You are on page 1of 1

SUB SURFACE EXPLORATION LOG

SURVEY INVESTIGASI DAN DESAIN PELABUHAN LAUT BH - 3


LOCATION : PELABUHAN TUAL DRILLING TYPE MACHINE : THD TONE DATE COMMENCED : 18 Oktober 2016
KOTA TUAL CORE DIAMETER (mm) : 73 DATE COMPLETED : 21 Oktober 2016
METHOD OF SAMPLING : Rotary Drilling WEIGHT OF HAMMER (Kg) : 63.5 SOIL&MATERIAL ENG. : Iwan
GROUND ELEVATION (m) : -5.00 DIST.FALLING HAMMER (cm) : 75 SUPERVISOR : -
CASSING DIAMETER (mm) : 89 DRILLING MASTER : Rudi
TOTAL DEPTH (m) : 30.00 CASSING DEPTH (m) : 18.00
SHEET 1 OF 1

BORING MACHINE
SPT STANDARD PENETRATION TEST

SAMPLE (UDS)
THICKNESS (m)

BORE PROFILE

UNDISTURBED
& N VALUE NUMBER OF BLOWS

SPT TEST No.

REMARKS
10 20 30 40 50
DEPTH (m)

LWS (m)

COLOR
CORE DESCRIPTION
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0

1 2 3 N
0.0 -5.00 15 15 15 30

Keputihan
Abu-abu
1.0
2.75 Pasir Lanau Lempungan, Terurai. SPT - 1 2 5 5 10
2.0
2.75 -7.75 DS - 1
3.0
SPT - 2 3 6 8 14
4.0
DS - 2
5.0
SPT - 3 5 8 12 20
6.0
Abu-abu Keputihan
DS - 3
7.0
SPT - 4 8 10 16 26
8.0 Pasir Halus, Sedang - Terurai.
9.75 DS - 4
9.0
SPT - 5 9 11 14 25
10.0
DS - 5
11.0
SPT - 6 10 14 18 32
12.0
12.5 -17.50 DS - 6
13.0
SPT - 7 12 16 21 37
14.0
DS - 7
15.0
SPT - 8 10 14 20 34
Abu-abu

16.0
6.75 Pasir Kasar, Agak Padat - Terurai. DS - 8
17.0
SPT - 9 14 20 26 46
18.0
DS - 9
19.0
19.3 -24.25 SPT - 10 15 18 27 45
20.0
oo DS - 10
Kehitaman
Abu-abu

21.0 3.50
oo
Pasir Lanau Kerikilan, Padat - Terurai.
oo SPT - 11 13 17 25 42
22.0
22.8 -27.75
oo DS - 11
23.0 ooo
ooo SPT - 12 16 23 27 50
24.0 ooo
ooo DS - 12
25.0
ooo
Abu-abu Kehitaman

ooo
SPT - 13 20 27 29 56
ooo
26.0 7.25 ooo Pasir Kerikilan, Padat - Terurai.
ooo DS - 13
27.0 ooo
ooo SPT - 14 18 24 36 60
28.0 ooo
ooo DS - 14
ooo
29.0
ooo
SPT - 15 17 27 35 62
30.0 -35.00 DS - 15

REMARKS :
Test Was Stopped UDS Undisturbed Sample DS Disturbed Sample

You might also like