You are on page 1of 2

6/12/23, 3:54 PM NFA Report - PDF

 
NFA Header
NFA No. HEL/SITE/CAPEX/696 NFA Date 2023-05-31 NFA Status APPROVED
Organization HEL Location SITE NFA Type CAPEX
Capex Category BUDGETARY Budgetary NFA No. Balance Amt 0.00
NFA Subject FRP scaffolding platform for 400 kV switchyard. Value Catg ABV_5L
PR No. PR Date Department Electrical and Instrumentation

Details
In 400 kV switchyard, during isolator or circuit breaker maintenance, the technicians have to climb
up the insulators to above 7 meters. Also, they need to stand in the insulators for hours to carry out
maintenance job. They use only belt ropes to tie themselves with the insulators to prevent falling
Requirement from height. But the risk of foot slipping and ultimately fall from height is very high since there is
no working platform. In some cases, scaffolding erection is must to carry out maintenance jobs. So,
we propose to procure FRP scaffolding for erecting safe working platform. It will reduce the risk of
falling from height.
We are procuring these materials for experimental purpose. If it becomes successful, then we will
Process Followed
procure more number of quantities.
Basis
 
Scope
Offered Negotiated
Srl Item Description Quantity UOM Amount(Rs.)
Price(Rs.) Price(Rs.)
FRP scaffolding platform for
1 2.00 SET 242185.00 242185.00 484370.00
switchyard
2 Movable Aluminium ladder 1.00 SET 82100.00 82100.00 82100.00
SUB TOTAL (Rs.) 566470.00
P&F (Rate/Value)(in %) 0.00 0.00
Freight (Rate/Value)(in %) 0.00 0.00
Pre-GST Other Rate (Rate/Value)(in %) 0.00 0.00
GST (% Rate) 18.00 101964.60
Post-GST Other Rate (Rate/Value)(in %) 0.00 0.00
TOTAL (Rs.) 668434.60
 
NFA Value 668434.60
 

Vendor and Related Terms


Payment Terms
Delivery/Completion
Period
Delivery Terms
Warranty/Guarantee
Terms
Proposed Vendor YOUNGMAN
 

Spend Table
Capex
HEL - ORDERS TOTAL SPEND FY 2023-2024
  Budgetary Actual
YTD 835.39 L 392.65 L
Current NFA 6.68 L 0.00 L

10.40.2.28:8080/onlinenfa/NFA_PDF.jsp 1/2
6/12/23, 3:54 PM NFA Report - PDF

Capex
Total (Rs.) 842.08 L 392.65 L
MTD 36.83 L 227.74 L
 
NFA Approval Hierarchy
Action Waiting for
Srl Position Name Action Date
Taken Referee
31-05-2023
0 INITIATOR SABYASACHI GHOSH Y N
12:35:52 PM
02-06-2023
1 RECOMMENDER ANUP KUMAR SAHA Y N
04:00:26 PM
03-06-2023
2 HOD DILIP BISUI Y N
09:49:16 AM
03-06-2023
3 O&M HEAD Mr. SUSOBHAN PATRA Y N
10:34:04 AM
03-06-2023
4 PLANT HEAD SOMNATH DUTTA Y N
10:42:41 AM
03-06-2023
5 V.P. MATERIALS JATIN DANI Y N
10:45:19 AM
6 G.M./HEAD NA N N
09-06-2023
7 Vice President [ Gen] OS. SNEHASIS SAMADDAR Y N
03:26:28 PM
09-06-2023
8 Sr.V.P & CFO SUBIR KUMAR SAHA Y N
04:25:16 PM
09-06-2023
9 M.D. RABI CHOWDHURY Y N
04:47:29 PM
 

Action Details with Comments


Srl Action Action Taken By Action Date Comment
1 SUBMIT SABYASACHI GHOSH 31-05-2023 12:35:52 PM Submitted NFA
2 APPROVE ANUP KUMAR SAHA 02-06-2023 04:00:26 PM
3 APPROVE DILIP BISUI 03-06-2023 09:49:16 AM
4 APPROVE Mr. SUSOBHAN PATRA 03-06-2023 10:34:04 AM
5 APPROVE SOMNATH DUTTA 03-06-2023 10:42:41 AM
6 APPROVE JATIN DANI 03-06-2023 10:45:19 AM
As discussed with Mr. Susovan Patra, please
7 REFER SNEHASIS SAMADDAR 03-06-2023 04:00:50 PM see other options with more flexibility and
faster execution
Considering jobs at multiple locations of
switchyard during annual overhauling we
8 RESPOND DILIP BISUI 09-06-2023 10:14:58 AM are exploring this option. We'll ensure
safety aspect during erection of this FRP
scaffolding
9 APPROVE SNEHASIS SAMADDAR 09-06-2023 03:26:28 PM
10 APPROVE SUBIR KUMAR SAHA 09-06-2023 04:25:16 PM
11 APPROVE RABI CHOWDHURY 09-06-2023 04:47:29 PM

10.40.2.28:8080/onlinenfa/NFA_PDF.jsp 2/2