEZC m2 104.78 29.49 3,089.96
01.04.02.07 SUMINISTRO DE ACCESORIOS DE glb 1.00 1,344.63 1,344.63
01.04.02.08 TAPA METALICA DE 0.60 X 0.60 m X 1 und 1.00 132.84 132.84
01.04.02.09 PINTADO DE ESTRUCTURAS CON E m2 66.00 8.95 590.70
01.04.02.10 CERCO PERIMETRICO m 24.00 169.26 4,062.24
01.04.03 MEJORAMIENTO DE SUELO DE CIMENTACION 0.00
01.04.03.01 EXCAVACION DE ZANJA EN TE m3
01.04.03.02 REFINE Y NIVELACION DE ZANJA m2
01.04.03.03 COLOCACION DE TUBERIA CRI m
01.04.03.04 RELLENO CON GRAVA SELECCIO m3
01.04.03.05 ENRROCADO MANUAL CON PIED m3
01.04.03.06 COLOCACION DE GEOMEBRANA m2
01.04.04 ESTABILIDAD Y PROTECCION DE TALUD 0.00
01.04.04.01 PERFILADO Y REFINE DEL TALUD m2
01.04.04.02 MAMPOSTERIA DE PIEDRA f'c=175 m3
01.04.04.03 INSTALACION DE GRAPA DE ANC und
01.04.04.04 COLOCACION DE GEOMEBRANA m2
01.04.05 CUNETA DE CORONACION 0.00
01.04.05.01 EXCAVACION DE ZANJA EN TE m3
01.04.05.02 EXCAVACION DE ZANJA EN TER m3
01.04.05.03 REFINE Y NIVELACION DE ZANJA m2
01.04.06 MURO DE PROTECCION TIPO GAVION 0.00
01.04.06.01 EXCAVACION DE ZANJA EN TE m3
01.04.06.02 REFINE Y NIVELACION DE ZANJA m2
01.04.06.03 GAVION CAJA (GC) 4.00X1.50X und
01.04.06.04 GAVION COLCHON (GC) 4.00X1 und
01.05 TUBERIA PRINCIPAL 134,565.55
01.05.01 LINEA DE INDUCCION (1.542 KM) 121,022.13
01.05.01.01 MOVIMIENTO DE TIERRAS 59,614.04
01.05.01.01 TRAZO, NIVELACION Y REPLANTE m 1,449.00 0.86 1,246.14
01.05.01.01 EXCAVACION DE ZANJA EN TE m3 938.54 27.03 25,368.74
01.05.01.01 EXCAVACION MANUAL EN ROCA m3 312.85 41.33 12,930.09
01.05.01.01 REFINE Y NIVELACION DE ZANJA m2 1,014.30 1.65 1,673.60
01.05.01.01 COMPACTADO DE SUELO DE FU m2 1,014.30 3.75 3,803.63
01.05.01.01 CAMA DE APOYO PARA TUBERIAS m 1,449.00 5.01 7,259.49
01.05.01.01 RELLENO Y COMPACTACION CO m3 1,028.38 7.13 7,332.35
01.05.01.01 CORTE EN ROCA FIJA CON EXPLO m3
01.05.01.01 ELIMINACION MATERIAL EXCEDEN m3
01.05.01.02 TUBERIA Y ACCESORIOS 61,408.09
01.05.01.02 INSTALACIÓN TUBERÍA DE PVC NT m 240.00 25.19 6,045.60
01.05.01.02 INSTALACIÓN TUBERÍA DE PVC NT m 1,209.00 41.98 50,753.82
01.05.01.02 ACCESORIOS LINEA DE CONDUCC glb 1.00 3,025.10 3,025.10
01.05.01.02 COLOCACION DE ACCESORIOS E und 89.00 8.35 743.15
01.05.01.02 PRUEBA HIDRAULICA DE TUBERI m 1,449.00 0.58 840.42
01.05.02 VALVULAS DE CONTROL (06 UND) 3,133.64
01.05.02.01 TRAZO NIVELES Y REPLANTEO D m2 2.43 1.95 4.74
01.05.02.02 EXCAVACION DE ZANJA EN TERR m3 1.46 27.03 39.46
01.05.02.03 ENCOFRADO Y DESENCOFRADO EN m2 12.96 76.51 991.57
01.05.02.04 CONCRETO f'c=175 kg/cm2 m3 0.78 509.95 397.76
01.05.02.05 TARRAJEO EXTERIOR E= 1.5CM MEZC m2 5.46 29.49 161.02
01.05.02.06 SUMINISTRO E INSTALACION DE glb 1.00 1,036.67 1,036.67
01.05.02.07 TAPA METALICA DE 0.60 X 0.60 m X 1 und 3.00 132.84 398.52
01.05.02.08 ELIMINACION MATERIAL EXCEDENTE m3 1.82 57.09 103.90
01.05.03 PASES VEHICULARES 10,409.78
01.05.03.01 TRAZO NIVELES Y REPLANTEO D m2 8.00 1.95 15.60
01.05.03.02 EXCAVACION DE ZANJA EN TERR m3 9.60 27.03 259.49
01.05.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 363.12 7.31 2,654.41
01.05.03.04 ENCOFRADO Y DESENCOFRADO EN m2 51.20 76.51 3,917.31
01.05.03.05 CONCRETO F'C = 210 KG/CM2 m3 5.20 553.44 2,877.89
01.05.03.06 ELIMINACION MATERIAL EXCEDENTE m3 12.00 57.09 685.08
01.05.04 MEJORAMIENTO DE SUELO DE LA LINEA DE ADUCCION 0.00
01.05.04.01 EXCAVACION DE ZANJA EN TERR m3
01.05.04.02 REFINE Y NIVELACION DE ZANJA m2
01.05.04.03 RELLENO CON MATERIAL DE GRAV m3
01.05.04.04 ELIMINACION MATERIAL EXCEDENTE m3
01.05.05 MUROS DE CONTENCION 0.00
01.05.05.01 TRAZO NIVELES Y REPLANTEO D m2
01.05.05.02 EXCAVACION DE ZANJA EN TERR m3
01.05.05.03 ENCOFRADO Y DESENCOFRADO EN m2
01.05.05.04 MAMPOSTERIA DE PIEDRA f'c=175 kg m3
01.05.05.05 RELLENO Y COMPACTACION CON m3
01.05.05.06 ELIMINACION MATERIAL EXCEDENTE m3
01.05.06 CAMARA DE REUNION (02 UND) 0.00
01.05.06.01 TRAZO NIVELES Y REPLANTEO D m2
01.05.06.02 EXCAVACION DE ZANJA EN TERR m3
01.05.06.03 ENCOFRADO Y DESENCOFRADO EN m2
01.05.06.04 CONCRETO f'c=175 kg/cm2 m3
01.05.06.05 TARRAJEO EXTERIOR E= 1.5CM MEZC m2
01.05.06.06 SUMINISTRO E INSTALACION DE glb
01.05.06.07 TAPA METALICA DE 0.60 X 0.35 m X 1 und
01.05.06.08 TAPA METALICA DE 1.10 X 1.10 m X 1 und
01.05.06.09 ELIMINACION MATERIAL EXCEDENTE m3
01.05.07 PASE AEREO 0.00
