A B C D E F G 2" x 4" C-PURLINS SPACED AT

26000 500MM O.C.


2000 4000 6000 6000 6000 4000 75MM x 75MM x 8 MM THICK ANGLE
COLUMN BAR TOP AND BOT MEMBERS
MARK TIES
CROSS SECTION
65MM x 65MM x 8 MM THICK ANGLE
250 WEB MEMBERS
USE 10mmØ TIES SPACED
5@ 0.05, 5@
6 PC 10MM Ø SAG ROD

250
B1
B1
B1 0.10, 5@0.15 REST
B1
@ 0.20 O.C.
RAFTER 1

NO. OF RSB 4 - 16MM Ø

GIRT

GIRT
PLANTED COLUMN SCHEDULES & DETAILS
6000

B1

B1

B1

B1
B1
SCALE : 1:20MTS
GUTTER

RAFTER 1
PC PC PC PC PC

GIRT

GIRT
B1 B1 RAFTER 1 B1 B1
C D E
5 6000
2" x 4" C-PURLINS SPACED AT 500MM O.C.
6000
CB1

RB1 RB1 75MM x 75MM x 8 MM THICK ANGLE


B1
B1

B1 RAFTER 1B1 B1 B1 BAR TOP AND BOT MEMBERS


4000

CRB1
RAFTER 1
65MM x 65MM x 8 MM THICK ANGLE

CRB1
2150
PC

CB1
NOTE: PROVIDE 12MM ROUND BAR CROSS BRACING WITH WEB MEMBERS

CB1
S1 16MM TURN BUCKLE RB1 RB1
S1
B1 B1 B1 4
4 GIRT

I N S I D E
PC

9300
RB2

RB2
RB1

RB1
RAFTER 1

S2 S2

6000

G U T T E R
GIRT
B2

B2
B1

B1

B1

GIRT

GIRT
6000

B2 B2 B2
RAFTER 1

RAFTER 1

RAFTER 1

RB1 RB1

S2 S2 STAIR WELL
3 RAFTER 1

2" x 4" C-PURLINS SPACED AT 500MM O.C.

B1 GIRT B1 B1 CB1
3 PC
GIRT
PC
GIRT
RAFTER 1
625 6000 6000 700

ROOFRAMN
IGPLAN NOTE: PROVIDE
RAFTER 1

12MM ROUND BAR


GIRT
S
C
E
A
L 01:1 C D CROSS BRACING
WITH
E
GIRT

16MM TURN BUCKLE


B1

B1

B1

B1

B1
6000

GIRT
B1

GIRT
PC PC RAFTER 1 PC
10MM Ø SAG ROD

PLEASE SEE RAFTER 1


2x4x1.5MM C-PURLINS
DETAIL FOR TRUSS DETAIL SPACED AT 500MM
O.C.

B1 B1 B1 CB1
2 RAFTER 1
GUTTER
GIRT
B1

B1

B1

B1

B1
4000

GUTTER

RAFTER 1
PC PC
GIRT

GRIND PORTION OF
CONCRETE WALL AND
PUT SEALANT PARAPET WALL
B1 B1 CB1
1 RAFTER 1 GI FLASHING
75MM x 75MM x 8 MM THICK
ANGLE BAR (VERTICAL) WHERE APPLICABLE

300x300x16MM THICK
STEEL PLATE

4 NOS - 16MM∅
ANCHOR BOLT

WEB MEMBERS
FULL WELD
300x300x16MM THICK CONNECTION TO
STEEL PLATE TRUSS MEMBERS
4 NOS - 16MM∅
ANCHOR BOLT
6000 6000 6000
BOTTOM CHORD

18000
FULL WELD
BLOW-UP CONNECTION TO TRUS
MEMBERS

A B C D E DETAIL
F
G
.LIA
.SHN
IGDETALI
S
C
E
A
L N
S
T
ROOFANDROOFDECKFRAMN
I GPLAN
SCALE 80
1:

DESIGN SUBMITTED: SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : PROJECT AND LOCATION: SHEET CONTENTS : SET NO. : SHEET NO. :

