Final SIR Typical MUps
Final SIR Typical MUps
Final SIR Typical MUps
First, let's remember the rules for filling out the lines in the CRM
*Signature
Signature: *Stamp Date: 03/23/2023
Example of the
correct size of the Specify the actual date, which
signature and coincides with the date of
seal. delivery of the project to the
customer
PART III: FINAL APPROVAL OF WORK –CONDITIONS/LIMITATIONS
Special cases:
1 03/23/2023 Installed as shown on inspection report dated 04/13/22. Dmitriy Albul
(1705.1.1 OBC)
Revised 04/02/2019
1
*The final approval of the work completed at subject site is based on the supplied initial inspection report
by Midwest Underground Technology, Inc dated ??/??/????. The Nonconforming Items from the
document were included in this report to address the final installation configuration and corrective actions
that are to be implemented to maintain the sufficiency of the supporting structure and its compliance with
the building codes and standards.
2
*The final approval of the work completed at the subject site is based on the supplied site visit report by
Proventus Structural Services, LLC dated ??/??/????. The Nonconforming Items and Annotated
Construction Drawings pages from the document were included in this report to address the final
installation configuration and corrective actions that are to be implemented to maintain the sufficiency of
the supporting structure and its compliance with the building codes and standards
* Don't forget to insert the report from the inspection company after the CD`s
SEQUENCE OF EVENTS:
1. REMOVE (3) THREE AHBCC AIRSCALE DUAL RRH 4T4R B5/B13
*For training purposes, all unnecessary information has been removed* 320W RRU, (3) THREE AHFIC AIRSCALE DUAL RRH 4T4R
B2/B66A 320W RRU, (3) THREE SBNHH 1D65C ANTENNA, (1)
ONE SPARE COAX AT 170' ELEVATION.
PROPOSED B5/B13
RRH-BR04C RRU
PROPOSED B2/B66A
RRH-BR049 RRU
PROPOSED
Often the final plan does not show all the equipment and
ANTENNA you need to guess what equipment is missing,
PROPOSED sometimes the name of the missing equipment can be
SAMSUNG found in this list
RT4401-48A RRU
PROPOSED SWIVEL
MOUNT BRACKET
The comments for customer are colored RED
M
RE
T6
G- 7-7
LO
40
NH
3 7A
CA
HS
G- -65
TE
S
2 R C-
(TO
D)
PROPOSED SIDE BY
)
BE
R2
As-built BE R (TYP. 3) (COMMSCOPE -65
MO
(TO S
B
S
NHH
VE
P/N:BSAMNT-SBS-1-2)
Albul Engineering, LLC
D)
*Signature
Specify the actual date, which
coincides with the date on the
title page
PROPOSED B2/B66A
MT6407-77A
(TO BE RELOCATED)
NHHSS-65C-R2B
PER SECTOR) (TYP. 3)
B-3
*Try to keep the size as large PROPOSED B5/B13 DATE DRAWN:
TO BE REMOVED (1
B-2R
as possible PER SECTOR) (TYP. 3) PROPOSED
RRH-BR04C RRU (1
PER SECTOR) (TYP. 3)
ATC JOB NO:
RCMDC-6627-PF-48 OVP CUSTOMER ID:
TO BE CUSTOMER #:
PROPOSED
REMOVED (1 PER SECTOR) RT4401-48A RRU (1
(TYP. 3) PER SECTOR) (TYP. 3)
EXISTING TOWER PLAN FINAL TOWER PLAN TOWER ELEVATION AND
* Do not forget to insert the 4 SCALE: N.T.S.
5 SCALE: N.T.S.
ANTENNA INSTALLATION
report from the inspection
company after the CD`s, if NEXT, I WILL SHOW EXAMPLES OF HOW TO MAKE THE COMMENTS SHEET NUMBER: REVISION:
there is a report
C-101 0