01.05.07.01 TRAZO NIVELES Y REPLANTEO D m2
01.05.07.02 EXCAVACION DE ZANJA EN TERR m3
01.05.07.03 RELLENO CON GRAVA SELECCION m3
01.05.07.04 ELIMINACION MATERIAL EXCEDENTE m3
01.05.07.05 ENCOFRADO Y DESENCOFRADO EN m2
01.05.07.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg
01.05.07.07 CONCRETO F'C = 210 KG/CM2 m3
01.05.07.08 TUBERIA GALVANIZADA TMC DE 4 m
01.05.07.09 SUMINISTRO Y COLOCACION DE glb
01.05.08 TUBERIA DE TMC GALVANIZADO DE 4" E=1.80MM ANCLADA A TALUD 0.00
01.05.08.01 TRAZO NIVELES Y REPLANTEO D m2
01.05.08.02 EXCAVACION DE ZANJA EN TERR m3
01.05.08.03 TUBERIA GALVANIZADA TMC DE 4 m
01.05.08.04 SUMINISTRO Y COLOCACION DE glb
01.05.08.05 ELIMINACION MATERIAL EXCEDENTE m3
01.05.09 DADOS DE CONCRETO PARA EMPALME DE TUBERIA 0.00
01.05.09.01 EXCAVACION DE ZANJA EN TERR m3
01.05.09.02 ENCOFRADO Y DESENCOFRADO EN m2
01.05.09.03 CONCRETO F'C = 210 KG/CM2 m3
01.05.09.04 ELIMINACION MATERIAL EXCEDENTE m3
01.06 SISTEMA DE ASPERSION 293,902.50
01.06.01 REDES DE DISTRIBUCION 240,061.87
01.06.01.01 MOVIMIENTO DE TIERRAS 102,328.69
01.06.01.01 TRAZO, NIVELACION Y REPLANTE m 4,384.99 0.86 3,771.09
01.06.01.01 EXCAVACION DE ZANJA EN TE m3 1,526.27 27.03 41,255.08
01.06.01.01 EXCAVACION MANUAL EN ROCA m3 169.59 41.33 7,009.15
01.06.01.01 REFINE Y NIVELACION DE ZANJA m2 2,192.50 1.65 3,617.63
01.06.01.01 COMPACTADO DE SUELO DE FU m2 2,192.50 3.75 8,221.88
01.06.01.01 CAMA DE APOYO PARA TUBERIAS m 4,384.99 5.01 21,968.80
01.06.01.01 RELLENO Y COMPACTACION CO m3 2,312.07 7.13 16,485.06
01.06.01.02 TUBERIA Y ACCESORIOS 67,808.95
01.06.01.02 TUBERIA PVC SAP 1 1/2" C-10 m 3,939.75 15.29 60,238.78
01.06.01.02 TUBERIA PVC SAP 1" C-10 m 445.24 6.61 2,943.04
01.06.01.02 SUMINISTRO E INSTALACION glb 1.00 2,083.84 2,083.84
01.06.01.02 PRUEBA HIDRAULICA DE TUBERI m 4,384.99 0.58 2,543.29
01.06.01.02 TUBERIA PVC SAP 3/4" C-10 m
01.06.01.03 VALVULAS DE CONTROL (13 UND) 11,506.52
01.06.01.03 TRAZO NIVELES Y REPLANTEO m2 7.20 1.95 14.04
01.06.01.03 EXCAVACION DE ZANJA EN TE m3 4.32 27.03 116.77
01.06.01.03 ENCOFRADO Y DESENCOFRADO m2 57.60 76.51 4,406.98
01.06.01.03 CONCRETO f'c=175 kg/cm2 m3 3.12 509.95 1,591.04
01.06.01.03 TARRAJEO EXTERIOR E= 1.5CM ME m2 24.00 29.49 707.76
01.06.01.03 SUMINISTRO E INSTALACION D glb 1.00 1,367.17 1,367.17
01.06.01.03 SUMINISTRO E INSTALACION glb 1.00 337.67 337.67
01.06.01.03 TAPA METALICA DE 0.60 X 0.60 m X und 20.00 132.84 2,656.80
01.06.01.03 ELIMINACION MATERIAL EXCEDEN m3 5.40 57.09 308.29
01.06.01.04 PROTECCION DE TUBERIA (23 UND) 37,639.16
01.06.01.04 EXCAVACION DE ZANJA EN TE m3 110.40 27.03 2,984.11
01.06.01.04 ENCOFRADO Y DESENCOFRADO m2 110.40 76.51 8,446.70
01.06.01.04 CONCRETO F'C = 210 KG/CM2 m3 33.12 553.44 18,329.93
01.06.01.04 ELIMINACION MATERIAL EXCEDEN m3 138.00 57.09 7,878.42
01.06.01.05 VALVULA REDUCTORA DE PRESION (08 UND) 7,132.55
01.06.01.05 TRAZO NIVELES Y REPLANTEO m2 3.60 1.95 7.02
01.06.01.05 EXCAVACION DE ZANJA EN TE m3 2.16 27.03 58.38
01.06.01.05 ENCOFRADO Y DESENCOFRADO m2 28.80 76.51 2,203.49
01.06.01.05 CONCRETO f'c=175 kg/cm2 m3 1.56 509.95 795.52
01.06.01.05 TARRAJEO EXTERIOR E= 1.5CM ME m2 12.00 29.49 353.88
01.06.01.05 SUMINISTRO E INSTALACION DE glb 1.00 2,231.72 2,231.72
01.06.01.05 TAPA METALICA DE 0.60 X 0.60 m X und 10.00 132.84 1,328.40
01.06.01.05 ELIMINACION MATERIAL EXCEDEN m3 2.70 57.09 154.14
01.06.01.06 VALVULA DE PURGA (23 UND) 13,646.00
01.06.01.06 TRAZO NIVELES Y REPLANTEO m2 7.20 1.95 14.04
01.06.01.06 EXCAVACION DE ZANJA EN TE m3 4.32 27.03 116.77
01.06.01.06 ENCOFRADO Y DESENCOFRADO m2 57.60 76.51 4,406.98
01.06.01.06 CONCRETO f'c=175 kg/cm2 m3 3.12 509.95 1,591.04
01.06.01.06 CONCRETO CICLOPEO f'c=140 kg/ m3 1.44 409.51 589.69
01.06.01.06 TARRAJEO EXTERIOR CON MO m2 24.00 20.22 485.28
01.06.01.06 SUMINISTRO E INSTALACION D glb 15.00 210.37 3,155.55
01.06.01.06 SUMINISTRO E INSTALACION glb 5.00 125.97 629.85
01.06.01.06 TAPA METALICA DE 0.60 X 0.60 m X und 20.00 132.84 2,656.80
01.06.01.07 VALULAS DE AIRE 0.00
01.06.01.07 TRAZO NIVELES Y REPLANTEO m2
01.06.01.07 EXCAVACION DE ZANJA EN TER m3
01.06.01.07 ENCOFRADO Y DESENCOFRADO E m2
01.06.01.07 CONCRETO f'c=175 kg/cm2 m3
01.06.01.07 CONCRETO CICLOPEO f'c=140 kg/c m3
01.06.01.07 TARRAJEO EXTERIOR CON MOR m2
