L 2 3 4 Ss 4 6 2 8 9 10 {74-20 RUN #6 ANG WIRE MINIMUM FROM POWERPLUS Cond BOSS HY TANK “BASE GND’ POINT ALONG. THE. OUTSIDE OF THE Hv. DUCT AND BOND WITH PRECIPITATOR POWERPLUS ON . a TOP OF ESP WIRE PER NEC CODE al\Z ql PLANT POWER view A SOURCE -NOTE 2 PLACEMENT AREAS FOR MULTIPLE POWERPLUS UNTS A conourr B Q LP BN T ——+4 <> ONS GROUNDING REQUIREMENT YW OS FOR POWERPLUS OQ > c se PRECIPITATOR WARRANTY VOID IF THESE A Ze REQUIREMENTS ARE NOT MET. 4 } > 3/8-16 RUN # 1/0 CABLE MINIMUM FEEDER GND cho STUD, FROM! PLANT GNO GRID TO. PRECIPITATOR. views (0. PRECIPTTATO ESP GND E PLANT GND GRID F | notes: = now oo oe ee 4) THESE ARE THE MINIMUM REQUIREMENTS. ALL NATIONAL AND LOCAL CODE = — REQUIREMENTS MUST BE ADHERED TO. Paves Ga 2, SHOWN AS WYE. CAN BE CONFIGURED DELTA e— 55, FOR ADDITONAL DETAIL, REFER TO THE POWERPLUS MANUAL. BS wa Te [bovoas07 ASHAMED ALT PRLS FIOTPENTS| _CSM csmM_|A125481 en srr A Eh