YTURRALDE ENGINEERING AND ROOF AND ROOFDECK FRAMING PLAN


CONSULTANCY SERVICES DRAWN TRUSS CONNECTION DETAIL
YTURRALDE ENGINEERING AND CONSULTANCY SERVICES
Lot 6 Blk. 19 NHA II Mandurriao, Iloilo City
REPUBLIC OF THE PHILIPPINES
CESAR M. HIPONA, JR.
CONSTRUCTION OF MULTI PURPOSE
BUILDING - CONSTRUCTION OF MULTI-
TRUSS MEMBER CONNECTION
PLANTED COLUMN SCHEDULE &DETAIL S 6
Cellphone No. (0918)-991-1051 Tel No. (033)-321-0775 MAKEV ERIC L. YTURRALDE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JANITA J. HOCSON YOLANDA B. PUGNA PURPOSE BUILDING, BRGY. BENEDICTO, TYPICAL RAFTER DETAIL
CHECKED ILOILO CITY DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VI
FORT SAN PEDRO ROAD , ILOILO CITY CHIEF PLANNING AND DESIGN SECTION OIC-ASST. DISTRICT ENGINEER DISTRICT ENGINEER
JARO, ILOILO GIRT DETAIL
C-PURLINS DETAIL 6 6 6
STRUCTURAL ENGINEER DATE : DATE : DATE :
REPUBLIC OF THE PHILIPPINES

D P W H
OFFICE OF THE BUILDING OFFICIALS

PIPES ASSEMBLED AS BARRICADES


- ANTI-FALL PROTECTION FOR WORKS OPERATED
OPEN AREAS (CONFINEMENT OF ELEVATED OPEN
WORKS AREAS) ILOILO CITY
- ADVISED TO BE INSTALLED ALONG THE PERIMETER
BUILDING DURING CONCRETING ON 2ND FLOOR
PERIMETER FENCE AND UP UNTIL COMPLETION OF MASONRY WORKS
NOTE : CONFINEMENT OF CONSTRUCTION
AREA MAY VARY DEPENDING ON THE
ACTUAL SITE CONDITION

9
BILLBOARD
2

7
CAUTION TAPE
CAUTION FOR
EXCAVATED AREAS 7 7

13
DURING FOUNDATION

2 2575 1250 1250 1375 1250


8

2100
CAUTION TAPE
CAUTION FOR
7200
EXCAVATED AREAS
4000 2075 2125
DURING FOUNDATION

3000
2 A

1400
CAUTION TAPE
CAUTION FOR
EXCAVATED AREAS 5 5
1600
DURING FOUNDATION
2600

2
CAUTION TAPE
7
3600

CAUTION FOR
EXCAVATED AREAS 7
DURING FOUNDATION

CAUTION TAPE
3800

CAUTION FOR
EXCAVATED AREAS 2
DURING FOUNDATION
6

13 5
3400

B
13
1
3
10
15

PERIMETER FENCE
NOTE : CONFINEMENT OF CONSTRUCTION
AREA MAY VARY DEPENDING ON THE
ACTUAL SITE CONDITION

GROUND FLOOR PLAN SECOND FLOOR PLAN


SCALE NTS
SCALE NTS

DESIGNED:
PROJECT TITLE / LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
DARYL JOY G. PAPA
REPUBLIC OF THE PHILIPPINES ENGINEER II

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE DRAWN:


ILOILO CITY DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VI
BUILDING - CONSTRUCTION OF MULTI-
PURPOSE BUILDING, BRGY. BENEDICTO,
REYMOND P. TORILLA B
SAFETY WARNING SIGNS ENGINEERING ASSISTANT
JANITA J. HOCSON YOLANDA B. PUGNA CESAR M. HIPONA, JR
FORT SAN PEDRO ROAD , ILOILO CITY JARO, ILOILO
CHECKED:
DARYL JOY G. PAPA CHIEF PLANNING AND DESIGN SECTION OIC- ASST. DISTRICT ENGINEER DISTRICT ENGINEER
1 3
LOCATION: ILOILO CITY ENGINEER II DATE : DATE : DATE :
REPUBLIC OF THE PHILIPPINES

D P W H
OFFICE OF THE BUILDING OFFICIALS

- ADVISED TO BE INSTALLED ON
- ADVISED TO BE INSTALLED AREA WHERE WELDING WORKS
9 A TOP ROOF BEAM DURING 14 FOR STEEL ROOF FRAMING
INSTALLATION OF TRUSSES AREA ON-GOING
AND PURLINS (2ND FLOOR & UP

