Final SIR Typical MUps

You might also like

You are on page 1of 6

In this guide we will look at typical mistakes engineers make when

composing a Final SIR (and filling out a CRM)

First, let's remember the rules for filling out the lines in the CRM

The Carrier column corresponds to our Carrier field, so select it


Carrier Site ID (4th column) = our Carrier Site Number
You can find the "Carrier Site Name" in the CD or Project Name on title page.
Tower Owner Site ID (column 3) = Client Site Number
"Client Site Name" also look in the CD
And lastly, in the PO Number field you need to write SES Project Number. This will
be entered by aTeam when creating a project, but in case you see an empty field
somewhere, please enter it)

Also, do not forget to write:


Project description, in our case - Final Statement of Special Inspections
The start/end date to work on the project
Reason for overtime, if any
Other data in this
Final Report for Special Inspections line does not need
to be changed.
State CPA No.:
Project Name: CSTMR Site: EXAMPLE -- 111111 / XXX Site: 111111
Project Location: 2222 Seward Rd, City, ST 11111

If we have just a word / site name, then


only the first letter is capitalized. If we have
an abbreviation example:ABCDS00149D,
then there should not be any changes

All abbreviations in the address must be


deciphered. See example.

Do self-check and verify the details the


customer has provided
Project Registered Design Professional in Responsible Charge:

Designer Name: Dmitriy Albul Ohio Registration No: E-76052


Company Name: Albul Engineering LLC

*Signature
Signature: *Stamp Date: 03/23/2023

Example of the
correct size of the Specify the actual date, which
signature and coincides with the date of
seal. delivery of the project to the
customer
PART III: FINAL APPROVAL OF WORK –CONDITIONS/LIMITATIONS

No. ITEM Date Conditions & Limitations Name of Inspector

Special cases:
1 03/23/2023 Installed as shown on inspection report dated 04/13/22. Dmitriy Albul
(1705.1.1 OBC)

Specify the actual date, which


coincides with the date on the
title page
We must replace this typical inscription with our own
There are two options for replacing the inscription.
1. When we have an extra file without comments
from inspectors
2. When we have an extra file with comments from
inspectors

1. Installed as shown in the as-built CD's dated xx/xx/xx.

2. Installed as shown in the as-built CD's dated xx/xx/xx.


Reference the comments under the table.*
EIFS system
16
(1705.16 OBC)
Fire resistance
17 penetrations/joints
(1705.17 OBC)
Smoke control
18 system testing
(1705.18 OBC)

Revised 04/02/2019

If we have the second case (see above), in that case


we need to add the comments we are referring to.
Now we have two variations of the annotation, it
depends on the inspection company. If the report was
produced by MUTI, then use option 1. If the report
was produced by Proventus, then use option 2

1
*The final approval of the work completed at subject site is based on the supplied initial inspection report
by Midwest Underground Technology, Inc dated ??/??/????. The Nonconforming Items from the
document were included in this report to address the final installation configuration and corrective actions
that are to be implemented to maintain the sufficiency of the supporting structure and its compliance with
the building codes and standards.
2
*The final approval of the work completed at the subject site is based on the supplied site visit report by
Proventus Structural Services, LLC dated ??/??/????. The Nonconforming Items and Annotated
Construction Drawings pages from the document were included in this report to address the final
installation configuration and corrective actions that are to be implemented to maintain the sufficiency of
the supporting structure and its compliance with the building codes and standards

* Don't forget to insert the report from the inspection company after the CD`s
SEQUENCE OF EVENTS:
1. REMOVE (3) THREE AHBCC AIRSCALE DUAL RRH 4T4R B5/B13
*For training purposes, all unnecessary information has been removed* 320W RRU, (3) THREE AHFIC AIRSCALE DUAL RRH 4T4R
B2/B66A 320W RRU, (3) THREE SBNHH 1D65C ANTENNA, (1)
ONE SPARE COAX AT 170' ELEVATION.

