Panduan EXTRAORDINARY MULIA TAHAP 3
Panduan EXTRAORDINARY MULIA TAHAP 3
Extraordinary
GerakanHARKonstruksiSerentak
PT. PLN (Persero) UP3 GUNUNG PUTRI
1. Pelaksanaan
Hari/Tgl : Kamis , 10 Agustus 2023
Waktu : 10:00–13:00WIB
Lokasi : Mainline Zona Moment
2. Penanggung Jawab
Manager Bagian Jaringan (GPI-2)
Manager ULP (JGL-1)
Team Leader ULP (JGL-2)
3. Pengawas Pelaksana
Team Leader Teknik : 3 (ULP 3)
TL OPS, TL HAR DAN STAF JARINGAN : 4 (GPI 2.2, GPI2.3, GPI 2.2.1, GPI 2.3.1)
STAFF TEKNIK ULP : 6(ULP 3)
4. Pengawas K3L
TL K3L UP3
6. Seksi Konsumsi
Asman KU
7. Seksi Acara
Team Leader PP ADM ULP
8. Operator
DISPATCHER UP3
E D C B A.
PT. KES PT. INDRA PUTRA HARTEK CITEUREUP 2 HARTEK CITEUREUP 1 PT. AKMAL
AFTAK
G.YI DN G.SNG SRTO
2B 1B 1B 2B 1B 4B 1B 2B 1B 1B 6BA 1A 6B 1B 1B 1B 2B 6BA 1B 2B 1B 1B 2B 8B 1B 1B 1B
T97 T96 T95 T94 T93 T92 T91 T90 T89 T88 T87 T86 T85 T84 T83 T82 T81 T80 T79 T78 T77 T76
T104 T103 T102 T101 T100 T99 T98
I H G F
RAJAPOLAH TAMBORA PANCAR TEKNIK HUMAJAYA
G.SNTW G.SNGX
1B 1B 4B 1B 1B 1B 2B 1B 1BA 1B 6B 1B 1B 1B 1B 1B 1B 1BA 6B 6B 1B 1B 1B
T120 T119 T118 T117
T129 T128 T127 T126 T125 T124 T123 T122 T121 T116 T115 T114 T113 T112 T111 T110 T109 T108 T107 T106 T105
N M L K J
HARTEK JGL 2 HARTEK JGL 1 CUBES HARTEK CILEUNGSI 2 HARTEK CILEUNGSI 1
8B 1B 1B 1B 1BA 1B 1B 1B 1B 2B 1B 1B 1B 4B 1B 1B 1BA 1B 2B 6B 1B 1B 1B 1B 1B
T159 T158 T157 T156 T155 T154 T153 T152 T151 T150 T149 T148 T147 T146 T145 T144 T143 T142 T141 T140 T139 T138 T137 T136 T135 T134 T133 T132 T131
PEMBAGIAN GRUP PETA POHON - P. MULIA
AFTAK
G.YIDN G.SNG SRTO
2B 1B 1B 2B 1B 4B 1B 2B 1B 1B 6BA 1A 6B 1B 1B 1B 2B 6BA 1B 2B 1B 1B 2B 8B 1B 1B 1B
T97 T96 T95 T94 T93 T92 T91 T90 T89 T88 T87 T86 T85 T84 T83 T82 T81 T80 T79 T78 T77 T76
T104 T103 T102 T101 T100 T99 T98
G.SNTW G.SNGX
1B 1B 4B 1B 1B 1B 2B 1B 1BA 1B 6B 1B 1B 1B 1B 1B 1B 1BA 6B 6B 1B 1B
T120 T119 T118 T117
T129 T128 T127 T126 T125 T124 T123 T122 T121 T116 T115 T114 T113 T112 T111 T110 T109 T108 T107 T106
8B 1B 1B 1B 1BA 1B 1B 1B 1B 2B 1B 1B 1B 4B 1B 1B 1BA 1B 2B 6B 1B 1B 1B 1B 1B
T159 T158 T157 T156 T155 T154 T153 T152 T151 T150 T149 T148 T147 T146 T145 T144 T143 T142 T141 T140 T139 T138 T137 T136 T135 T134 T133 T132 T131
PEMBERSIHAN ISOLATOR 3
T76 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
T77 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
T78 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PT. AKMAL
PEMBERSIHAN ISOLATOR 3
A T79 8B (SRTO) A3C 70
PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN COVER FCO 6
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PROTECTIVE SLEEVE 3
T80 2B A3C 70
PEMASANGAN PERFORMED INSULATED DOUBLE SIDE TIES 3
PENGGANTIAN ISOLATOR TUMPU 6
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PROTECTIVE SLEEVE 3
T81 1B A3C 70
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMASANGAN ARRESTER 3
PEMBERSIHAN ISOLATOR 3
T82 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
T83 2B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 6
PEMBERSIHAN ISOLATOR 3
T84 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
