You are on page 1of 17

 

Cliente:
Parque Eólico Kukulkan 
 
 
Proyecto:
P.E. Kukulkan 600 MW 
 
 
 
Documento:
 
Estudio de Factibilidad de Interconexión 
 
Código de Documento N.A. 
Rev. Fecha Motivo emisión Creado Revisado Aprobado
00  06.Ago.2020  Informativo  M.J.G.  M.J.G.  C.E.R.B. 
 

Ciudad de México, México.


 

Contenido
 
Introducción ..................................................................................................... 3 

Objetivo ........................................................................................................... 4 

Desarrollo ........................................................................................................ 5 

Alcance del Estudio .......................................................................................... 6 

Conclusiones .................................................................................................. 15 

Electrical Global Engineering S.A. de C.V. Avenida San José # 120, Tlalnepantla Estado de México, C.P. 54180. Cel. 
5540222470, Tel. 44345817 electricalglobal@gmail.com 
 

Introducción
 

Actualmente PE Kukulkán se encuentra en desarrollo de una nueva planta de generación de energía 
eléctrica  con  tecnología  eólica,  la  cual  contara  con  una  potencia  de  600  MW  en  el  punto  de 
interconexión (PI). La nueva planta se ubicará en los límites del poblado Kantunilkin en el estado de 
Quintana Roo, México. 

En  las  cercanías  del  proyecto  (Polígono  en  Líneas  Rojas)  se  localizan  líneas  de  transmisión  en 
diferentes niveles de tensión 115 kV (No forman parte del presente estudio), 230 y 400 kV (Diagonal 
en  color  Amarillo  y  Azul,  respectivamente)  las  cuales  serán  utilizadas  para  la  interconexión  del 
proyecto eólico y poder evacuar la energía generada por el proyecto, el nivel de tensión se definirá 
del presente estudio. 

 
Implantación General de Infraestructura 

 
 

Electrical Global Engineering S.A. de C.V. Avenida San José # 120, Tlalnepantla Estado de México, C.P. 54180. Cel. 
5540222470, Tel. 44345817 electricalglobal@gmail.com 
 

Objetivo
 

El  objetivo  del  presente  estudio  es  analizar  las  características  técnicas  en  que  se  encuentra 
actualmente la red nacional de transmisión, lo anterior con la con la finalidad evaluar el impacto de 
la interconexión de una planta eólica con una potencia de 600 MW y definir las posibles obras de 
refuerzo requeridas para la interconexión de dicha planta. 

A continuación, se enlistan los principales casos de estudio: 

1. Interconexión de dos plantas de 300 MW en una línea de 230 kV 2 circuitos (300 MW en 
cada circuito). 
 
2. Interconexión de una planta de 600 MW en una línea de 230 kV 1 circuito. 
 
3. Interconexión de dos plantas de 300 MW en una línea de 400 kV 2 circuitos (300 MW en 
cada circuito). 
 
4. Interconexión de una planta de 600 MW en una línea de 400 kV 1 circuito. 

 
 

Electrical Global Engineering S.A. de C.V. Avenida San José # 120, Tlalnepantla Estado de México, C.P. 54180. Cel. 
5540222470, Tel. 44345817 electricalglobal@gmail.com 
 

Desarrollo
 

Para el estudio se analizaron las condiciones de demanda para el año 2022, y se parte de un caso en 
el  cual  el  flujo  de  potencia  que  entra  a  la  zona  de  la  Riviera  Maya  y  Cancún  alcanza  el  límite 
establecido por CENACE que es de 800 MW en el corredor que conforman las líneas mostradas en 
el diagrama (Ver figura 1) del caso inicial.  

En el diagrama del caso inicial se presenta en forma esquemática y general, la topología del área de 
influencia donde se pretende interconectar el proyecto de generación. 

Posterior a la interconexión de la central se dibujan dos cortes, para visualizar el límite de 800 MW 
pre y post interconexión de la central. 

Para la interconexión de la central en la red de 230 y 400 kV se tomó en cuenta la ubicación física 
del proyecto, quedando está a 107 km de la S.E. VAD, a 58 km de la S.E. BLM, a 45 km de la S.E. NIZ 
y a 60 km de la S.E. RMY. 