01.06.01.07 SUMINISTRO E INSTALACION DE glb
01.06.01.07 SUMINISTRO E INSTALACION DE glb
01.06.01.07 TAPA METALICA DE 0.60 X 0.60 m X und
01.06.02 HIDRANTES (78 UND) 23,812.39
01.06.02.01 MOVIMIENTO DE TIERRAS 248.86
01.06.02.01 TRAZO NIVELES Y REPLANTEO m2 19.50 1.95 38.03
01.06.02.01 EXCAVACION DE ZANJA EN TE m3 7.80 27.03 210.83
01.06.02.02 CONCRETO SIMPLE 23,563.53
01.06.02.02 ENCOFRADO Y DESENCOFRADO m2 124.80 76.51 9,548.45
01.06.02.02 ACERO DE REFUERZO fy=4,200 kg/c kg 152.10 7.31 1,111.85
01.06.02.02 CONCRETO f'c=175 kg/cm2 m3 6.63 509.95 3,380.97
01.06.02.02 TARRAJEO EXTERIOR CON MO m2 31.20 20.22 630.86
01.06.02.02 SUMINISTRO E INSTALACION DE glb 63.00 114.25 7,197.75
01.06.02.02 SUMINISTRO E INSTALACION D glb 15.00 112.91 1,693.65
01.06.02.02 SUMINISTRO E INSTALACION D glb
01.06.03 ASPERSORES (78 UND) 30,028.24
01.06.03.01 SUMINISTRO E INSTALACION DE glb 30.00 381.88 11,456.40
01.06.03.02 SUMINISTRO E INSTALACION DE glb 28.00 401.08 11,230.24
01.06.03.03 SUMINISTRO E INSTALACION DE glb 20.00 367.08 7,341.60
01.07 TRANSPORTE DE MATERIALES 7,979.82
01.07.01 TRANSPORTE DE CEMENTO A MANO ( bol 967.00 2.19 2,117.73
01.07.02 TRANSPORTE DE AGREGADOS CON BU m3 65.00 30.95 2,011.75
01.07.03 TRANSPORTE DE PIEDRA CON BUGUI m3 63.00 30.95 1,949.85
01.07.04 TRANSPORTE DE MADERA A MANO (DI p2 3,045.00 0.31 943.95
01.07.05 TRANSPORTE DE FIERRO A MANO (DIS kg 2,372.00 0.22 521.84
01.07.06 TRANSPORTE DE TUBERÍA HASTA Ø 4" m 1,449.00 0.30 434.70
01.08 CONTROL DE CALIDAD 2,275.00
01.08.01 ROTURA DE BRIQUETAS DE CONCRET und 25.00 55.00 1,375.00
01.08.02 DISEÑO DE MEZCLA DE CONCRETO und 2.00 450.00 900.00
01.09 SEGURIDAD Y SALUD OCUPACIONAL
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE 9,068.40
01.09.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION
glb DEL
1.00 PLAN DE
1,000.00
SEGURIDAD Y SALUD
1000.00
EN EL TRABAJO
01.09.02 EQUIPOS DE PROTECCION INDIVIDUA und 20.00 360.92 7218.40
01.09.03 SEÑALIZACION TEMPORAL DE SEGU glb 1.00 150.00 150.00
01.09.04 RECURSOS PARA RESPUESTAS ANT glb 1.00 700.00 700.00
01.10 REPLANTEO DE CANALES Y OBRAS DE ARTE 0.00
01.10.01 CONTROL PLANIMETRICO Y ALTIME mes
01.11 CONSTRUCCION DE CAMINOS DE ACCESO 0.00
01.11.01 TRAZO NIVELES Y REPLANTEO DUR m2
01.11.02 CORTE DE PLATAFORMA EN MATERI m3
01.11.03 CORTE SUPERFICIAL MANUAL m3
01.11.04 RELLENO COMPACTADO CON MATERI m3
01.11.05 ENRROCADO MANUAL CON PIEDRA M m3
01.11.06 COLOCACION DE TUBERIA 6" ENC m
01.11.07 ELIMINACION MATERIAL EXCEDENTE ( m3
01.12 SISTEMA DE CONDUCCION DE CAPATACION AL RESERVORIO 0.00
01.12.01 LINEA DE CONDUCCION 0.00
01.12.01.01 MOVIMIENTO DE TIERRAS 0.00
01.12.01.01 TRAZO, NIVELACION Y REPLANTE m
01.12.01.01 EXCAVACION DE ZANJA EN TE m3
01.12.01.01 EXCAVACION MANUAL EN ROCA m3
01.12.01.01 REFINE Y NIVELACION DE ZANJA m2
01.12.01.01 COMPACTADO DE SUELO DE FU m2
01.12.01.01 CAMA DE APOYO PARA TUBERIAS m
01.12.01.01 RELLENO Y COMPACTACION CO m3
01.12.01.02 TUBERIA Y ACCESORIOS 0.00
01.12.01.02 INSTALACIÓN TUBERÍA DE PVC NT m
01.12.01.02 ACCESORIOS LINEA DE CONDUCC glb
01.12.01.02 COLOCACION DE ACCESORIOS E und
01.12.01.02 PRUEBA HIDRAULICA DE TUBERI m
01.12.02 CAMARA DE REUNION (03 UND) 0.00
01.12.02.01 TRAZO NIVELES Y REPLANTEO D m2
01.12.02.02 EXCAVACION DE ZANJA EN TERR m3
01.12.02.03 ENCOFRADO Y DESENCOFRADO EN m2
01.12.02.04 CONCRETO f'c=175 kg/cm2 m3
01.12.02.05 TARRAJEO EXTERIOR E= 1.5CM MEZC m2
01.12.02.06 SUMINISTRO E INSTALACION DE glb
01.12.02.07 TAPA METALICA DE 0.60 X 0.35 m X 1 und
01.12.02.08 TAPA METALICA DE 1.10 X 1.10 m X 1 und
01.12.02.09 ELIMINACION MATERIAL EXCEDENTE m3
02 CAPACITACION Y GESTION EN SISTEMAS DE RIEGO 40,000.00
02.01 CAPACITACION Y GESTION EN SISTEMA glb 1.00 40,000.00 40,000.00
03 PLAN DE MANEJO AMBIENTAL 30,000.00
03.01 PLAN DE MANEJO AMBIENTAL glb 1.00 30,000.00 30,000.00
04 PLAN DE MONITOREO ARQUEOLOGICO 30,243.00
04.01 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 30,243.00 30,243.00
05 PLAN COVID-19 30,378.39
05.01 PLAN DE VIGILANCIA Y PREVENCION C glb 1.00 30,378.39 30,378.39
06 OBRAS COMPLEMENTARIAS 593.97
06.01 SUMINISTRO Y COLOCACION DE PLAC und 1.00 593.97 593.97
07 FLETE TERRESTRE 0.00
07.01 FLETE TERRESTRE (MATERIALES) glb
08 PROVISION DE ALIMENTOS 0.00
08.01 PROVISION DE ALIMENTOS AL PERSO mes

