You are on page 1of 10
pe eM Section 3 INSTALLATION Required Tools + Hee as wht iting sie 6% SH, 0 6, Required Documentation Room and Doorway Size ‘Reopen ec a Detect nel cnnyneaency eae Soaseoeeae ‘Arrange for Help “Sechelt Inspect For Shipping Damage Unerate Unit Inspect For Hidden Shipping Damage ‘Take Inventory (pets ne ‘ane ni Opn Common i a Measure Path To Final Destination ‘uw reise sed Ayer aks ron Ea leg te eld tee fe gene nny tec Pekin nha on ede A ‘Short Doorway {edeamense) Sector onengeasaeptoee srw aby See ee ‘Tabletop Removal (If Necessary) ‘espera ti Se pF tn 1 Rene ep ets ad ne Pp et Seiler cere mpm Schehekaetiin thaatettigwatetas otic enacts e ‘Sualtaisunath sgt eo mes Simos deena ites SoSisdarash Sos Preparing the Tabletop for Moving 2am et pn ig eg. To fie en ae ‘Scmahon nega nny net aay Re Fe ae Ed ope Move Unit To Destination (Vertical Position) (ere dy abet pr 2 ut einen tenn ase ert rece et Fe 4 ‘mop pac easton ga ba to + Moet ttn thine ean Move Unit to Destination (Horizontal Position) erg apt a ac ated Sarge 2. ngewe wih ie ore inl i in Install C-Arm Fae penne win Co i i eat ree Install Cables ‘vaso at nar ‘ta ie ue epg ye ade pe Ane See °» Gem oth ctr ot te 12 Cn ae yep ne einige ‘Soe pmar adel Scat Acca oe Rae pn Ct py i hee gn SSied inte marches oa pret phone ean °6 fuer neces sje = Pah Opt Cn ACS ete oir acme eta Check Power Line Voltage ngs meant hed nr Sw ei emis Th ttn nr eos) Messrs ieclaonTansormerSocondayVotape ‘Sst ata oer ol a Soest emesis Install Computer © [iat alteartectes ult ecu pepay Staring QDR Sofware in Service Mode ‘seeps an * enamine iia rt a hc ‘Sonn Come Check Tube KV Peak Potential geen rein a hey ry of ea pec erie a LETEn aN age rte Soe ielantvndaets tab Spoaatpn occu. Sapiens ay eee a at ge eam Check Tube Current Check Belt Tension ‘Adjust C-Arm Y Belt Calibrate Motors Check X-Ray Beam Aignment

You might also like