Dado que no se cuentan con los parámetros del proyecto se realizó un estimado del consumo de 
potencia reactiva que tendrá dicha central, por lo que los niveles de tensión en la zona de influencia 
podrían variar. 

A continuación, se enlistan los diferentes escenarios para analizar en el presente estudio: 

 El caso 1; Contempla la interconexión de una central eólica que genera 300 MW entre las 
líneas de 230 kV que van desde S.E. VAD a S.E. BLM y desde S.E. VAD a S.E. NIZ.  
 
 El caso 2; Contempla la interconexión de una central eólica que genera 600 MW entre las 
líneas de 230 kV que van desde S.E. VAD a S.E. BLM y desde S.E. VAD a S.E. NIZ. 
 
 El caso 3; Contempla la interconexión de una central eólica que genera 300 MW entre las 
líneas de 400 kV que van desde S.E. DZT a S.E. RMY.  
 
 El caso 4; Contempla la interconexión de una central eólica que genera 600 MW entre las 
líneas de 400 kV que van desde S.E. DZT a S.E. RMY. 
 

 
 

Electrical Global Engineering S.A. de C.V. Avenida San José # 120, Tlalnepantla Estado de México, C.P. 54180. Cel. 
5540222470, Tel. 44345817 electricalglobal@gmail.com 
 

Alcance del Estudio


 

En base al manual de interconexión de centrales eléctricas se realiza un análisis en estado estable 
en condiciones de red completa y ante contingencias sencillas, a fin de determinar la existencia de 
alguna violación a los limites operativos así como restricciones que pudieran afectar la confiabilidad 
del  SEN.  De  igual  forma  se  realiza  el  análisis  de  cortocircuito  para  identificar  violaciones  a  la 
capacidad interruptiva de los equipos del área de influencia. 

 Análisis de Red Completa

El  análisis de red  completa se  realiza  con  base en  las condiciones operativas de la  categoría A  “ 


Desempeño del sistema eléctrico bajo condiciones normales (Sin contingencia)”, establecidos en el 
Manual de Interconexión de planeación del código de red, se analiza la incorporación del proyecto 
PE  Kukulkán  a  la  RNT  considerando  las  CE  y  CC  en  operación,  los  proyectos  de  interconexión  y 
conexión con prelación, expansión de la red y los pronósticos de demanda esperados para los años 
de estudio para evaluar el cumplimiento en dicha categoría y en caso contrario determinar las obras 
de refuerzo necesarias para dar cumplimiento. 

 Análisis de Contingencias

El  análisis  de contingencias  se realiza con base en las condiciones operativas de la  categoría B  “ 


Desempeño del sistema eléctrico posterior a la falla de un elemento o equipo de la red (Criterio N‐
1)”,  establecidos  en  el  Manual  de  Interconexión  de  planeación  del  código  de  red,  se  analiza  la 
incorporación  del  proyecto  PE  Kukulkán  a  la  RNT  considerando  las  CE  y  CC  en  operación,  los 
proyectos  de  interconexión  y  conexión  con  prelación,  expansión  de  la  red  y  los  pronósticos  de 
demanda esperados para los años de estudio para evaluar el cumplimiento en dicha categoría y en 
caso contrario determinar las obras de refuerzo necesarias para dar cumplimiento. 

 
 

Electrical Global Engineering S.A. de C.V. Avenida San José # 120, Tlalnepantla Estado de México, C.P. 54180. Cel. 
5540222470, Tel. 44345817 electricalglobal@gmail.com 
CASO INICIAL
Figura No. 1
Tabla de contingencias Caso inicial

LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ RMY DZT ‐ RMY VAD AT7
MVA MVA
LT VAD 93050 BLM 420 164.71 0.00 235.14 187.60 173.29 164.71 184.03
LT VAD 93070 NIZ 420 161.47 239.42 0.00 189.10 171.12 161.47 182.14
LT KNP 93080 VAD 320 76.72 119.31 123.49 0.00 58.87 76.72 129.64
LT DZT A3Q70 RMY 1380 186.32 213.62 216.42 159.44 0.00 186.32 60.32
LT DZT A3Q60 RMY 1380 186.32 213.62 216.42 159.44 341.09 186.32 60.32
LT TZM 73T50 PPH 120 30.92 42.68 39.98 30.93 33.55 30.92 13.82
LT VAD 73830 TUM 120 52.16 62.87 64.25 56.35 54.88 52.16 27.45
LT VAD 73T40 CEX 120 30.94 44.06 43.20 33.95 33.18 30.94 8.27
VAD AT7 160 94.80 136.77 136.80 121.81 94.65 94.80 0.00

LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ RMY DZT ‐ RMY VAD AT7
VOLTAJES NODALES KV kV
VAD‐230 240/218 235.15 234.13 233.98 234.27 234.58 235.15 234.95
KNP‐230 240/218 233.82 233.19 233.18 233.28 233.08 233.82 233.45
DZT‐400 420/380 415.60 413.40 413.88 415.86 407.81 415.60 414.61
TZM‐115 120/110 114.99 113.99 114.13 114.61 114.51 114.99 115.12
VAD‐115 120/110 115.67 115.15 115.14 115.39 115.25 115.67 115.26
BLM‐230 240/218 232.21 231.11 231.11 231.73 231.07 232.21 232.17
NIZ‐230 240/218 233.73 232.19 233.19 233.34 231.44 233.73 234.05
RMY‐400 420/380 411.63 409.06 409.84 411.82 400.85 411.63 414.61
PPH‐115 120/110 114.98 113.85 114.09 114.72 114.51 114.98 115.38
TUM‐115 120/110 113.59 112.30 112.39 113.20 111.77 113.59 114.61
CEX‐115 120/110 115.79 114.96 114.98 115.49 115.41 115.79 115.84
CASO 1. CE 300 MW en 230 kV 
Tabla de contingencias Caso 1

LIMITE CASO INICIAL VAD ‐ KUK VAD ‐KUK KUK ‐ BLM KUK ‐ NIZ KNP ‐ VAD DZT ‐ RMY DZT ‐ RMY VAD AT7
MVA MVA
LT VAD 93050 KUK 420 110.95 0.00 178.18 83.97 71.68 160.94 114.79 114.79 148.40
LT VAD 93070 KUK 420 110.95 178.18 0.00 83.97 71.68 160.94 114.79 114.79 148.40
LT KUK 93XX0 BLM 420 245.06 227.04 227.04 0.00 442.05 283.03 248.26 248.26 277.39
LT KUK 93XX0 NIZ 420 273.84 248.97 248.97 466.02 0.00 333.82 278.22 278.22 315.00
LT VAD 93080 KNP 320 155.53 178.08 178.08 181.39 197.65 0.00 147.15 147.15 201.45
LT DZT A3Q70 RMY 1380 92.64 105.85 105.85 108.55 120.61 42.68 0.00 162.92 92.11
LT DZT A3Q60 RMY 1380 92.64 105.85 105.85 108.55 120.61 42.68 162.92 0.00 92.11
LT TZM 73T50 PPH 120 26.34 31.38 31.38 35.82 32.49 26.66 27.61 27.61 7.68
LT VAD 73830 TUM 120 57.09 62.61 62.61 121.81 68.10 65.56 58.47 58.47 29.10
LT VAD 73T40 CEX 120 30.48 36.59 36.59 35.57 40.43 36.78 31.61 31.61 4.87
VAD AT7 160 121.69 142.12 142.12 142.12 157.22 176.17 121.92 121.92 0.00

