You are on page 1of 39

Structural Calculation Sheets

for
Belt conveyor Foundations

Cairo, Egypt

15 - August 2023
Introduction:

The design of Footing according to ECP 203-2007 , the grade of Concrete


C20/25 where Fcu=250 kg/cm2 and Fy=360 kg/cm2 , Bearing Capacity
2 kg/cm2 .

The Design of Footing using SAF V12 software.


Load on Footing From Design of steel Structure as Table Attached with
Calculation , IFC Drawings .
SAP 3D Model
Load Pattern

Load Combination
Load Combination (ULS)
Load Combination (SLS)
Bending Moment ( 1-1 )

Bending Moment ( 2-2 )


Check on bearing capacity
Design of combined Footing
On Axe 1,2 ( t=800mm)

Moment x bottom

Mu=20.35 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m
Design of combined Footing
On Axe 3 ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m
Design of combined Footing
On Axe 4 ( t=800mm )

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m
Additional RFT
Mu=39 t/m2

Reinforcement
3#16/m Additional
Design of combined Footing
On Axe 5 ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m
Design of combined Footing
On Axe 6 ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT
Mu=59 t/m2

Reinforcement
6#18/m Additional
Design of combined Footing
On Axe 7 ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT
Mu=39 t/m2

Reinforcement
3#16/m Additional
Design of combined Footing
On Axe 8 ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT
Mu=39 t/m2

Reinforcement
6#16/m Additional
Design of combined Footing
On Axe 9 ( 9L) ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Additional RFT
Mu=39 t/m2

Reinforcement
3#16/m Additional
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT
Mu=52 t/m2

Reinforcement
6#16/m Additional
Design of combined Footing
On Axe 9 ( 9R) ( t=800mm)

Moment X bottom
M=26.05 t/m2

Reinforcement
6#16/m
Additional RFT
Mu=52 t/m2

Reinforcement
6#16/m Additional
Moment Y bottom

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT
Mu=75.3 t/m2

Reinforcement
6#22/m Additional
Design of combined Footing
Negative Moment on Footings

Moment X Top
M=26.05 t/m2

Reinforcement
6#16/m
Additional RFT For ( 9R-9L)
Mu=52 t/m2

Reinforcement
6#16/m Additional
Moment Y Top

M=26.05 t/m2

Reinforcement
6#16/m Main RFT
Additional RFT For Footing on
Axe (6)
Mu=39 t/m2

Reinforcement
6#16/m Additional
Additional RFT For Footing on
Axe (9L , 9R)
Mu=76 t/m2

Reinforcement
6#22/m Additional