Professional Documents
Culture Documents
ALC - 02 PLANO CLAVE DE RED DE ALCANTARILLADO-Plano Colector
ALC - 02 PLANO CLAVE DE RED DE ALCANTARILLADO-Plano Colector
TUB.EXIST. PV
A A
Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4"
Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4" Ø4"
Ø4" Ø4" Ø4" Ø4"
L=14.65m Ø4" PVC S=1.5% SUM Ø2" L=14.37m Ø4" PVC S=1.5% L=14.23m Ø4" PVC S=1.5% L=14.30m Ø4" PVC S=1.5% L=15.46m Ø4" PVC S=1.5% L=24.67m Ø4" PVC S=1.5% SUM Ø2" SUM Ø2"
SUM Ø2" SUM Ø2" SUM Ø2" Ø2" SUM Ø2" Ø2" SUM Ø2" SUM Ø2" SUM Ø2" SUM Ø2" SUM Ø2" Ø2" SUM Ø2" Ø2" Ø2" SUM Ø2" Ø2" SUM Ø2" SUM Ø2"
SUM Ø2" SUM Ø2" Ø2" Ø2" SUM Ø2" SUM Ø2" SUM Ø2" SUM Ø2" SUM Ø2" SUM Ø2" Ø2" SUM Ø2" Ø2" Ø2" SUM Ø2" SUM Ø2" SUM Ø2"
Ø2" Ø2" SUM Ø2" Ø2" SUM Ø2" Ø2" Ø2" Ø2" SUM Ø2" Ø2" Ø2"
Ø2" Ø2" SUM Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" B
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2"
Ø2"
Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2" Ø2" Ø2"
Ø2" Ø2" Ø2" Ø2"
L=
11
.0
0m
Ø Ø4"
4"
PV
C
S=
5 .0
0%
C Ø200 mm
FIERRO LISO Ø 3/8" TAPA DE CONCRETO FIERRO LISO Ø 3/8" TAPA DE CONCRETO
f'c=175kg/cm² f'c=175kg/cm²
.05 .05 .05 .05
DETALLE TAPA DE CAJA DE REGISTRO (12"x24") L 2"x2"x3/16" REBAJE L 2"x2"x3/16"
ESCALA 1/10 L 2"x2"x3/16" REBAJE L 2"x2"x3/16"
0.05
0.05
ASA FºGº Ø 3/8" AL RAS ASA FºGº Ø 3/8" AL RAS
DEL PISO TERMINADO B DEL PISO TERMINADO
PARED DE CONCRETO
TUERCA
0.05 0.05
TARRAJEO 1.5cm. PARED DE CONCRETO
TUERCA
MEZCLA 1:4 TARRAJEO 1.5cm.
ALTURA MEZCLA 1:4
VARIABLE ALTURA TUB. PVC-SAL Ø 4"
TUB. Ø4" PVC-SAL INGRESO
VARIABLE TUB. PVC-SAL Ø 4"
TUB. PVC-SAL Ø 4" TUB. PVC-SAL Ø 4" CONDUCCION DE
A A DESAGUE
ENLUCIDO 1:2
SALIDA
0.30
ENLUCIDO 1:2 A MEDIA CAÑA
0.1025 A MEDIA CAÑA
INGRESO SALIDA 0.05
0.05
0.05 0.05
0.15
0.15
TUB.EXIST. PV
DETALLE DE LA LOSA DE CONCRETO
CORTE A - A
BUZÓN
EXIST.
"T" en Subida
"T" en Bajada
PROV. : HUANTA