COSTO DIRECTO 671,553.26 S/ 671,553.26

GASTOS GENERALES (16.99 %) S/ 114,114.11

GASTOS DE SUPERVISION (7.23%) S/ 48,575.53

GASTOS DE LIQUIDACION (2.14%) S/ 14,342.83

ELABORACION DEL EXPEDIENTE TECNIC S/ 25,800.00

COSTO TOTAL DE INVERSION (S/) S/ 874,385.73

196
UADRO COMPARATIVO MODIFICACIONES EN MONTO DE INVERSION SEGÚN C
RIEGO TECNIFICADO EN LA
PROVINCIA DE CUSCO – REGION

MODIFICACION PRESUPUESTAL

ACTUALIZACION DE PRECIOS MAYORES METRADOS

Precio Precio
Metrado Parcial Metrado Parcial
Unitario Unitario
561,754.07 187,219.66
8,641.54 3,300.00
2.00 750.00 1,500.00
2.00 820.77 1,641.54
5.00 600.00 3,000.00 3.00 600.00 1,800.00
5.00 500.00 2,500.00 3.00 500.00 1,500.00

7,450.67 1,074.37
5,833.99 1.02 5,950.67 318.01 1.02 324.37
2.00 750.00 1,500.00 1.00 750.00 750.00

11,419.94 0.00
1,930.25 0.00
4.50 2.29 10.31
10.67 27.03 288.41
6.60 131.81 869.95
13.34 57.09 761.58
9,489.69 0.00
149.33 7.37 1,100.56
32.40 77.27 2,503.55
2.80 615.37 1,723.04
2.00 95.01 190.02
2.00 132.84 265.68
19.28 49.30 950.50
19.28 33.59 647.62
2.00 964.61 1,929.22
19.28 9.31 179.50
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
71,602.44 76,390.28
11,407.19 6,855.69
35.00 2.29 80.15 104.06 2.29 238.30
113.75 27.03 3,074.66 145.68 27.03 3,937.73
35.00 3.85 134.75 104.06 3.85 400.63
142.19 57.09 8,117.63 39.92 57.09 2,279.03
- - -
60,195.25 - 69,534.59
35.00 30.66 1,073.10 69.06 30.66 2,117.38
1,594.80 7.37 11,753.68 3,151.07 7.37 23,223.39
163.56 77.27 12,638.28 85.80 77.27 6,629.77
30.88 615.37 19,002.63 40.99 615.37 25,224.02
104.78 49.30 5,165.65 95.00 49.30 4,683.50
104.78 33.59 3,519.56 95.00 33.59 3,191.05
1.00 1,382.13 1,382.13 -
1.00 132.84 132.84 -
66.00 10.77 710.82 41.94 10.77 451.69
24.00 200.69 4,816.56 20.00 200.69 4,013.80
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

136,359.84 70,364.05
121,643.14 17,899.55
60,122.13 3,858.83
1,449.00 1.02 1,477.98 93.00 1.02 94.86
938.54 27.03 25,368.74 60.24 27.03 1,628.29
312.85 41.33 12,930.09 20.08 41.33 829.91
1,014.30 1.65 1,673.60 65.10 1.65 107.42
1,014.30 3.85 3,905.06 65.10 3.85 250.64
1,449.00 5.01 7,259.49 93.00 5.01 465.93
1,028.38 7.30 7,507.17 66.00 7.30 481.80
- -
- -
61,521.01 14,040.72
240.00 25.19 6,045.60
1,209.00 41.98 50,753.82 333.00 41.98 13,979.34
1.00 3,022.10 3,022.10 -
89.00 8.35 743.15 -
1,449.00 0.66 956.34 93.00 0.66 61.38
3,921.48 3,921.49
2.43 2.29 5.56 2.43 2.29 5.56
1.46 27.03 39.46 1.46 27.03 39.46
12.96 77.27 1,001.42 12.96 77.27 1,001.42
0.78 563.01 439.15 0.78 563.01 439.15
5.46 33.59 183.40 5.46 33.59 183.40
1.00 1,750.07 1,750.07 1.00 1,750.07 1,750.07
3.00 132.84 398.52 3.00 132.84 398.52
1.82 57.09 103.90 1.82 57.09 103.90
10,795.22 - 48,543.01
8.00 2.29 18.32 46.50 2.29 106.49
9.60 27.03 259.49 55.80 27.03 1,508.27
363.12 7.37 2,676.19 229.05 7.37 1,688.10
51.20 77.27 3,956.22 284.10 77.27 21,952.41
5.20 615.37 3,199.92 33.78 615.37 20,787.20
12.00 57.09 685.08 43.80 57.09 2,500.54
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

302,798.42 5,756.72
246,978.89 5,756.72
103,642.59 0.00
4,384.99 1.02 4,472.69
1,526.27 27.03 41,255.08
169.59 41.33 7,009.15
2,192.50 1.65 3,617.63
2,192.50 3.85 8,441.13
4,384.99 5.01 21,968.80
2,312.07 7.30 16,878.11
68,551.50 3,686.79
3,939.75 15.29 60,238.78
445.24 6.61 2,943.04 557.76 6.61 3,686.79
1.00 2,475.59 2,475.59 -
4,384.99 0.66 2,894.09

12,745.79 0.00
7.20 2.29 16.49
4.32 27.03 116.77
57.60 77.27 4,450.75
3.12 563.01 1,756.59
24.00 33.59 806.16
1.00 2,133.77 2,133.77
1.00 500.17 500.17
20.00 132.84 2,656.80
5.40 57.09 308.29
39,774.19 0.00
110.40 27.03 2,984.11
110.40 77.27 8,530.61
33.12 615.37 20,381.05
138.00 57.09 7,878.42
7,717.84 0.00
3.60 2.29 8.24
2.16 27.03 58.38
28.80 77.27 2,225.38
1.56 563.01 878.30
12.00 33.59 403.08
1.00 2,661.92 2,661.92
10.00 132.84 1,328.40
2.70 57.09 154.14
14,546.98 2,069.93
7.20 2.29 16.49 1.08 2.29 2.47
4.32 27.03 116.77 0.65 27.03 17.57
57.60 77.27 4,450.75 8.64 77.27 667.61
3.12 563.01 1,756.59 0.47 563.01 264.61
1.44 443.89 639.20 0.22 443.89 97.66
24.00 22.67 544.08 3.60 22.67 81.61
15.00 241.33 3,619.95 1.00 241.33 241.33
5.00 149.27 746.35 2.00 149.27 298.54
20.00 132.84 2,656.80 3.00 132.84 398.52
0.00 0.00

