L 2 3 4 Ss 4 6 2 8 9 10
{74-20 RUN #6 ANG WIRE MINIMUM FROM POWERPLUS
Cond BOSS HY TANK “BASE GND’ POINT ALONG. THE. OUTSIDE
OF THE Hv. DUCT AND BOND WITH PRECIPITATOR
POWERPLUS ON
. a TOP OF ESP WIRE PER NEC CODE
al\Z ql
PLANT POWER
view A SOURCE -NOTE 2
PLACEMENT AREAS FOR
MULTIPLE POWERPLUS UNTS
A conourr
B
Q LP
BN T ——+4
<> ONS GROUNDING REQUIREMENT
YW OS FOR POWERPLUS OQ
>
c se PRECIPITATOR
WARRANTY VOID IF THESE
A Ze REQUIREMENTS ARE NOT MET.
4 }
> 3/8-16 RUN # 1/0 CABLE MINIMUM FEEDER GND
cho STUD, FROM! PLANT GNO GRID
TO. PRECIPITATOR.
views (0. PRECIPTTATO
ESP GND
E
PLANT GND GRID
F | notes: = now oo oe ee
4) THESE ARE THE MINIMUM REQUIREMENTS. ALL NATIONAL AND LOCAL CODE = —
REQUIREMENTS MUST BE ADHERED TO. Paves Ga
2, SHOWN AS WYE. CAN BE CONFIGURED DELTA e—
55, FOR ADDITONAL DETAIL, REFER TO THE POWERPLUS MANUAL. BS wa Te [bovoas07
ASHAMED ALT PRLS FIOTPENTS| _CSM csmM_|A125481
en srr A Eh