You are on page 1of 13

N

#47 SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

1 PAATFRZPEES2P3S PIPE XS ERW STL API-5L-B 600 35.1 M

2 NBAFKRBEAN2P3S ELL 45 DEG XS STL A234 WPB 600 1

SPOOL 2A/64 - PIPE SUPPORTS


5054mm 3 5S4C4-600 WELDED STANDARD SHOE - TYPE4, 100MM HIGH, 600 4
CS

SEE ISO FIELD MATERIALS

PD
WT-3900M31650-10007-26

0N
E 3973000 PT PMRC PART & DESCRIPTION SIZE QTY

60
N 5372769 NO. (DN)
EL +118374 __ ________ __________________ ____ ___
1
381 FW
PIPE SUPPORTS
4 5G2 GUIDE - TYPE2 600 2
269
00 SPOOL NO.
35
S3 2 WT-3900M31650-10007-27A | WT-3900M31650-10007-27B | WT-3900M31650-10007-27C
SPOOL 2A/67 - 6 269
5S4C4-600 43
6000mm 11
2
0 45°
6 00
EL +118105

*WT-3900M31650-10007-
WT-3900M31650-10007-27A

S3
SPOOL 2A/69 - 1 S4
5S4C4-600
6000mm 5G2

3
S3 6 4 FW
0 70
5S4C4-600 00
12

WT-3900M31650-10007-27B
6
43
1 35

64
40
4
0 00 FW
12

SPOOL 2A/66 -
INE S4
I DL 5G2 6000mm SPOOL 2A/65 -
GR 1
WT-3900M31650-10007-27C

3/C
6000mm
S3
20
00 5S4C4-600 SEE ISO
WT-3900M31750-10007-28
PD E 3973000
0N N 5337064
60 FW EL +118105
GR
ID
3/7 LIN
0 E
64
10

SPOOL 2A/68 -
6000mm

WT-3900-10007 600 1C136DA N/0


LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 06-JUN-16 GBV FFL BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
600-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31650-10007-27
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

10-Jun-2016
N
#47 SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

1 PAATFRZPEES2P3S PIPE XS ERW STL API-5L-B 600 60.0 M

PIPE SUPPORTS
2 5S4C4-600 WELDED STANDARD SHOE - TYPE4, 100MM HIGH, 600 7
CS
3 5S4C4L-600 WELDED LONG SHOE - TYPE4, 100MM HIGH, CS 600 1

SPOOL 2A/71 -
FIELD MATERIALS
6000mm
1064 PT PMRC PART & DESCRIPTION SIZE QTY
NO. (DN)
SPOOL 2A/73 - WT-3900M31750-10007-28A __ ________ __________________ ____ ___
6000mm
PIPE SUPPORTS
4 5G2 GUIDE - TYPE2 600 3

600NPD 5 5DA3C DIRECTIONAL ANCHOR - TYPE 3 600 1


S2 0 00 SEE ISO
5S4C4-600 12 00
SPOOL 2A/75 - 60 1 WT-3900M31650-10007-27 SPOOL NO.
FW E 3973000
6000mm N 5337064
WT-3900M31750-10007-28A | WT-3900M31750-10007-28B | WT-3900M31750-10007-28C |
WT-3900M31750-10007-28D | WT-3900M31750-10007-28E
2 S2 EL +118105
FW 5S4C4-600
1

*WT-3900M31750-10007-
WT-3900M31750-10007-28B
S3
SPOOL 2A/77 - 5S4C4L-600 00
0
00 S4
12 90 5G2
6000mm 0
00 1064
60
S2 1 S2
5S4C4-600
00 5S4C4-600
12
0 64
70
5
FW
SPOOL 2A/79 - S5
3 SPOOL 2A/70 -
6000mm 1 FW 5DA3C
6000mm
WT-3900M31750-10007-28E 0 64
00 40 WT-3900M31750-10007-28C
12
S2 4 S4
5S4C4-600 FW 5G2
1
S2 WT-3900M31750-10007-28D
GRID LINE 5S4C4-600
3/C
0
00
12
00
90
S4 1064
SEE ISO 5G2
WT-3900M31850-10007-29
E 3973000 2000 1
N 5277064
EL +118105 S2 SPOOL 2A/72 -
5S4C4-600 6000mm
FW SPOOL 2A/76 -
GR 6000mm
ID SPOOL 2A/74 -
3/7 LIN
8 E
64
6000mm
10

