Qs
[
| aa . . JP/QP-015
JP Garment Ethiopia PLC | sop for Fusing Machine Released Date: July 13, 2023
Procedure Maintenance Revision : A/O
Page 1of1
. Always keep the machine clean. Use compressed air to remove
lose dust and threads before starting the machine.
. Do not place solid objects on the workbench and outer cover so as
not to tamper with the belts.
. At high temperature. In case of abrupt / unexpected shut down,
immediately use the manual rotating device to drive out the
material.
4. Replace the cleaning rod cloth.
aun
- Clean the conveyor belt regularly
. Regularly add high temperature lubricating oil to the transmission
parts and bearings of the machine monthly.
- When bonding super thick linings (the maximum thickness should
not exceed 3mm) Reduce the pressure approximately or release the
pressure.
- In the event of relocating the machine, ensure to adjust the level so
as to prevent uneven pressure or damage to the belt deviation.
- Equipped with pneumatic pressurized machine, the oil cap in the
filter cap must be lubricated with oil, the water cap must be
drained daily after work.
Prepared by: Approved by 2 Z
aly
Siow
pl: ?- 3