24,561.29 0.00
255.49 0.00
19.50 2.29 44.66
7.80 27.03 210.83
24,305.80 0.00
124.80 77.27 9,643.30
152.10 7.37 1,120.98
6.63 563.01 3,732.76
31.20 22.67 707.30
63.00 116.87 7,362.81
15.00 115.91 1,738.65
- -
31,258.24 0.00
30.00 398.08 11,942.40
28.00 419.08 11,734.24
20.00 379.08 7,581.60
7,979.82 6,381.44
967.00 2.19 2,117.73 781.00 2.19 1,710.39
65.00 30.95 2,011.75 105.00 30.95 3,249.75
63.00 30.95 1,949.85 2.00 30.95 61.90
3,045.00 0.31 943.95 1,410.00 0.31 437.10
2,372.00 0.22 521.84 3,550.00 0.22 781.00
1,449.00 0.30 434.70 471.00 0.30 141.30
2,275.00 - 1,900.00
25.00 55.00 1,375.00 10.00 55.00 550.00
2.00 450.00 900.00 3.00 450.00 1,350.00
13,226.40 22,052.80
1.00 1,000.00 1,000.00
20.00 551.32 11,026.40 40.00 551.32 22,052.80
1.00 500.00 500.00
1.00 700.00 700.00
0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

40,000.00 0.00
1.00 40,000.00 40,000.00
30,000.00 0.00
1.00 30,000.00 30,000.00
30,243.00 0.00
1.00 30,243.00 30,243.00
30,378.39 0.00
1.00 30,378.39 30,378.39
594.49 0.00
1.00 594.49 594.49
0.00 0.00
- -
0.00 0.00
- -

- S/ 692,969.95 - S/ 187,219.66

- 0.00 0.00% - 0.00 0.00%

- 0.00 0.00% - 0.00 0.00%

- 0.00 0.00% - 0.00 0.00%

- 0.00 0.00% - 0.00 0.00%

- 0.00 0.00% - 0.00 0.00%


E INVERSION SEGÚN COMPONENTE Y ACTIVIDADES

ODIFICACION PRESUPUESTAL

PARTIDAS NUEVAS DEDUCTIVOS

Precio Precio
Metrado Parcial Metrado Parcial
Unitario Unitario
518,698.15 70,570.79
35,653.68 0.00

1.00 335.28 335.28


260.00 135.84 35,318.40
93,434.43 0.00

648.13 2.25 1,458.29


6,152.00 6.20 38,142.40
500.00 32.36 16,180.00
1,500.00 3.64 5,460.00
35.00 13.16 460.60
2,535.80 10.97 27,817.73
80.78 48.47 3,915.41
20,120.42 11,121.22
0.00 1,631.53

6.60 131.81 869.95


13.34 57.09 761.58
0.00 - 9,489.69
149.33 7.37 1,100.56
32.40 77.27 2,503.55
2.80 615.37 1,723.04
2.00 95.01 190.02
2.00 132.84 265.68
19.28 49.30 950.50
19.28 33.59 647.62
2.00 964.61 1,929.22
19.28 9.31 179.50
6,347.53 0.00
823.88 0.00
13.50 2.29 30.92
6.75 27.03 182.45
2.70 131.81 355.89
4.46 57.09 254.62
5523.65 0.00
74.67 7.37 550.32
20.40 77.27 1,576.31
1.75 615.37 1,076.90
11.94 33.59 401.06
11.94 49.30 588.64
1.00 132.84 132.84
1.00 95.01 95.01
1.00 991.41 991.41
11.94 9.31 111.16
6,820.75 0.00
549.07 0.00
9.00 2.29 20.61
4.50 27.03 121.64
1.80 131.81 237.26
2.97 57.09 169.56
6271.68 0.00
74.67 7.37 550.32
16.20 77.27 1,251.77
1.40 615.37 861.52
9.64 49.30 475.25
1.00 991.41 991.41
1.00 95.01 95.01
1.00 132.84 132.84
9.64 33.59 323.81
3.00 500.00 1,500.00
9.64 9.31 89.75
6,952.14 0.00
1428.50 0.00
16.10 2.29 36.87
8.05 27.03 217.59
24.00 9.32 223.68
2.52 98.47 248.14
2.85 131.81 375.66
5.72 57.09 326.55
5523.65 0.00
74.67 7.37 550.32
20.40 77.27 1,576.31
1.75 615.37 1,076.90
11.94 33.59 401.06
11.94 49.30 588.64
1.00 132.84 132.84
1.00 95.01 95.01
1.00 991.41 991.41
11.94 9.31 111.16
46,368.29 0.00
6,362.68 0.00

292.00 21.79 6,362.68


0.00 0.00

3,434.04 0.00
5.40 27.03 145.96
19.80 1.65 32.67
18.00 72.20 1,299.60
2.25 131.81 296.57
2.70 157.60 425.52
36.00 34.27 1,233.72
7,570.98 0.00
98.00 0.90 88.20
9.60 319.46 3,066.82
15.00 70.50 1,057.50
98.00 34.27 3,358.46
1,124.29 0.00
2.40 27.03 64.87
4.80 210.40 1,009.92
30.00 1.65 49.50
27,876.30 0.00
65.20 27.03 1,762.36
81.50 1.65 134.48
13.00 1,019.07 13,247.91
13.00 979.35 12,731.55
102,120.97 6,045.60
13,050.48 6,045.60
13,050.48 0.00