SPOOL 2A/78 -
6000mm

WT-3900-10007 600 1C136DA N/0


LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 06-JUN-16 GBV FFL BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
600-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31750-10007-28
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

10-Jun-2016
N
#47 SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

1 PAATFRZPEES2P3S PIPE XS ERW STL API-5L-B 600 29.1 M

2 NMAGDCERFZZ2P1F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 600X40 1

3 NBAFKRBEAN2P3S ELL 45 DEG XS STL A234 WPB 600 1


SPOOL 2A/81 -
6000mm PIPE SUPPORTS
4 5S4C4-600 WELDED STANDARD SHOE - TYPE4, 100MM HIGH, 600 4
SEE ISO CS
SPOOL 2A/83 - WT-3900M31750-10007-28
E 3973000
6000mm N 5277064 FIELD MATERIALS
EL +118105
PT PMRC PART & DESCRIPTION SIZE QTY
S4 NO. (DN)
__ ________ __________________ ____ ___
5S4C4-600 600NPD
14 5 GEASDUERFDJ1F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 40 1
44

1 6 BAAAAAZZ0F0S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 4


FW 80 mm Length
0
00 7 FEALDCERFZZ1F FLG BLIND 150# RF STL A105 40 1
12
S4
50 PIPE SUPPORTS
5S4C4-600 66 WT-3900M31850-10007-29A
8 5G2 GUIDE - TYPE2 600 2

*WT-3900M31850-10007-
SPOOL 2A/84 -
5040mm SPOOL NO.
WT-3900M31850-10007-29A | WT-3900M31850-10007-29B | WT-3900M31850-10007-29C
1
5 64
28

64 S8
0 80 2
S4 00 5G2
12 FW
5S4C4-600

WT-3900M31850-10007-29B
1 SPOOL 2A/80 -
6000mm
64 S8
20
5G2
64
45 3
WT-3900M31850-10007-29C 4 FW

PWHT: S4
N 5S4C4-600
G5 B6 2
GRID LINE 20 1 600X40NPD
00
60 3/C 0
0N 85
PD 381 7
457
SEE ISO
WT-3900M31850-10007-30 FW
E 3973000
5
PWHT:
SPOOL 2A/82 -
0
N 5247381 50 UNDEFINED 6000mm
269
EL +118374
3
45°

GRID LINE 269


3/81

600 1C136DA N/0


WT-3900-10007
40 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 06-JUN-16 GBV FFL BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
600-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31850-10007-29
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

14-Jun-2016
N
#47 SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
SPOOL 2A/85 - __ ________ __________________ ____ ___
830mm
SPOOL 2A/87 - 1 PAATFRZPEES2P3S PIPE XS ERW STL API-5L-B 600 38.8 M
6000mm 2 NMAGDCERFZZ2P1F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 600X40 1

3 NCAFKRBEAN2P3S ELL 90 DEG LR XS STL A234 WPB 600 4


SPOOL 2A/88 -
WT-3900M31850-10007-30A 6000mm PIPE SUPPORTS
1740 4 5S4C4-600 WELDED STANDARD SHOE - TYPE4, 100MM HIGH, 600 5
3 4 CS
EL +119605 2 FW
1
600NPD FIELD MATERIALS
1
3 1 45°
1236 FW PT PMRC PART & DESCRIPTION SIZE QTY
SEE ISO
NO. (DN)
WT-3900M31850-10007-29

1231
__ ________ __________________ ____ ___
E 3973000
27 N 5247381
64 5 GEASDUERFDJ1F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 40 1
EL +118374
31
12 6 BAAAAAZZ0F0S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 4
80 mm Length
SPOOL 2A/86 - GR 7 FEALDCERFZZ1F FLG BLIND 150# RF STL A105 40 1
S4 ID
320mm S4 3/8 LIN
E
5S4C4-600 1 SPOOL NO.
60 5S4C4-600
00
11 WT-3900M31850-10007-30A | WT-3900M31850-10007-30B | WT-3900M31850-10007-30C |

