BVBL/LAB/GEO/22/014

CHAPTER 8
OBSERVATION

All Piles, STP-01 (TP-1) & STP-02 (TP-4) failed before the intended load (200% of
4 Ton). Details are presented in Table 8.1 below. Net settlement and allowable load by different
method are presented in Table 9.1 & Table 9.2

Table 8.1: Test piles and test results (Ref. Load Settlement Curves & Field Data)

Pile Cross Test Result


Pile ID Length Section Max. Applied Gross Settlement Net Settlement Failure
(mm) (mm) Load (Ton) (mm) (mm) Condition

STP-01 (TP-1) 4500 300 4.1 46.92 42.95 Not


Adequate
STP-02 (TP-4) 4500 300 4.1 45.72 43.18 Not
Adequate

CHAPTER 9
ANALYSIS OF TEST RESULT

Table 9.1: Observed net settlement & ultimate load

Max. Test Net Settle Ultimate Load (Ton)


Pile ID Load (Ton) (mm) BNBC IS: 2911 Davisson Field Test

STP-01 (TP-1) 4.00 42.95 <8 <8 N/A <8


STP-02 (TP-4) 3.75 43.18 <7.5 <7.5 N/A <7.5