8.00 40.14 321.12


222.97 57.09 12,729.36
0.00 6,045.60
240.00 25.19 6,045.60

0.00 0.00

0.00 0.00

8,633.79 0.00
37.80 27.03 1,021.73
180.00 1.65 297.00
9.45 260.27 2,459.55
85.05 57.09 4,855.50
38,808.43 0.00
25.20 2.29 57.71
42.00 27.03 1,135.26
50.40 77.27 3,894.41
100.80 319.46 32,201.57
17.64 7.30 128.77
24.36 57.09 1,390.71
3,015.07 0.00
3.00 2.29 6.87
3.00 27.03 81.09
10.40 77.27 803.61
1.19 563.01 669.98
10.40 33.59 349.34
1.00 720.17 720.17
1.00 34.34 34.34
1.00 169.84 169.84
3.15 57.09 179.83
15,802.50 0.00
2.40 2.29 5.50
2.40 27.03 64.87
0.81 131.81 106.77
1.67 57.09 95.34
136.83 7.37 1,008.44
12.80 77.27 989.06
2.25 615.37 1,384.58
42.00 286.57 12,035.94
1.00 112.00 112.00
21,804.84 0.00
74.40 2.29 170.38
44.64 27.03 1,206.62
62.00 286.57 17,767.34
1.00 112.00 112.00
44.64 57.09 2,548.50
1,005.87 0.00
1.76 27.03 47.57
7.04 77.27 543.98
0.51 615.37 313.84
1.76 57.09 100.48
17,396.21 53,403.97
16,463.97 30,989.33
0.00 3,776.16
152.99 1.02 156.05
59.17 27.03 1,599.37
5.92 41.33 244.67
76.49 1.65 126.21
76.49 3.85 294.49
152.99 5.01 766.48
80.67 7.30 588.89
12,477.15 22,665.19
1,475.75 15.29 22,564.22

152.99 0.66 100.97


765.00 16.31 12,477.15
0.00 3,537.97
2.52 2.29 5.77
1.51 27.03 40.82
20.16 77.27 1,557.76
1.09 563.01 613.68
8.40 33.59 282.16

7.00 132.84 929.88


1.89 57.09 107.90
0.00 0.00

0.00 1,010.01
0.72 2.29 1.65
0.43 27.03 11.62
5.76 77.27 445.08
0.31 563.01 174.53
2.40 33.59 80.62
-
2.00 132.84 265.68
0.54 57.09 30.83
0.00 0.00

3,986.82 0.00
2.52 2.29 5.77
1.51 27.03 40.82
20.16 77.27 1,557.76
1.09 563.01 613.68
0.50 443.89 221.95
10.08 22.67 228.51
1.00 239.18 239.18
1.00 149.27 149.27
7.00 132.84 929.88
932.24 10,385.24
0.00 98.27
7.50 2.29 17.18
3.00 27.03 81.09
932.24 10,286.97
48.00 77.27 3,708.96
58.50 7.37 431.15
2.55 563.01 1,435.68
12.00 22.67 272.04
36.00 116.87 4,207.32
2.00 115.91 231.82
8.00 116.53 932.24
0.00 12,029.40
3.00 398.08 1,194.24
15.00 419.08 6,286.20
- 12.00 379.08 4,548.96
0.00 0.00

0.00 0.00
0.00 0.00

43,481.92 0.00
8.00 5,435.24 43,481.92
129,133.98 0.00
2,025.00 2.29 4,637.25
3,392.00 6.10 20,691.20
33.75 97.29 3,283.54
315.00 166.80 52,542.00
180.00 157.60 28,368.00
15.00 123.80 1,857.00
311.00 57.09 17,754.99
30,988.25 0.00
25,672.65 0.00
8,783.18 0.00
378.00 1.02 385.56
126.00 27.03 3,405.78
32.76 41.33 1,353.97
226.80 1.65 374.22
226.80 3.85 873.18
378.00 5.01 1,893.78
68.04 7.30 496.69
16,889.47 0.00
378.00 41.98 15,868.44
1.00 629.60 629.60
17.00 8.35 141.95
378.00 0.66 249.48
5,315.60 0.00
6.00 2.29 13.74
6.00 27.03 162.18
20.80 77.27 1,607.22
2.39 563.01 1,345.59
20.80 33.59 698.67
1.00 720.17 720.17
2.00 34.34 68.68
2.00 169.84 339.68
6.30 57.09 359.67
0.00 0.00

0.00 0.00

0.00 0.00

0.00 30,378.39
1.00 30,378.39 30,378.39
0.00 - 0.00

5,500.00 0.00
1.00 5,500.00 5,500.00
11,897.60 0.00
8.00 1,487.20 11,897.60

19,911.74 S/ 536,095.75 S/ 100,949.18

0.00 0.00% 0.00 0.00%

0.00 0.00% 0.00 0.00%

0.00 0.00% 0.00 0.00%

0.00 0.00% 0.00 0.00%

19,911.74 2.28% 0.00 0.00%


EXPEDIENTE MODIFICADO

Metrado Precio Unitario Parcial %

1,196,168.86
47,595.22
2.00 750.00 1,500.00 100.00%
2.00 820.77 1,641.54
8.00 600.00 4,800.00
8.00 500.00 4,000.00
1.00 335.28 335.28
260.00 135.84 35,318.40
- - 101,959.47
6,152.00 1.02 6,275.04
3.00 750.00 2,250.00
648.13 2.25 1,458.29
6,152.00 6.20 38,142.40
500.00 32.36 16,180.00
1,500.00 3.64 5,460.00
35.00 13.16 460.60
2,535.80 10.97 27,817.73
80.78 48.47 3,915.41
20,419.13
298.72
4.50 2.29 10.31
10.67 27.03 288.41

