1B 199- 30 - 300 600 25 10 25 537.79 553 47.5 0.1958 0.156 426 498
2 - T 20
1B 199a 0 - T 0
0 - T 0
1B 204 30 8400 300 600 25 10 25 361.44 553 47.5 0.1316 0.156 454 0
0 - T 0
2 - T 16
1B 204a 30 8400 300 600 25 10 25 532.78 553 47.5 0.1939 0.156 426 474
1 - T 12
4 - T 25
1B 309 30 8400 230 700 25 10 32 1264 649 51 0.4349 0.156 500 3116
0 - T 0
Compression Tension DEFLECTION CHECKING
As' prov As? %As' prov Mf C As BAR As As prov As? %As prov M/bd2 fs Mf T Span/d l/d allow
2 - T 16
0 OK - 1.00 990 1030 OK 4.09 2.786 320.3 0.9 26 23.4
2 - T 20
1 - T 20
0 OK - 1.00 1691 1923 OK 13.70 4.312 293.2 0.84 26 21.8
2 - T 32
2 - T 20
0 OK - 1.00 1114 1257 OK 12.80 3.082 295.5 0.93 26 24.2
2 - T 20
3 - T 20
0 OK - 1.00 1138 1345 OK 18.15 3.140 282.1 0.95 20 19.0
2 - T 16
2 - T 20
0 OK - 1.00 1128 1257 OK 11.40 3.114 299.2 0.92 26 23.9
2 - T 20
1 - T 20
0 OK - 1.00 1856 1923 OK 3.59 4.614 321.8 0.78 26 20.3
2 - T 32
2 - T 20
0 OK - 1.00 1128 1257 OK 11.40 3.114 299.2 0.92 26 23.9
2 - T 20
3 - T 32
603 OK 43.36 1.13 2290 2413 OK 5.36 5.882 316.4 0.75 26 22.0
0 - T 0
3 - T 32
1608 OK 31.93 1.28 3123 3394 OK 8.69 8.182 306.7 0.71 26 23.6
2 - T 25
3 - T 32
603 OK 43.36 1.13 2290 2413 OK 5.36 5.882 316.4 0.75 26 22.0
0 - T 0
2 - T 25
0 OK - 1.00 1937 1585 Not Ok-18.18 2.856 407.4 0.7 26 18.2
3 - T 16
3 - T 32
0 OK - 1.00 2664 2815 OK 5.66 3.729 315.5 0.84 26 21.8
2 - T 16
2 - T 25
0 OK - 1.00 947 982 OK 3.67 1.515 321.5 1.09 26 28.3
0 - T 0
2 - T 32
0 OK - 1.00 1603 1810 OK 12.89 2.461 295.3 1 26 26.0
1 - T 16
2 - T 25
0 OK - 1.00 1092 1183 OK 8.32 1.730 307.7 1.09 26 28.3
1 - T 16
2 - T 16
0 OK - 1.00 479 515 OK 7.56 1.194 309.9 1.21 26 31.5
1 - T 12
3 - T 32
942 OK 52.05 1.16 2920 3041 OK 4.15 6.165 320.1 0.74 26 22.3
2 - T 20
3 - T 20
0 OK - 1.00 1503 1571 OK 4.51 3.369 318.9 0.86 26 22.4
2 - T 20
3 - T 32
628 OK 26.23 1.11 2811 3016 OK 7.29 5.873 310.7 0.75 26 21.6
3 - T 16
4 - T 20
0 OK - 1.00 1830 2061 OK 12.62 3.947 296 0.86 26 22.4
4 - T 16
3 - T 32
515 OK 8.70 1.09 2787 3041 OK 9.12 5.818 305.5 0.76 26 21.5
2 - T 20
4 - T 32
1963 Not Ok-36.99 1.30 5201 3217 Not Ok-38.15 13.048 538.9 0.51 26 17.2
- T
DEFLECTION CHECKING CRAKING
l/d deflection Bar Spacing
18.5 OK 52.67 OK
- - 73 OK
18.5 OK 50 OK
18.5 OK 34.5 OK
18.5 OK 50 OK
- - 73 OK
