Professional Documents
Culture Documents
A.05.9 Plan - Open Gym Simplified
A.05.9 Plan - Open Gym Simplified
Open Gym
Push up Bar
Open Gym
Chest Press + Shoulder
Exercise
Twister + Walker
Entrance
Road
Notes : The Installations of the Equipment has to be done as per the instructions mentioned in the Equipment Manual provided by the Manufacturer or the Vendor. The Foundation details (i.e. Footing, Anchoring, Screwing)
Legend (Civil): Brick Legend (Electrical): SB Switch Board
Title Dealt : Technical Support :
PP
for the equipment has to be followed as per the details provided by the Manufacturer. The Installation of the equipment has to be done with the coordination of the Site Engineer, Equipment Technician provided by Concrete (RCC)
Plug Point
Checked :
the Manufacturer / Vendor, Installation Technician & SHG. The responsibility of coordination of the installation of the Equipment has to be undertaken by the SHG responsible for the Project. Cement Plaster
Plan - Open Gym Scale : 1:50
Concrete (PCC) Light Weight Filling Wall Point
WP
Date : 13/07/23