0.00

6,347.53
823.88
13.50 2.29 30.92
6.75 27.03 182.45
2.70 131.81 355.89
4.46 57.09 254.62
5523.65
74.67 7.37 550.32
20.40 77.27 1,576.31
1.75 615.37 1,076.90
11.94 33.59 401.06
11.94 49.30 588.64
1.00 132.84 132.84
1.00 95.01 95.01
1.00 991.41 991.41
11.94 9.31 111.16
6,820.74
549.06
9.00 2.29 20.61
4.50 27.03 121.64
1.80 131.81 237.26
2.97 57.09 169.56
6271.68
74.67 7.37 550.32
16.20 77.27 1,251.77
1.40 615.37 861.52
9.64 49.30 475.25
1.00 991.41 991.41
1.00 95.01 95.01
1.00 132.84 132.84
9.64 33.59 323.81
3.00 500.00 1,500.00
9.64 9.31 89.75
6,952.15
1428.50
16.10 2.29 36.87
8.05 27.03 217.59
24.00 9.32 223.68
2.52 98.47 248.14
2.85 131.81 375.66
5.72 57.09 326.55
5523.65
74.67 7.37 550.32
20.40 77.27 1,576.31
1.75 615.37 1,076.90
11.94 33.59 401.06
11.94 49.30 588.64
1.00 132.84 132.84
1.00 95.01 95.01
1.00 991.41 991.41
11.94 9.31 111.16
194,361.00
24,625.56
139.06 2.29 318.45
259.43 27.03 7,012.39
139.06 3.85 535.38
182.11 57.09 10,396.66
292.00 21.79 6,362.68
129,729.84
104.06 30.66 3,190.48
4,745.87 7.37 34,977.06
249.36 77.27 19,268.05
71.87 615.37 44,226.64
199.78 49.30 9,849.15
199.78 33.59 6,710.61
1.00 1,382.13 1,382.13
1.00 132.84 132.84
107.94 10.77 1,162.51
44.00 200.69 8,830.36
3,434.04
5.40 27.03 145.96
19.80 1.65 32.67
18.00 72.20 1,299.60
2.25 131.81 296.57
2.70 157.60 425.52
36.00 34.27 1,233.72
7,570.98
98.00 0.90 88.20
9.60 319.46 3,066.82
15.00 70.50 1,057.50
98.00 34.27 3,358.46
1,124.29
2.40 27.03 64.87
4.80 210.40 1,009.92
30.00 1.65 49.50
27,876.29
65.20 27.03 1,762.36
81.50 1.65 134.48
13.00 1,019.07 13,247.91
13.00 979.35 12,731.55
302,799.27
146,547.56
77,031.43
1,542.00 1.02 1,572.84
998.78 27.03 26,997.02
332.93 41.33 13,760.00
1,079.40 1.65 1,781.01
1,079.40 3.85 4,155.69
1,542.00 5.01 7,725.42
1,094.38 7.30 7,988.97
8.00 40.14 321.12
222.97 57.09 12,729.36
69,516.13
- 25.19 -
1,542.00 41.98 64,733.16
1.00 3,022.10 3,022.10
89.00 8.35 743.15
1,542.00 0.66 1,017.72
7,842.98
4.86 2.29 11.13
2.92 27.03 78.93
25.92 77.27 2,002.84
1.56 563.01 878.30
10.92 33.59 366.80
2.00 1,750.07 3,500.14
6.00 132.84 797.04
3.64 57.09 207.81
59,338.24
54.50 2.29 124.81
65.40 27.03 1,767.76
592.17 7.37 4,364.29
335.30 77.27 25,908.63
38.98 615.37 23,987.12
55.80 57.09 3,185.62
8,633.79
37.80 27.03 1,021.73
180.00 1.65 297.00
9.45 260.27 2,459.55
85.05 57.09 4,855.50
38,808.43
25.20 2.29 57.71
42.00 27.03 1,135.26
50.40 77.27 3,894.41
100.80 319.46 32,201.57
17.64 7.30 128.77
24.36 57.09 1,390.71
3,015.07
3.00 2.29 6.87
3.00 27.03 81.09
10.40 77.27 803.61
1.19 563.01 669.98
10.40 33.59 349.34
1.00 720.17 720.17
1.00 34.34 34.34
1.00 169.84 169.84
3.15 57.09 179.83
15,802.50
2.40 2.29 5.50
2.40 27.03 64.87
0.81 131.81 106.77
1.67 57.09 95.34
136.83 7.37 1,008.44
12.80 77.27 989.06
2.25 615.37 1,384.58
42.00 286.57 12,035.94
1.00 112.00 112.00
21,804.84
74.40 2.29 170.38
44.64 27.03 1,206.62
62.00 286.57 17,767.34
1.00 112.00 112.00
44.64 57.09 2,548.50
1,005.87
1.76 27.03 47.57
7.04 77.27 543.98
0.51 615.37 313.84
1.76 57.09 100.48
271,615.16
238,210.26
99,866.43
4,232.00 1.02 4,316.64
1,467.10 27.03 39,655.71
163.67 41.33 6,764.48
2,116.01 1.65 3,491.42
2,116.01 3.85 8,146.64
4,232.00 5.01 21,202.32
2,231.40 7.30 16,289.22
62,050.25
2,464.00 15.29 37,674.56
1,003.00 6.61 6,629.83
1.00 2,475.59 2,475.59
4,232.00 0.66 2,793.12
765.00 16.31 12,477.15
9,207.82
4.68 2.29 10.72
2.81 27.03 75.95
37.44 77.27 2,892.99
2.03 563.01 1,142.91
15.60 33.59 524.00
1.00 2,133.77 2,133.77
1.00 500.17 500.17
13.00 132.84 1,726.92
3.51 57.09 200.39
39,774.19
110.40 27.03 2,984.11
110.40 77.27 8,530.61
33.12 615.37 20,381.05
138.00 57.09 7,878.42
6,707.84
2.88 2.29 6.60
1.73 27.03 46.76
23.04 77.27 1,780.30
1.25 563.01 703.76
9.60 33.59 322.46
1.00 2,661.92 2,661.92
8.00 132.84 1,062.72
2.16 57.09 123.31
16,616.91
8.28 2.29 18.96
4.97 27.03 134.34
66.24 77.27 5,118.36
3.59 563.01 2,021.21
1.66 443.89 736.86
27.60 22.67 625.69
16.00 241.33 3,861.28
7.00 149.27 1,044.89
23.00 132.84 3,055.32
3,986.82
2.52 2.29 5.77
1.51 27.03 40.82
20.16 77.27 1,557.76
1.09 563.01 613.68
0.50 443.89 221.95
10.08 22.67 228.51
1.00 239.18 239.18
1.00 149.27 149.27
7.00 132.84 929.88
14,176.06
157.22
12.00 2.29 27.48
4.80 27.03 129.74
- - 14,018.83
76.80 77.27 5,934.34
93.60 7.37 689.83
4.08 563.01 2,297.08
19.20 22.67 435.26
27.00 116.87 3,155.49
13.00 115.91 1,506.83
8.00 - -
- - 19,228.84
27.00 398.08 10,748.16
13.00 419.08 5,448.04
8.00 379.08 3,032.64
- - 14,361.26
1,748.00 2.19 3,828.12
170.00 30.95 5,261.50
65.00 30.95 2,011.75
4,455.00 0.31 1,381.05
5,922.00 0.22 1,302.84
1,920.00 0.30 576.00
- - 4,175.00
35.00 55.00 1,925.00
5.00 450.00 2,250.00
- - 35,279.20
1.00 1,000.00 1,000.00
60.00 551.32 33,079.20
1.00 500.00 500.00
1.00 700.00 700.00
43,481.92
8.00 5,435.24 43,481.92
129,133.98
2,025.00 2.29 4,637.25
3,392.00 6.10 20,691.20
33.75 97.29 3,283.54
315.00 166.80 52,542.00
180.00 157.60 28,368.00
15.00 123.80 1,857.00
311.00 57.09 17,754.99
30,988.25
25,672.65
8,783.18
378.00 1.02 385.56
126.00 27.03 3,405.78
32.76 41.33 1,353.97
226.80 1.65 374.22
226.80 3.85 873.18
378.00 5.01 1,893.78
68.04 7.30 496.69
16,889.47
378.00 41.98 15,868.44
1.00 629.60 629.60
17.00 8.35 141.95
378.00 0.66 249.48
5,315.60
6.00 2.29 13.74
6.00 27.03 162.18
20.80 77.27 1,607.22
2.39 563.01 1,345.59
20.80 33.59 698.67
1.00 720.17 720.17
2.00 34.34 68.68
2.00 169.84 339.68
6.30 57.09 359.67
- - 40,000.00
1.00 40,000.00 40,000.00
- - 30,000.00
1.00 30,000.00 30,000.00
- - 30,243.00
1.00 30,243.00 30,243.00
- - 0.00
- -
- - 594.49
1.00 594.49 594.49
5,500.00
1.00 5,500.00 5,500.00
11,897.60
8.00 1,487.20 11,897.60