18.5 OK 50 OK
18.8 OK 67 OK
OK
- - 21 Not OK
18.8 OK 67 OK
12.9 OK 58 OK
OK
- - 50.5 OK
9.9 OK 180 OK
OK
- - 75 OK
9.9 OK 82 OK
15.2 OK 93 OK
OK
- - 23.5 Not OK
15.2 OK 32.5 OK
OK
- - 17.2 Not OK
Shear link
fcu fyv bv h Main Φ
Main No d As prov M V v100As/b(400/d)
vd vc T.3.8(fcu/25)^1/3 vc
30 250 300 750 25 4 701 1963 285 120.2 0.57 0.93 1.00 0.62 1.06 0.66
Hook Up
Reaction fy Ash BAR As As prov As? %As prov
3 - T 32
400 500 920 2413 OK 162.39
1 - T 0
Compression Tension
As' BAR As' As' prov As? %As' prov Mf C As BAR As As prov As? %As prov
0 - T 0 2 - T 20
2074.84 0 Not Ok -100.00 1.00 5001 2237 Not Ok -55.27
0 - T 0 2 - T 32
20%= 1000 0 - T 25
30%= 1500
50%= 2501
max s
0.5vc vc + 0.4 0.8√(fcu) @ 5 Case Dia no Asv sv <0.75d L max, x
0.33 < v 1.06 >v 4.38 > v 2 Min link 10 2 157 285 200 OK -779
Nos -3894
0T0 Case 3
0T0
x=-779m x=1566.4m
xs min s
L max, x sv L min, x
-779 311 250 1566.4
Nos 6265
<3 >1
fcu fyv bv h Main Φ Main No d As prov V v 100As/bvd (400/d) vc T.3.8
30 460 300 750 20 2 699 628 286 1.36 0.30 1.00 0.42
CASE 2
Maximum Spacing
Spacing, Sv
Assume Spacing
R10-500
CASE 3
Min Link
Spacing, Sv
Assume Spacing
(fcu/25)1/3 vc 0.5vc vc + 0.40.8√(fcu) @ 5 Case Dia no Asv
1.06 0.45 0.22 < v 0.85 < v 4.38 >v 3 Link Required 10 2 157
Depth, H = 750
Maximum Spacing = 524.3 < 0.75d Mainbar = = 20
Spacing, Sv = 572 mm Cover = = 25
Assume Spacing = 500 mm Link = = 10
Effective d = 705
Length, x = 1.96 m
Spacing, Sv = 250.2 mm
Assume = 125 mm
Spacing, Sv = 572 mm
Assume Spacing = 250 mm
sv
229
Beam Design Checking :
Singly Reinforcement
d = (h-Cover-ØLink-Øbar/2)
= 699 mm
K = M/bd2fcu
= 0.289 < K'=0.156 Doubly! Remark:
200 2T25
z = d[0.5+(0.25-K/0.9)^1/2] 230 2T32 Or 3T25
= ### d < 0.95d 300 3T32
400 5T32
As = M/0.95fyz
= ### mm2 10 12 16 20 25 32 Total
10% = ### mm2 0 2 0 0 0 2 1834 ###
3% = ### mm 2
z = d[0.5+(0.25-K'/0.9)^1/2]
= 0.78 d < 0.95d
As' = (K-K')fcubd2/0.95fy(d-d')
= 2807 10 12 16 20 25 32 Total
10% = 3088 mm 2 0 0 0 0 0 3 2413 Not Ok!
3% = 2891
As = (K'fcubd2/0.95fyz) + As'
= 5462 10 12 16 20 25 32 Total
10% = 6008 mm 2 0 0 0 0 0 6 4825 Not Ok!
3% = 5626 mm2
< 0.37 The Compression steel will
yield and the stress is equal to 0.95fy
Remark:
200 2T25
230 2T32 Or 3T25
300 3T32
400 5T32
INTERPOLATE
X = 211.31 kNm
INTERPOLATE