You are on page 1of 1

Project name:

Loo

A B C A B C

Water tank size to be decided as per site


location and then to be consulted with the
contractor for the Top Slab RCC detail
Water Tank (OHT) +2,940 T. O. Beam +2,940 T. O. Beam Legend:
1 Wash Basin - Half Pedestal

280

280
+2,660 T. O. Unfin. Slab +2,660 T. O. Unfin. Slab
2 WC - Wall Mounted with attached Flush Tank

150

150
+2,510 B. O. Beam +2,510 B. O. Beam

3 Urinal

255
257
+2,255 B. O. Unfin. Lintel

450
450
115mm
Brick wall 4 Bib Cock
+2,048 T. O. Sill

947

987
115 1,030 300 300 695
WP6
115 1,030 300 300 695
storage WP7
5 Angle Valve to Control Water Supply

505
505
6 (820 x 1100 x 3mm) Modiguard Mirror
8mm 5 5 8mm 5 5 8mm
8mm Groove
Groove 150 150 Groove 150 150 Groove

20
8
8
+1,523 T. O. Unfin. Lintel

125
+1,398 B. O. Unfin. Lintel

125
20
PP3 T. O. SB to Align T. O. SB to Align PP4 115mm

2,085

2,145
Brick wall
SB03 SB04
+
1,650

2,100

1,650
8mm Tile

1,400
1,400

1,156
storage

1,288
100 400 150 347 498 100 400 150 348 498
3 3

4 2 4 2 4 2 4 2
600

600
OUTLET OUTLET OUTLET OUTLET
430

430

430

430

12
25
15 MM DROP 15 MM DROP

+110 T. O. Beam +110 T. O. Beam

150

110
75
±0 Ground LvL ±0 Ground LvL

300
300
-190 T. O. Unfin. Sunk Slab -190 T. O. Unfin. Sunk Slab
SECTION 1 -315
SECTION 2 -315
B. O. Beam

125

125
135 1,600 1,600 135 135 1,600 1,600 135

A B C A B C

3 4

A B C

3,470

135 1,600 1,600 135


115
550mm Slab 20 115 20 1,445 20 230 20 995 20 20 450 550mm Slab
Overhang Overhang 2 1 2 1
550

T. O. Beam +2,940 T. O. Beam +2,940


100 400 795 150 150 348 498
WP 5
230 x 230mm T. O. Unfin. T. O. Unfin.
RCC Column Slab +2,660 Slab +2,660
20

20

SB05
B. O. Beam +2,510 B. O. Beam +2,510
3 4
230

230

2 2
550

550

WP4 WP4

450
Align to Door Lintel Align to Door Lintel
20

20

4 5
5 NT NT WP2 WP2
WP 6 WP 7
1
370

T. O. Sill +2,048 T. O. Sill +2,048


1,100

560

955
storage
695

4
75 storage
2
2
1,200
810

1 PP3 PP4

505
20
550

550

8mm 8mm
SB03

SB04

820 (W) x 1100 (H) x 820 x 1100 x 3mm


Groove 3mm Thk. Mirrror Groove Thk. Mirrror
230
0
2,070

1,800

3
20

1,150

1,150
120

2,100
120

1:
PE

8
O
SL
20

20
SL

T. O. SB
O

75 75
PE

to Align PP4
1:

6 6
20

475 475 25 450 25 450


0

2 15mm DROP 15mm DROP 2 SB04


700

700

700

2,100

2,100
3mm Thk. Mirror WP 3 WP 4 3mm Thk. Mirror PP1 B. O. SB PP2 B. O. SB
with installed with installed to Align to Align

1,800
1 1
with 3M Tape with 3M Tape SB01 SB02

150

150
1,400
6 6 695
20

20

1 1
270

230

230

350

350
1 1
1 2

850

850
20

SB01 SB02
25 75

600
20

800

800
2 2
75

430

430
PP1 PP2
15 MM DROP

450

450
WP 1 WP 2
T. O. Beam +110 T. O. Beam +110
450

45 cm Seating 45 cm Seating
Ground LvL ±0 Ground LvL ±0
T. O. Unfin.
1,275

T. O. Unfin.
150 -190 Sunk Slab -190
1,200

Sunk Slab
115mm Brick wall with B. O. Beam -315
829 829 External Plaster,
B. O. Beam -315
1800mm Height
SECTION 3 SECTION 4
1,800 1,800

1,657 155 1,658 2 1 2 1

A B C

PLAN LAYOUT 3 4

Notes : All Dimensions are in mm Legend (Civil): Brick Legend (Electrical): SB Switch Board
Title Dealt :
Drawing No.
Concrete (RCC)
PP
Plug Point
Toilet Layout - Checked :
A.1
Cement Plaster
Plan, Sections Scale : 1:20
Light Weight Filling Wall Point
WP
Date : 16/05/23

You might also like