S/ 1,314,403.95 195.73%

114,114.11 100.00%

48,575.53 100.00%

14,342.83 100.00%

25,800.00 100.00%

1,517,236.4 173.52%
0.0966

0.6805

0.163
RESUMEN DE MODIFICACIONES EN EMONTO DE INVERSION SEGÚN

PRESUPUESTO MODIFICACION PRESUPUESTARIA


PRESUPEUSTO POR PARTIDA APROBADO SEGÚN
GENERICA EXPEDIENTE ACTUALIZACIO MAYORES
TECNICO N DE PRECIOS METRADOS

01.00 INFRAESTRUCTURA DE RIEGO S/ 540,337.90 S/ 561,754.07 S/ 187,219.66

01.01 OBRAS PROVISIONALES S/ 7,697.94 S/ 8,641.54 S/ 3,300.00

01.02 OBRAS PRELIMINARES S/ 6,517.23 S/ 7,450.67 S/ 1,074.37

01.03 CAPTACION CHINQUELNIYOC


S/ 10,855.23 S/ 11,419.94 S/ -
(TIPO LADERA 02 UND)

01.04 RESERVORIO (01 UND) S/ 67,476.23 S/ 71,602.44 S/ 76,390.28

01.05 TUBERIA PRINCIPAL S/ 134,565.55 S/ 136,359.84 S/ 70,364.05

01.06 SISTEMA DE ASPERSION S/ 293,902.50 S/ 302,798.42 S/ 5,756.72

01.07 TRANSPORTE DE MATERIALES S/ 7,979.82 S/ 7,979.82 S/ 6,381.44

01.08 CONTROL DE CALIDAD S/ 2,275.00 S/ 2,275.00 S/ 1,900.00

01.09 SEGURIDAD Y SALUD


S/ 9,068.40 S/ 13,226.40 S/ 22,052.80
OCUPACIONAL
01.10 REPLANTEO DE CANALES Y
S/ - S/ - S/ -
OBRAS DE ARTE
01.11 CONSTRUCCION DE CAMINOS DE
S/ - S/ - S/ -
ACCESO
01.12 SISTEMA DE CONDUCCION DE
S/ - S/ - S/ -
CAPATACION AL RESERVORIO
02.00 CAPACITACION Y GESTION EN
S/ 40,000.00 S/ 40,000.00 S/ -
SISTEMAS DE RIEGO

03.00 PLAN DE MANEJO AMBIENTAL S/ 30,000.00 S/ 30,000.00 S/ -

04.00 PLAN DE MONITOREO


S/ 30,243.00 S/ 30,243.00 S/ -
ARQUEOLOGICO

05.00 PLAN COVID-19 S/ 30,378.39 S/ 30,378.39 S/ -

06.00 OBRAS COMPLEMENTARIAS S/ 593.97 S/ 594.49 S/ -

07.00 FLETE TERRESTRE S/ - S/ - S/ -

08.00 PROVISION DE ALIMENTOS S/ - S/ - S/ -


COSTO DIRECTO S/ 671,553.26 S/ 692,969.95 S/ 187,219.66

GASTOS GENERALES S/ 114,114.11 0.00%

GASTO DE SUPERVICION S/ 48,575.53 0.00%

GASTO DE LIQUIDACION S/ 14,342.83 0.00%

GASTOS DE ELABORACION DE
S/ 25,800.00 0.00%
EXPEDIENTE TECNICO

PRESUPUESTO TOTAL S/. 874,385.73 S/. 692,969.95 S/. 187,219.66


NVERSION SEGÚN COMPONENTE Y ACTIVIDADES

ICACION PRESUPUESTARIA EXPEDIENTE


PRESUPUESTO
TECNICO
PARTIDAS ADICIONAL
DEDUCTIVOS MODIFICADO
NUEVAS

S/ 518,698.15 S/ 70,570.79 S/ 656,763.20 S/ 1,197,101.10

S/ 35,653.68 S/ - S/ 39,897.28 S/ 47,595.22

S/ 93,434.43 S/ - S/ 95,442.24 S/ 101,959.47

S/ 20,120.42 S/ 11,121.22 S/ 9,563.91 S/ 20,419.14

S/ 46,368.29 S/ - S/ 126,884.78 S/ 194,361.01

S/ 102,120.97 S/ 6,045.60 S/ 168,233.72 S/ 302,799.27

S/ 17,396.21 S/ 53,403.97 -S/ 21,355.12 S/ 272,547.38

S/ - S/ - S/ 6,381.44 S/ 14,361.26

S/ - S/ - S/ 1,900.00 S/ 4,175.00

S/ - S/ - S/ 26,210.80 S/ 35,279.20

S/ 43,481.92 S/ - S/ 43,481.92 S/ 43,481.92

S/ 129,133.98 S/ - S/ 129,133.98 S/ 129,133.98

S/ 30,988.25 S/ - S/ 30,988.25 S/ 30,988.25

S/ - S/ - S/ - S/ 40,000.00

S/ - S/ - S/ - S/ 30,000.00

S/ - S/ - S/ - S/ 30,243.00

S/ - S/ 30,378.39 -S/ 30,378.39 S/ -

S/ - S/ - S/ 0.52 S/ 594.49

S/ 5,500.00 S/ - S/ 5,500.00 S/ 5,500.00

S/ 11,897.60 S/ - S/ 11,897.60 S/ 11,897.60


S/ 536,095.75 S/ 100,949.18 S/ 643,782.93 S/ 1,315,336.19

S/ - S/ -

S/ - S/ -

S/ - S/ -

S/ - S/ -

S/. 536,095.75 S/. 100,949.18 S/. 643,782.93 S/. 1,315,336.19


RESUMEN DE MODIFICACIONES EN EMONTO DE INVERSION SEGÚN
COMPONENTE Y ACTIVIDADES

PRESUPUESTO APROBADO SEGÚN PRESUPEUSTO DE EXPEDIENTE


DESCRIPCION
EXPEDIENTE TECNICO TECNICO MODIFICADO

COSTO DIRECTO S/ 671,553.26 S/ 1,314,403.95

GASTOS GENERALES 16.99% S/ 114,114.11 0.00%

GASTO DE SUPERVICION 7.23% S/ 48,575.53 0.00%

GASTO DE LIQUIDACION 2.14% S/ 14,342.83 0.00%

GASTOS DE ELABORACION DE
3.84% S/ 25,800.00 0.00%
EXPEDIENTE TECNICO

PRESUPUESTO TOTAL S/. 874,385.73 S/. 1,314,403.95


VERSION SEGÚN

UPEUSTO DE EXPEDIENTE
TECNICO MODIFICADO

1,314,403.95

S/ -

S/ -

S/ -

S/ -

S/. 1,314,403.95

You might also like