Observation: Max. Applied Load (Ton) Gross Settlement (MM) Net Settlement (MM) Failure Condition
Observation: Max. Applied Load (Ton) Gross Settlement (MM) Net Settlement (MM) Failure Condition
CHAPTER 8
OBSERVATION
All Piles, STP-01 (TP-1) & STP-02 (TP-4) failed before the intended load (200% of
4 Ton). Details are presented in Table 8.1 below. Net settlement and allowable load by different
method are presented in Table 9.1 & Table 9.2
Table 8.1: Test piles and test results (Ref. Load Settlement Curves & Field Data)
CHAPTER 9
ANALYSIS OF TEST RESULT