*WT-3900M31850-10007-
50
12 0 WT-3900M31850-10007-30D | WT-3900M31850-10007-30E | WT-3900M31850-10007-30F |
73
6 WT-3900M31850-10007-30G
50
18
SPOOL 2A/94 - 457 7
SPOOL 2A/95 - 6000mm E
5 LIN
830mm 32
64 GR
ID

G5 B6 3/E
WT-3900M31850-10007-30B
1 6
FW

12 SPOOL 2A/91 - 50
0
FW 6000mm 14
14 3
2
914
600X40NPD
3 914
8
FW 7
13
1 WT-3900M31850-10007-30D 1
40
17

12
1231

00 14 86
0 15 13
S4 0
1

60
00
WT-3900M31850-10007-30G 5S4C4-600
S4 64
57 WT-3900M31850-10007-30C
5S4C4-600
31
12 S4 29 SPOOL 1A/89 -
FW 14
5S4C4-600 480mm
SEE ISO 9
45° WT-3900M31950-10007-31 12 FW
36 0
E 3973000 0 30
WT-3900M31850-10007-30F 00 14
N 5230619 12
EL +118374 1 1

600NPD 11
FW
10
WT-3900M31850-10007-30E 3
914

SPOOL 2A/90 -
6000mm

SPOOL 2A/93 -
6000mm

SPOOL 2A/92 -
320mm

600 1C136DA N/0


WT-3900-10007
40 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 06-JUN-16 GBV FFL BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
600-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31850-10007-30
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

8-Jun-2016
N SHOP MATERIALS

SPOOL 2A/100 -
6000mm
#47 PT
NO.
__
PMRC

________
PART & DESCRIPTION

__________________
SIZE
(DN)
____
QTY

___
55.0 M
1 PAATFRZPEES2P3S PIPE XS ERW STL API-5L-B 600 53.2 M
PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 0.5 M
2 NJAFKRBEAN2P3S1P3E TEE RED XS (HD) X SCH 20 (BR) STL A234 WPB 600X350 1
SPOOL 2A/98 -
3 NMAGDCERFZZ2P1F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 600X40 1
SEE BELOW 6000mm Z0A RPAD REINFORCING PAD (MATERIAL CUT FROM HEADER) 650X350 1
REINFORCEMENT PAD 4 NBAFKRBEAN2P3S ELL 45 DEG XS STL A234 WPB 600 1
DETAIL SPOOL 2A/101 - SEE ISO 5 FLALDCERFZZ2P3S FLG WN 150# RF XS BORE STL A105 600 3
6000mm

PD
WT-3900M31850-10007-30
PIPE SUPPORTS

0N
E 3973000

60
N 5230619 6 5S4C4-600 WELDED STANDARD SHOE - TYPE4, 100MM HIGH, 600 6
406 EL +118374 1 CS
381 FW 7 5S4C4L-600 WELDED LONG SHOE - TYPE4, 100MM HIGH, CS 600 1

FIELD MATERIALS
84 50 269
54 33
SPOOL 2A/104 - WT-3900M31950-10007-31B
PT PMRC PART & DESCRIPTION SIZE QTY
NO. (DN)
864 4990mm S6
5S4C4-600
1
2
269 __ ________ __________________ ____ ___
WT-3900M31950-10007-31C
0 6 4

*WT-3900M31950-10007-31*
0 6
S6 1 20 68 45° 8 GEASDUERFDJ2P0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 600 3
5S4C4-600 EL +118105
WT-3900M31950-10007-31D 9 GEASDUERFDJ1F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 40 1
STUB-IN CONNECTION S16
51
96
9
0
1 3
FW
WT-3900M31950-10007-31A
10 BAAAAAZZ1D3J STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1.1/4 20
00 340 mm Length
5G2 12
S7 11 BAAAAAZZ1D1S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1.1/4 20
1
S16 180 mm Length
WT-3900M31950-10007-31E 5S4C4L-600 4
3866 5G2 12 BAAAAAZZ0F0S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 4
FW 80 mm Length
S6 0 0 5
20 00 13 LGBUCBERFZBPJZZ2P BUTTERFLY-LUG 150# RF CS BODY, 600 1
5S4C4-600 6866 1 90 866 FW
SEE ISO SS/PTFE/ALY625 TRIM GO
10484 1 S17 S6 14 FEALDCERFZZ2P FLG BLIND 150# RF STL A105 600 1
WT-3900M31950-10007-32 7
E 3973000 5DA3C 5S4C4-600
8 6 15 FEALDCERFZZ1F FLG BLIND 150# RF STL A105 40 1
N 5177450 932 FW S6
EL +118511
407 3 5S4C4-600 PIPE SUPPORTS
G9 B12 600X40NPD 16 5G2 GUIDE - TYPE2 600 3
9 1
FW 4
58 S16
GRID LINE S6
15
5G2 SPOOL 1A/96 - 17 5DA3C DIRECTIONAL ANCHOR - TYPE 3 600 1
03 457
3/C 21
5S4C4-600
154
SPOOL 2A/99 - 5100mm SPOOL NO.
10 Z0A WT-3900M31950-10007-31A | WT-3900M31950-10007-31B | WT-3900M31950-10007-31C |
6
70
13
5 8
F5 G8 2 6000mm WT-3900M31950-10007-31D | WT-3900M31950-10007-31E | WT-3900M31950-10007-31F