LIMITE CASO INICIAL VAD ‐ KUK VAD ‐KUK KUK ‐ BLM KUK ‐ NIZ KNP ‐ VAD DZT ‐ RMY DZT ‐ RMY VAD AT7
VOLTAJES NODALES KV kV
VAD‐230 240/218 236.37 235.73 235.73 235.79 235.49 235.08 235.94 235.94 235.85
KNP‐230 240/218 233.92 233.54 233.54 233.42 233.23 233.38 233.30 233.30 233.53
DZT‐400 420/380 418.34 417.76 417.76 416.81 417.42 417.67 411.56 411.56 417.81
TZM‐115 120/110 116.20 115.75 115.75 115.46 115.45 115.08 115.87 115.87 116.24
VAD‐115 120/110 116.24 115.95 115.95 115.88 115.76 115.53 115.92 115.92 115.58
BLM‐230 240/218 232.11 231.72 231.72 230.91 230.34 230.86 231.03 231.03 231.31
NIZ‐230 240/218 233.58 233.22 233.22 231.77 233.37 232.25 231.53 231.53 232.77
RMY‐400 420/380 413.88 413.23 413.23 411.88 412.98 412.85 403.86 403.86 413.18
PPH‐115 120/110 115.75 115.33 115.33 114.89 115.01 115.00 115.41 115.41 115.94
TUM‐115 120/110 113.74 113.18 113.18 112.81 112.72 112.56 112.13 112.13 114.31
CEX‐115 120/110 116.25 115.85 115.85 115.69 115.57 115.51 115.97 115.97 116.10
AKD‐115 120/110 113.32 112.91 112.91 112.50 112.62 112.39 111.45 111.45 113.56
CASO 2. CE 600 MW en 230 kV 
Tabla de contingencias Caso 2

LIMITE CASO INICIAL VAD ‐ KUK VAD ‐KUK KUK ‐ BLM KUK ‐ NIZ KNP ‐ VAD DZT ‐ RMY DZT ‐ RMY VAD AT7
MVA MVA
LT VAD 93050 KUK 420 61.97 0.00 99.28 26.34 7.76 136.54 60.49 60.49 107.08
LT VAD 93070 KUK 420 61.97 99.28 0.00 26.34 7.76 136.54 60.49 60.49 107.08
LT KUK 93XX0 BLM 420 326.08 315.94 315.94 0.00 613.22 383.32 325.40 325.40 365.28
LT KUK 93XX0 NIZ 420 397.14 383.25 383.25 652.19 0.00 485.25 394.37 394.37 446.58
LT VAD 93080 KNP 320 228.56 241.46 241.46 263.69 289.74 0.00 230.90 230.90 283.73
LT DZT A3Q70 RMY 1380 23.76 21.69 21.69 20.29 39.60 86.92 0.00 24.37 21.67
LT DZT A3Q60 RMY 1380 23.76 21.69 21.69 20.29 39.60 86.92 24.37 0.00 21.67
LT TZM 73T50 PPH 120 21.77 24.60 24.60 34.45 30.73 22.25 21.55 21.55 0.86
LT VAD 73830 TUM 120 60.58 63.69 63.69 121.81 76.46 72.93 60.75 60.75 27.24
LT VAD 73T40 CEX 120 29.88 33.35 33.35 32.13 44.19 38.77 29.59 29.59 5.20
VAD AT7 160 145.54 157.16 157.16 157.13 197.38 225.94 146.38 146.38 0.00

LIMITE CASO INICIAL VAD ‐ KUK VAD ‐KUK KUK ‐ BLM KUK ‐ NIZ KNP ‐ VAD DZT ‐ RMY DZT ‐ RMY VAD AT7
VOLTAJES NODALES KV kV
VAD‐230 240/218 236.37 235.73 235.73 235.79 235.49 235.08 235.94 235.94 235.85
KNP‐230 240/218 233.92 233.54 233.54 233.42 233.23 233.38 233.30 233.30 233.53
DZT‐400 420/380 418.34 417.76 417.76 416.81 417.42 417.67 411.56 411.56 417.81
TZM‐115 120/110 116.20 115.75 115.75 115.46 115.45 115.08 115.87 115.87 116.24
VAD‐115 120/110 116.24 115.95 115.95 115.88 115.76 115.53 115.92 115.92 115.58
BLM‐230 240/218 232.11 231.72 231.72 230.91 230.34 230.86 231.03 231.03 231.31
NIZ‐230 240/218 233.58 233.22 233.22 231.77 233.37 232.25 231.53 231.53 232.77
RMY‐400 420/380 413.88 413.23 413.23 411.88 412.98 412.85 403.86 403.86 413.18
PPH‐115 120/110 115.75 115.33 115.33 114.89 115.01 115.00 115.41 115.41 115.94
TUM‐115 120/110 113.74 113.18 113.18 112.81 112.72 112.56 112.13 112.13 114.31
CEX‐115 120/110 116.25 115.85 115.85 115.69 115.57 115.51 115.97 115.97 116.10
AKD‐115 120/110 113.32 112.91 112.91 112.50 112.62 112.39 111.45 111.45 113.56
CASO 3. CE 300 MW en 400 kV 
Tabla de contingencias Caso 3

LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ KUK DZT ‐ KUK KUK ‐ RMY KUK ‐ RMY VAD AT7
MVA MVA
LT VAD 93050 BLM 420 153.06 0.00 217.30 183.40 155.02 155.02 156.22 156.22 181.42
LT VAD 93070 NIZ 420 146.18 219.09 0.00 182.73 148.13 148.13 149.82 149.82 177.62
LT VAD 93080 KNP 320 104.07 144.34 147.10 0.00 99.80 99.80 97.19 97.19 139.66
LT KUK A3XX0 RMY 1380 200.52 226.31 227.85 164.48 199.36 199.36 0.00 392.34 200.06
LT KUK A3XX0 RMY 1380 200.52 226.31 227.85 164.48 199.36 199.36 392.34 0.00 200.06
LT DZT A3Q70 KUK 1380 50.56 76.43 77.94 14.49 99.90 0.00 46.67 46.67 50.09
LT DZT A3Q60 KUK 1380 50.56 76.43 77.94 14.49 0.00 99.90 46.67 46.67 50.09
LT TZM 73T50 PPH 120 27.17 38.31 35.54 27.07 27.77 27.77 28.15 28.15 12.37
LT VAD 73830 TUM 120 48.43 58.43 59.45 121.81 49.13 49.13 49.47 49.47 26.38
LT VAD 73T40 CEX 120 28.01 40.28 39.19 38.18 28.56 28.56 28.83 28.83 7.43
VAD AT7 160 95.96 135.11 134.15 134.15 96.02 96.02 95.90 95.90 0.00

LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ KUK DZT ‐ KUK KUK ‐ RMY KUK ‐ RMY VAD AT7
VOLTAJES NODALES KV kV
VAD‐230 240/218 236.40 235.55 235.47 235.54 236.13 236.13 236.23 236.23 236.06
KNP‐230 240/218 233.72 233.16 233.16 233.01 233.33 233.33 233.56 233.56 233.48
DZT‐400 420/380 411.79 410.22 410.58 411.62 407.73 407.73 409.84 409.84 411.48
TZM‐115 120/110 116.23 115.36 115.51 115.68 116.02 116.02 116.10 116.10 116.08
VAD‐115 120/110 116.19 115.76 115.77 115.86 115.99 115.99 116.07 116.07 115.41
BLM‐230 240/218 232.21 230.93 231.19 231.63 231.60 231.60 231.84 231.84 231.73
NIZ‐230 240/218 233.11 231.70 232.39 232.60 231.82 231.82 232.37 232.37 232.65
RMY‐400 420/380 406.82 404.76 405.33 406.73 400.48 400.48 403.28 403.28 406.41
PPH‐115 120/110 115.74 114.74 115.00 115.39 115.54 115.54 115.60 115.60 115.85
TUM‐115 120/110 113.40 112.32 112.40 112.90 112.41 112.41 112.81 112.81 113.61
CEX‐115 120/110 116.27 115.58 115.62 115.91 116.10 116.10 116.15 116.15 115.96
AKD‐115 120/110 112.64 111.74 111.87 112.28 111.48 111.48 111.96 111.96 112.69
CASO 4. CE 600 MW en 400 kV 
LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ KUK DZT ‐ KUK KUK ‐ RMY KUK ‐ RMY VAD AT7
MVA MVA
LT VAD 93050 BLM 420 140.20 0.00 197.31 178.91 137.71 137.71 143.59 143.59 168.81
LT VAD 93070 NIZ 420 130.19 196.88 0.00 176.76 126.68 126.68 134.12 134.12 161.89
LT VAD 93080 KNP 320 132.07 168.92 170.31 0.00 137.46 137.46 124.62 124.62 167.83
LT KUK A3XX0 RMY 1380 219.88 243.27 243.99 173.78 225.26 225.26 0.00 430.14 219.40
LT KUK A3XX0 RMY 1380 219.88 243.27 243.99 173.78 225.26 225.26 430.14 0.00 219.40
LT DZT A3Q70 KUK 1380 80.91 58.25 57.30 126.82 160.54 0.00 87.09 87.09 81.48
LT DZT A3Q60 KUK 1380 80.91 58.25 57.30 126.82 0.00 160.54 87.09 87.09 81.48
LT TZM 73T50 PPH 120 23.13 33.33 30.58 23.01 22.35 22.35 24.19 24.19 8.22
LT VAD 73830 TUM 120 44.30 53.45 54.11 121.81 43.61 43.61 45.45 45.45 22.16
LT VAD 73T40 CEX 120 24.84 36.05 34.76 33.67 24.28 24.28 25.71 25.71 4.94
VAD AT7 160 96.68 132.50 130.64 130.64 96.94 96.94 96.61 96.61 0.00

