You are on page 1of 1

0 m

1 ,60
ch .

0 0m
5
ch .1,

ch.1,300m
00m
, 4
c h.1

m
, 300 ch.1,200m
1
ch.

00m
1,2 ch.1,100m
ch.

00m
1, 1
c h .
ch.1,000m

0m
.1 ,00 15
,5
ch
ch.900m
0
16

m
. 900
40 ch

ch.800m

00m
ch.8

ch.700m

0m
h . 70
c

ch.600m
0m
h . 60
c

m ch.500m
5 00
ch.

m
. 400 ch.400m
ch

00m
3
ch. ch.300m

Project Title Drawing Title Contractor General Note Legend Drawing No. Drawing By.
N 1. Survey Positioning by Trimble SPS986 RTK Rover

2. Acquisition Depth by Echotrac CV-100 SBES Teledyne Countor Line Scale 1 : 5000 Checked By.
3. Depth are referenced to Mean Sea Level (MSL)
BATHYMETRIC SURVEY WAKACHIKU Depth by Echotrac CV-100 SBES Teledyne
Page 1 of 1 Aproved By.
SINKER LOCATION Sub Contractor 4. Coastline detail are indicative only

5. All measurement are in meter and decimeter below MSL


Survey Date Surveyed By.
6. Coordinate are in DGN 95
21 June 2021
1:5

Slope 1 : 5
Slope
31.0m

SECTION CH.900
2020
May 2019

Bahari
April

Section siltation
Original Dredged
Timur
100

Remarks
06
04
1.
2.
3.
5.
4.
th

10 KHz
KHz
(1-3)
(1-4)

Elevation Diff.
N

SECTION CH.500 SECTION CH.500


Slope 1 : 5

Slope 1 : 5

Slope 1 : 5

Slope 1 : 5
Remarks
2020
July 2019

Timur Bahari

2020
July 2019

Bahari
100 KHz

Remarks
April
(1-3)
(1-4)
09
04
1.
2.
3.
5.
4.
th

Elevation
Section
Original Diff.
siltation
Dredged
10 KHz

April
(1-3)
(1-4)
09
04
1.
2.
3.
5.
4.

Elevation
Section
Original Diff.
siltation
Dredged
Timur
th

100
10 KHz
KHz

ch.1,600m
ch.1,500m

ch.1,400m

ch.1,300m

ch.1,200m

ch.1,100m

ch.1,000m
15,5
40

160

ch.900m
ch.1,300m

ch.800m
ch.1,200m

Width required for TSHD U-turn


160

ch.700m ch.1,100m Ch 900


A=148
A=230
m

-4.8
40

-5.5
-6.2
2

-4.7 M.S.L -6.0m 15,5 -6.2 M.S.L -13.00m

ch.1,000m
160

ch.600m Ch 800
A=205
m

-4.2
40

-6.1
-6.3
2

-4.3 M.S.L -6.0m 15,5 -5.9 M.S.L -12.691m

A=123
m
ch.900m

160

ch.500m Ch 600
A=141
m

40

-6.3
-6.2
2

-3.7 -4.0 15,5 -5.3

A=190
m


2

M.S.L -6.0m M.S.L -12.381m


ch.800m

160

Ch 600
40
2

15,5

ch.700m A=179
A=219
m

-6.1
-6.2
2

-3.2 -3.3 M.S.L -6.0m -4.3 M.S.L -12.077m


160

ch.300mch.400m Ch 500
40

15,5

ch.600m A=171
A=277
m

-6.0
2

-2.7 -2.8 M.S.L -6.0m -4.3 M.S.L -11.772m

ch.200m
ch.500m

ch.100m
ch.400m
ch.300m

ch.200m

ch.100m

N. 0
E. 9 368
237 006
268
7

PN. 1 042
PE. 337 700
000

TP.01(SWI)
MUSHOLA

You might also like