1 F5 G8 B10 600X350NPD
20
00
12
F5 G8 B11 11 13 HW WEST
STEM UP Z0B

14 WT-3900M31950-10007-31F

SPOOL 2A/102 -
GR
ID
6000mm
LIN
3/9
0 E SPOOL 2A/97 -
2297
6000mm
SPOOL 2A/105 - SPOOL 2A/103 -
1050mm 6000mm

REINFORCEMENT PAD DETAIL


L = 180 MM
3/8" VENT HOLE Branch
Drill &Tap & Fill Up

(Thk = 12.7 MM) RAPID-P0014-OUI-PIP-ECN-3900-0057_0


RAPID-P0014-OUI-PIP-ECN-3900-0052_0
600 1C136DA N/0
WT-3900-10007
40 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
Header OPERATING Barg 3.00 C 30.00
DESIGN 17.50 75.00
IFC - ISSUED FOR CONSTRUCTION 10-MAR-18 RHC JDL KS OWNER : PROJECT TITLE:
Z0B
PETRONAS RAPID PROJECT, PENGERANG
Z0A IFC - ISSUED FOR CONSTRICTION 29-JAN-18 RHC JDL KS PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 20-JUL-16 GBV FFL BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
600-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31950-10007-31
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. Z0A
0Z0B
21-Jul-2016
N
#63 SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 4.3 M

2 NCAFKRBEAN1P3E ELL 90 DEG LR SCH 20 STL A234 WPB 350 1

PIPE SUPPORTS
3 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 1
CS

SPOOL NO.
WT-3900M31950-10007-32A

2
EL +119478

SPOOL 2A/107 -

*WT-3900M31950-10007-
WT-3900M31950-10007-32A
E
LIN 3820mm
ID
GR 2
3/C 1

967
40
00

1
20 43
00 SEE ISO 50
WT-3900M31950-10007-31
E 3973000
N 5177450
EL +118511

FW
SEE ISO
1
S3 WT-3900M32250-10007-33
E 3977350
SPOOL 2A/105 - 5S3C4-350
600X350NPD N 5177450
430mm EL +119478
50
44 35
0N
PD
GR
ID 600NPD 3
3/9 LIN
0 E FW

WT-3900-10007 350 1C136DA N/0


LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 30.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 21-JUL-16 GBV RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M31950-10007-32
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

25-Jul-2016
N SHOP MATERIALS

#63 PT
NO.
PMRC PART & DESCRIPTION SIZE
(DN)
QTY

__ ________ __________________ ____ ___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 12.0 M

2 PAATFPZBEEX3A3G PIPE SCH 40 SMLS STL A106-B 80 0.2 M


1
3 NKAGDCBEZZ1P3E3A3G WELDOLET SCH 20 (HD) X SCH 40 (BR) STL A105 350X80 1
4 FLALDCERFZZ3A3G FLG WN 150# RF SCH 40 STL A105 80 1

PIPE SUPPORTS
5 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 2
CS

FIELD MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
E
LIN __ ________ __________________ ____ ___
R ID
G
/1 6 3900-SP-013 VACUUM BREAKER 150 RF (PRELIMINARY STATUS) 80X80 1
3A GR 1
ID
3A LIN 7 GEASDUERFDJ3A0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 80 1
/B E
8 BAAAAAZZ0G1A STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 5/8 4
100 mm Length
FW SEE ISO
WT-3900M31950-10007-32 SPOOL NO.
E 3977350 25
N 5177450 00 WT-3900M32250-10007-33A