LIMITE CASO INICIAL VAD ‐ BLM VAD ‐NIZ VAD ‐ KNP DZT ‐ KUK DZT ‐ KUK KUK ‐ RMY KUK ‐ RMY VAD AT7
VOLTAJES NODALES KV kV
VAD‐230 240/218 236.43 235.62 235.56 235.48 236.19 236.19 236.27 236.27 236.09
KNP‐230 240/218 233.44 232.91 232.92 232.65 233.00 233.00 233.27 233.27 233.19
DZT‐400 420/380 411.01 409.98 410.28 410.03 407.27 407.27 408.82 408.82 410.68
TZM‐115 120/110 116.25 115.48 115.62 115.44 116.06 116.06 116.13 116.13 116.12
VAD‐115 120/110 116.20 115.83 115.84 115.76 116.02 116.02 116.08 116.08 115.42
BLM‐230 240/218 232.28 231.00 231.40 231.56 231.77 231.77 231.91 231.91 231.83
NIZ‐230 240/218 233.07 231.82 232.35 232.37 231.89 231.89 232.29 232.29 232.62
RMY‐400 420/380 405.89 404.29 404.76 405.25 399.92 399.92 402.17 402.17 405.46
PPH‐115 120/110 115.84 114.98 115.23 115.33 115.69 115.69 115.71 115.71 115.92
TUM‐115 120/110 113.47 112.59 112.66 112.80 112.62 112.62 112.87 112.87 113.56
CEX‐115 120/110 116.35 115.77 115.82 115.89 116.22 116.22 116.24 116.24 115.98
AKD‐115 120/110 112.61 111.89 112.00 112.10 111.57 111.57 111.92 111.92 112.58
 

Conclusiones
 

De  acuerdo  al  estudio  realizado  y  para  las  contingencias  evaluadas,  es  factible  interconectar  la 
central  eléctrica en las líneas de  400 kV, tanto  para  una generación  de 300  MW como para una 
generación de 600 MW. Ya que para las contingencias evaluadas no se presentan sobrecargas de 
elementos asociados a la zona de influencia. 

Una evaluación mas detallada en cuanto a control de voltaje depende de los parámetros con lo que 
se cuente del modelo de la central. Los dos reactores en el bus Kukulkan 400 kV fueron considerados 
únicamente  para  tener  un  nivel  de  voltaje  adecuando  para  el  estudio.  No  representan  un 
requerimiento técnico real. 

La  interconexión  de  la  central  en  un  voltaje  de  230  kV,  para  los  valores  de  flujos  de  potencia 
manejados en el estudios, no es viable ya que de acuerdo al análisis de contingencias hay elementos 
que sobrepasan su limite seguro de operación. 