You are on page 1of 2
b wos OIL SIMMER HEAD PULLEY CENTERLINE 3 ssessssstannannnat L o EEE sol —h seEebeegeeeee ° ae 5 i = 1600 Et 4 le \sorro8 oF SruBe BELTLENGTH Ig THE MEASURED DISTANCE BETWEEN THE MOUNTING BELT LENGTH IS THE MEASURED lk PONT OF THE SKIMNER UNIT 70 THE oR DISTANCE BETWEEN THE CENTERLINE SURFACE OF THE WATER AT TS OF THE HEAD PULLEY 70 THE LOWEST PONT, THEN ADD 2 CENTERLINE OF THE TAL PULLEY. ee eH L le WATER AT ITs 1 PONT LOWEST POR an putey CENTERLINE | ob L a ABANAKI CORPORATION 7 el Mis OF Skinner Bot Length Layout rg =e Se a Ber Tong . = : 7 + z 7 58.00 GEAR REDUCER, T CENTERLINE \ eo0 MOTOR ot on) CENTERLINE HEAD PULLEY wast CENTERLINE S555" TUBING FOR LIQUID DISCHARGE SUPPLIED BY CUSTOMER MIN. 18° WALL, MAIN. 24° LG, vn 17:90 —| HEAD PULLEY CENTERLINE pe9] =e 2244 aang 25,38 16,00 Se 1600 ELT LENGTH DETERMINED e004 BY CUSTOMER 6° WIDE BELTS oe CTA. TOCTR OPTIONAL YOKE & TETHER (TETHEA NOT SHOWN) TAIL PULLEY TAlL PULLEY / CENTERLINE UL 887 options Tall PULLEY us RETAINER OVERALL WITAIL PUL [Fm F=== | ABANAKI CORPORATION 56.50 ™ 31601 Sammon (OVERALL W/TAIL PULLEYS & RETAINERS Oval Drawing on Sie RasanvOT iifuemone [==——T moe z T

You might also like