*WT-3900M32250-1000
6
EL +119478 80X80NPD 78

169
16
3900-SP-013 1
1
128

131
F4 G7 B8

5
S5
5S3C4-350

576
81
50

442
WT-3900M32250-10007-33A
4
25
00
3
350X80NPD
3

S5
5S3C4-350
38
50
2
FW

SPOOL 2A/108 -
6000mm 35
0 35
0N
PD
SPOOL 2A/109 -
6000mm SEE ISO
WT-3900M32150-10007-34
E 3989350
N 5177450
EL +119478

350 1C136DA N/0


WT-3900-10007 1 80 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING Barg 3.00 C 30.00
DESIGN 17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
1 IFC - ISSUED FOR CONSTRUCTION 26-JAN-17 RBB EVP BMB PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 21-JUL-16 GBV RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL JOB NO : P0014 DWG NO : WT-3900M32250-10007-33
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 1

26-Jan-2017
N SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)

#63
__ ________ __________________ ____ ___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 15.3 M

PIPE SUPPORTS
2 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 3
SPOOL 2A/110 - CS

3300mm
FIELD MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

PIPE SUPPORTS
E 3 5G2 GUIDE - TYPE2 350 1
LIN
ID
GR SPOOL NO.
/2
3A WT-3900M32150-10007-34A | WT-3900M32150-10007-34B

GR 35
ID 0
3A LIN SEE ISO
/B E
WT-3900M32250-10007-33
E 3989350
SPOOL 2A/112 -
N 5177450 6000mm

*WT-3900M32150-10007-
1550
EL +119478
S3
FW 1 5G2
WT-3900M32150-10007-34B

1
FW
33 29
00 50
S2
5S3C4-350

1 S2
5S3C4-350

15
30
0

12
00
0

73
00 S2
5S3C4-350

2 SEE ISO
FW WT-3900M32050-10007-35
E 4004650
N 5177450
35
SPOOL 2A/111 - 0 EL +119478
6000mm WT-3900M32150-10007-34A

350NPD

WT-3900-10007 350 1C136DA N/0


LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 30.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 21-JUL-16 GBV RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M32150-10007-34
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

25-Jul-2016
N SHOP MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 18.0 M

#63 2 NCAFKRBEAN1P3E ELL 90 DEG LR SCH 20 STL A234 WPB 350 2

3 FLALDCERFZZ1P3E FLG WN 150# RF SCH 20 STL A105 350 1

PIPE SUPPORTS
4 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 1
CS
5 5S3C4L-350 WELDED LONG SHOE - TYPE3, 100MM HIGH, CS 350 1
E
LIN
ID
35
0 GR FIELD MATERIALS
/3
GR 3A
ID PT PMRC PART & DESCRIPTION SIZE QTY
3A LIN
/B E NO. (DN)
__ ________ __________________ ____ ___
35
0N
SPOOL 2A/114 - PIPE SUPPORTS
PD SEE ISO 4930mm
WT-3900M32150-10007-34 6 5DA3C DIRECTIONAL ANCHOR - TYPE 3 350 1
1550 E 4004650
FW N 5177450 7 5G2 GUIDE - TYPE2 350 1
EL +119478
1 SPOOL NO.

*WT-3900M32050-10007-
WT-3900M32050-10007-35A | WT-3900M32050-10007-35B | WT-3900M32050-10007-35C

10
92
7 S7
S5
5G2
5S3C4L-350
WT-3900M32050-10007-35C

1
10
77 533
S6
5DA3C 2
SPOOL 2A/113 - 2
EL +119478
6000mm FW

5500
SPOOL 2A/116 -

4967
3170mm
1

WT-3900M32050-10007-35B

3
SPOOL 2A/115 - 2
4
FW
4430mm S4
1 5S3C4-350
WT-3900M32050-10007-35A

533 32 STEM UP
38 91 5 F3
24 14 BATTERY LIMIT BETWEEN
02
UNIT 3900 DEC ML & UNIT 4750 DEC ML
4750-BL-01

350NPD
SEE ISO
WT-4750M10850-10001-01 BATTERY LIMIT BETWEEN
E 4019402 UNIT 3900 DEC ML & UNIT 4750 DEC ML
N 5177450 4750-BL-01
EL +113978