HARTEK CTRP 1
PEMBERSIHAN ISOLATOR 3
T91 1B A3C 70 PEMASANGAN PROTECTIVE SLEEVE 3
C PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T92 6BA A3C 70
PENGGANTIAN JUMPER 6B DAN WIRING ARRESTER 3
PENGGANTIAN JUMPER KE A3CS 70 1
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PROTECTIVE SLEEVE 3
T93 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PROTECTIVE SLEEVE 6
PENGGANTIAN ISOLATOR TUMPU 6
T94 G.SNG A3C 70
RUBAH KONSTRUKSI ARRESTER DIBAWAH 3
PEMASANGAN COVER BUSHING, FCO &ARRESTER 9
PEMASANGAN PERFORMED INSULATED TOP TIES 6
PEMBERSIHAN ISOLATOR 3
PT. INDRA PUTRA BERLIAN
E PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T102 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T103 1B A3C 70 PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMASANGAN ARRESTER 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED DOUBLE TOP TIES 3
T104 2B A3C 70
PENGGANTIAN ISOLATOR TUMPU 6
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T105 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T106 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PT. HUMAJAYA
T113 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
G PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T114 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDETIES 3
T115 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
T116 G.SNGX A3C 70 PENGGANTIAN JUMPER FCO ATAS A3C KE A3CS 10
PENGGANTIAN JUMPER ASPAN ATAS A3C KE A3CS 10
PEMASANGAN COVER BUSHING, FCO &ARRESTER 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T117 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
T118 6B A3C 70 PEMASANGAN PERFORMED INSULATED TOP TIES 3
PENGGANTIAN JUMPER A3C KE A3CS 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDETIES 3
T119 1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PT. TAMBORA
PEMBERSIHAN ISOLATOR 3
J G.BKTY A3C 70
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
PENGGANTIAN ISOLATOR TUMPU 3
T132 PEMASANGAN COVER BUSHING, FCO &ARRESTER 9
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
T133 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
1B A3C70
PENGGANTIAN ISOLATOR TUMPU 3
T134 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
T135 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
1B A3C 70 PENGGANTIAN ISOLATOR TUMPU 3
PEMASANGAN PROTECTIVE SLEEVE 3
T136 PEMASANGAN ARRESTER
HARTEK CLS 2
PEMBERSIHAN ISOLATOR 3
K 6B A3C70
PENGGANTIAN JUMPER A3C KE A3CS 3
PEMASANGAN PERFORMED INSULATED TOP TIES 3
T137 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED DOUBLE SIDE TIES 6
2B A3C 70
PENGGANTIAN ISOLATOR TUMPU 6
T138 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
1B A3C 70
PENGGANTIAN ISOLATOR TUMPU 3
T139 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
1BA A3C70 PENGGANTIAN ISOLATOR TUMPU 3
PENGGANTIAN ARRESTER 3
T140 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
1B A3C70
PENGGANTIAN ISOLATOR TUMPU 3
T141 PEMASANGAN PROTECTIVE SLEEVE 3
PEMBERSIHAN ISOLATOR 3
PEMASANGAN PERFORMED INSULATED SIDE TIES 3
1B A3C70
PENGGANTIAN ISOLATOR TUMPU 3