JOB SAFETY ANALISYS FORM

Activity Installation UPS Work

Work Area : Romp 02

Tools & Equipment : Bor beton , vacuum cleaner, gerinda, tools set termination

Mandatory PPE : Safety Helmet, Safety Shoes, Safety HandGloves, Mask ,Uniform

Prepared by Reviewed by : Approved by :


Nama TTD
Nama TTD Nama TTD
1. ( HSE INDOKOMAS )
1. ( Subcont ) 1. ( HSE Subcont )
2.
2. 2.

Step of Work Hazard Identification Preventive Actions or Procedures


recommended
Describe the step of work Identification of hazards associated with each of these Determine what actions need to be taken to eliminate or minimize
work steps against the possibility of an accident hazards that can cause accidents, injuries or occupational diseases

Preparation (permit and supporting  Misunderstanding  Describe the work to be done clearly and communicate to all workers
document)Persiapan permit dan documen pendukung Kesalah pahaman involved.
 Document missing or not complete Penjelasan yg terang kpd semua crew pekerja yg terlibat
Documen terselip dan hilang  Get all the necessary document and d implement the standard practice
in accordance with rules.
Siapkan semua data yg penting danlakuakn pekerjaan sesuai dengan
peraturan dan procedure yg berlaku.

 Equipment failure  Toolbox meeting before starting the work.Toolbox sebelum mulai
Equipment and Personnel Preparation Kesalahan alat kerja.
Persiapan alat dan personnel.  Human Error  only the competent person will deployed .Hanya personnel yg

Page |1
JOB SAFETY ANALISYS FORM
Step of Work Hazard Identification Preventive Actions or Procedures
recommended
Describe the step of work Identification of hazards associated with each of these Determine what actions need to be taken to eliminate or minimize
work steps against the possibility of an accident hazards that can cause accidents, injuries or occupational diseases

Kesalahan pada personnel berkompeten yg boleh mengerjakan


 Make sure all the required tools available at working area.Mastikan
semua peralatan disiapkan di area kerja.
 Use the right tools for the right tools for the right job. Penggunaan alat
yg tepat untuk peruntukannya.

Install Connection Plates UPS Battery Terminal  Tripping and stumbling hazard. Tersandung dan jatuh  Keep away from pinch between area.HAti hati terjepit.
 Back Strain.Cidera pinggang  Only competent personnel will deployed .HAnya competent personel
Pinch in between.Terjepit yang mengerjakan tugas tsb.
Use the right tool for the right job.Gunakan alat yang tepat untuk
pekerjaan yang sesuai.

Tripping and stumbling hazard. Tersandung dan jatuh.  Protruding object must be eliminated. Benda menonjol segera di
Finishing and manual handling hilangkan.
 Max weight to be lifted per personis 1/3 weight. Maksimal beban yg
diangkat personil 1/3 dari berat badannya.

Housekeeping  Trip and fall hazard  Make sure the area is cleared after completion of the activity.Pastikan
Bahaya tersandung dan jatuh area bersih kembali setelah pekerjaan selesia
 Always be aware with any potential hazard on work area.Selalu
waspada terhadap kemungkinan bahaya yg terdapat di area kerja
Put all the tools in to their proper place.Simpan kembali peralatan pd
tempatnya