2. INSTALL (3) THREE BSAMNT-SBS-1-2 SIDE BY SIDE ANTENNA


MOUNTING BRACKETS (3) THREE RRU SWIVEL MOUNT, (3) THREE
B2/B66A RRH-BR049 RRUS, (3) THREE B5/B13 RRH-BR04C RRUS, (3)
CBRS RRH - RT4401-48A RRH, (3) THREE NHSS-65C-R2B ANTENNA,
PROPOSED OVP (3) THREE MT6407-77A ANTENNA, (1) ONE RCMDC-6627-PF-48 OVP,
(MOUNT PER MANUFACTURER'S (1) ONE HFT1206-24SV2-130 HYBRID CABLE AT 170' ELEVATION.
SPECS) (ENSURE THAT BRACKET
DOES NOT CONFLICT WITH EXISTING 3. INSTALL (1) ONE RCMDC-4520-RM-48 OVP AT GROUND
OR PROPOSED EQUIPMENT)

PROPOSED B5/B13
RRH-BR04C RRU

PROPOSED B2/B66A
RRH-BR049 RRU
PROPOSED
Often the final plan does not show all the equipment and
ANTENNA you need to guess what equipment is missing,
PROPOSED sometimes the name of the missing equipment can be
SAMSUNG found in this list
RT4401-48A RRU

EXISTING/PROPOSED REV. DESCRIPTION BY DATE


2-1/2" O.D. X 120" LONG
A PRELIM RC 05/21/21
IF REQUIRED TO
ACCOMMODATE 0 FINAL CD RC 06/17/21
PROPOSED
MOUNTING BRACKET

PROPOSED SWIVEL
MOUNT BRACKET
The comments for customer are colored RED

Check the equipment carefully, and compare it with the


Or sometimes the installers
photo. If you do not know what the Antenna, RRH/RRU,
may not remove the
DC,Dish, etc. looks like, then you can try to find the
equipment and the name
specification with photos on Sharepoint or on the
Pay attention to the proposed types of of the missing equipment
internet
mounts, they must match can be found on this view PROPOSED SWIVEL
MOUNT BRACKET (1 PER
SECTOR) (TYP. 3)
(TO
BE

M
RE

T6
G- 7-7
LO

40
NH

3 7A
CA

HS
G- -65
TE

S
2 R C-
(TO

D)

PROPOSED SIDE BY
)
BE

VED SIDE ANTENNA MOUNT R


A-2 C-R2B
EMO
RE

R2
As-built BE R (TYP. 3) (COMMSCOPE -65
MO

(TO S

B
S
NHH
VE

P/N:BSAMNT-SBS-1-2)
Albul Engineering, LLC
D)

FOR MOUNTING (2) 11.9"


WIDTH ANTENNAS
Dmitriy Albul TED
) A-3 77A
OCA 407
-
BE REL MT6
mm/dd/yyyy (TO

*Signature
Specify the actual date, which
coincides with the date on the
title page
PROPOSED B2/B66A

MT6407-77A
(TO BE RELOCATED)

Don't forget to add "As-built" RRH-BR049 RRU (1


(TO BE REMOVED)

NHHSS-65C-R2B
PER SECTOR) (TYP. 3)

B-3
*Try to keep the size as large PROPOSED B5/B13 DATE DRAWN:
TO BE REMOVED (1

B-2R
as possible PER SECTOR) (TYP. 3) PROPOSED
RRH-BR04C RRU (1
PER SECTOR) (TYP. 3)
ATC JOB NO:
RCMDC-6627-PF-48 OVP CUSTOMER ID:

TO BE CUSTOMER #:
PROPOSED
REMOVED (1 PER SECTOR) RT4401-48A RRU (1
(TYP. 3) PER SECTOR) (TYP. 3)
EXISTING TOWER PLAN FINAL TOWER PLAN TOWER ELEVATION AND
* Do not forget to insert the 4 SCALE: N.T.S.
5 SCALE: N.T.S.
ANTENNA INSTALLATION
report from the inspection
company after the CD`s, if NEXT, I WILL SHOW EXAMPLES OF HOW TO MAKE THE COMMENTS SHEET NUMBER: REVISION:

there is a report
C-101 0