b
wos OIL SIMMER HEAD PULLEY
CENTERLINE
3 ssessssstannannnat L
o EEE
sol —h seEebeegeeeee
° ae 5 i =
1600 Et
4 le
\sorro8 oF
SruBe
BELTLENGTH Ig THE MEASURED
DISTANCE BETWEEN THE MOUNTING BELT LENGTH IS THE MEASURED lk
PONT OF THE SKIMNER UNIT 70 THE oR DISTANCE BETWEEN THE CENTERLINE
SURFACE OF THE WATER AT TS OF THE HEAD PULLEY 70 THE
LOWEST PONT, THEN ADD 2 CENTERLINE OF THE TAL PULLEY.
ee eH L le
WATER AT ITs
1 PONT
LOWEST POR an putey
CENTERLINE
|
ob L
a ABANAKI CORPORATION
7 el Mis OF Skinner
Bot Length
Layout rg
=e Se a Ber Tong .
= :
7 + z 758.00
GEAR REDUCER, T
CENTERLINE \ eo0
MOTOR ot on)
CENTERLINE HEAD PULLEY
wast CENTERLINE
S555" TUBING FOR
LIQUID DISCHARGE
SUPPLIED BY CUSTOMER
MIN. 18° WALL, MAIN. 24° LG,
vn 17:90 —|
HEAD PULLEY
CENTERLINE pe9]
=e 2244 aang 25,38
16,00 Se 1600
ELT LENGTH
DETERMINED
e004 BY CUSTOMER 6° WIDE BELTS
oe CTA. TOCTR
OPTIONAL
YOKE & TETHER
(TETHEA NOT SHOWN)
TAIL PULLEY TAlL PULLEY
/ CENTERLINE
UL 887 options
Tall PULLEY
us RETAINER
OVERALL WITAIL PUL [Fm F=== | ABANAKI CORPORATION
56.50 ™ 31601 Sammon
(OVERALL W/TAIL PULLEYS & RETAINERS Oval Drawing
on Sie RasanvOT
iifuemone [==——T moe
z T