ILOILO CITY

PIPES ASSEMBLED AS BARRICADES PIPES ASSEMBLED AS BARRICADES


- ANTI-FALL PROTECTION FOR WORKS OPERATED - ANTI-FALL PROTECTION FOR WORKS OPERATED
OPEN AREAS (CONFINEMENT OF ELEVATED OPEN OPEN AREAS (CONFINEMENT OF ELEVATED OPEN
WORKS AREAS) WORKS AREAS) BILLBOARD
- ADVISED TO BE INSTALLED ALONG THE PERIMETER - ADVISED TO BE INSTALLED ALONG THE PERIMETER
BUILDING DURING CONCRETING ON 2ND FLOOR BUILDING DURING CONCRETING ON 2ND FLOOR
AND UP UNTIL COMPLETION OF MASONRY WORKS AND UP UNTIL COMPLETION OF MASONRY WORKS

F I R E W A L L
9

9
10 9 8 7 6 5 4 3 2 1
STAIR 2
11 12 13 14 15 16 17 18 19

DN

SLOPE
7

7
OFFICE SPACE
OPEN

W4 W13

7 7

13

13
D2 W4 W4 W4
OPEN SPACE
W4 W4

W3 8 W12
8
W12

D3 D3 D3

FEMALE MALE
ELEV. W11 ELEV. W11
W14

W5 OFFICE 1
DN DN
19 18 17 16 15 14 13 12 11 19 18 17 16 15 14 13 12 11

D2 5 STAIR 1 5 W10 5STAIR 1


W10
5
UP 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

SLOPE SLOPE

OFFICE 2 OFFICE 3

SLOPE
W5 D2 D2 W9

7 7

W6

SLOPE
D2 OFFICE 4

13 W7 5 W8
13 5

ROOF PLAN
THIRD FLOOR PLAN SCALE NTS
SCALE NTS

DESIGNED:
PROJECT TITLE / LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
DARYL JOY G. PAPA
REPUBLIC OF THE PHILIPPINES ENGINEER II

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE DRAWN:


ILOILO CITY DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VI
BUILDING - CONSTRUCTION OF MULTI-
PURPOSE BUILDING, BRGY. BENEDICTO,
REYMOND P. TORILLA B
SAFETY WARNING SIGNS ENGINEERING ASSISTANT
JANITA J. HOCSON YOLANDA B. PUGNA CESAR M. HIPONA, JR
FORT SAN PEDRO ROAD , ILOILO CITY JARO, ILOILO
CHECKED:
DARYL JOY G. PAPA CHIEF PLANNING AND DESIGN SECTION OIC- ASST. DISTRICT ENGINEER DISTRICT ENGINEER
2 3
LOCATION: ILOILO CITY ENGINEER II DATE : DATE : DATE :
REPUBLIC OF THE PHILIPPINES

BUILDING SAFETY WARNING SIGNS D P W


OFFICE OF THE BUILDING OFFICIALS
H

ILOILO CITY

BILLBOARD

8 FEET
PROJECT BILLBOARD DETAIL
Project:________C
_o
_s
_t:______________
Location:__________

8 FEET

COA BILLBOARD
NOTE : BUILDING SAFETY WARNING SIGNS AND
PROJECT BILLBOARD SHOULD BE PRINTED IN TARPAULIN
2X3 2X3
WATCH OUT FOR

FALLING DEBRIS

1/4" THK.
900
TARP PLYWOOD
1/4" THK. (BOTH FACE)
2X2
PLYWOOD
TARP 2X3 2X3

2X2

2X3

2X3
1200
2X3 2X3
2X2
600

600

2X3 2X3

USE 2 X 2 WOODEN FRAME W/ 1/4" THK.

300
PLYWOOD
FRONT SIDE
600

BUILDING SAFETY WARNING SIGNS PROJECT BILLBOARD


FRAMING DETAIL FRAMING ELEVATION DETAIL
DESIGNED:
PROJECT TITLE / LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
DARYL JOY G. PAPA
REPUBLIC OF THE PHILIPPINES ENGINEER II

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE DRAWN:


ILOILO CITY DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VI
BUILDING - CONSTRUCTION OF MULTI-
PURPOSE BUILDING, BRGY. BENEDICTO, BILLBOARD
REYMOND P. TORILLA B
FORT SAN PEDRO ROAD , ILOILO CITY JARO, ILOILO
ENGINEERING ASSISTANT
JANITA J. HOCSON YOLANDA B. PUGNA CESAR M. HIPONA, JR
CHECKED:
DARYL JOY G. PAPA CHIEF PLANNING AND DESIGN SECTION OIC- ASST. DISTRICT ENGINEER DISTRICT ENGINEER
3 3
LOCATION: ILOILO CITY ENGINEER II DATE : DATE : DATE :