WT-3900-10007 350 1C136DA N/0


LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 30.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC - ISSUED FOR CONSTRUCTION 21-JUL-16 GBV RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-3900-10007-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-3900-1013
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-3900M32050-10007-35
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
3 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 3900 UNIT : 3900 SHT. NO. 1 OF 1 REV. NO. 0

25-Jul-2016
N SHOP MATERIALS

#63 PT
NO.
__
PMRC

________
PART & DESCRIPTION

__________________
SIZE
(DN)
____
QTY

___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 35.9 M

2 NMAGDCERFZZ1P1F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 350X40 1

3 NMAGDCERFZZ1P0F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 350X15 1

SPOOL 2A/117 - 4 FLALDCERFZZ1P3E FLG WN 150# RF SCH 20 STL A105 350 1

5870mm PIPE SUPPORTS


5 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 5
CS
SEE ISO 6 5S3C4L-350 WELDED LONG SHOE - TYPE3, 100MM HIGH, CS 350 1
WT-3900M32050-10007-35
92 E 4019402
G8 N 5177450 FIELD MATERIALS
EL +113978
PT PMRC PART & DESCRIPTION SIZE QTY
42 NO. (DN)
2 1 BATTERY LIMIT BETWEEN __ ________ __________________ ____ ___
UNIT 3900 DEC ML & UNIT 4750 DEC ML
4750-BL-01 7 FFALDCEFLBZ0F3K FLG LAP JOINT 150# STL A105 15 1
32
7 2
GRID LINE

*WT-4750M10850-10001-01*
14/21
1 B 8 GEASDUERFDJ1P0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 350 2
STEM UP 2
330 350X40NPD
17 9 GEASDUERFDJ1F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 40 2
498

4750
50 STEM EAST
15 PG
10 GEASDUERFDJ0F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 15 2
F4 G8 B11 0006

18 SPOOL 2A/121 - 11 BAAAAAZZ1A2J STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1 12

26
165 240 mm Length
15 16
23
23 6 6000mm 12 BAAAAAZZ0F0Q STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 8
SPOOL 2A/120 -

477
STEM EAST G9 B13 70 mm Length
HW UP 01C-FLG S5 13 BAAAAAZZ0F0S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 8
17
G9 B13
3
108
5S3C4-350 6000mm 80 mm Length
F7 14 5HE-BTFL1-2250 HANDWHEEL EXT, 2250 HT 350 1
GRID LINE
GPX2 G10 B12 15 VJBJCBERFAJEKMZZ1F GATE 150# RF CS BODY, 316SS/ST6 TRIM RB 40 1
330
16 FEALDCERFZZ1F FLG BLIND 150# RF STL A105 40 1
G10 B12
3 93 17 VJBJCBERFAJEKMZZ0F GATE 150# RF CS BODY, 316SS/ST6 TRIM RB 15 1
3
S19 60 50
350X15NPD 00
5G2 INSTRUMENTS
15 SEE ISO 18 4750-PG-0006 PRESSURE GAUGE 15 1
00
WT-4750M00650-10001-02
S5 E 4055500 PIPE SUPPORTS
5S3C4-350 N 5177450
EL +113978 19 5G2 GUIDE - TYPE2 350 3
1 12
00 33
0 35 S6
0 20 5DA3C DIRECTIONAL ANCHOR - TYPE 3 350 1
WT-4750M10850-10001-01C 5S3C4L-350
S19 60
00 MISCELLANEOUS ITEMS
4 5G2
FW 21 LGBUCBERFZBPJZZ1P-H BUTTERFLY-LUG 150# RF CS BODY, 350 1
15
00 SS/PTFE/ALY625 TRIM GO, HOR-HW
S5 S5
5S3C4-350 5S3C4-350 SPOOL NO.

S20 1 WT-4750M10850-10001-01A | WT-4750M10850-10001-01B | WT-4750M10850-10001-01C

SPOOL 2A/118 - 5DA3C 12


00
0
6000mm 5 S19
60
FW 5G2 00
WT-4750M10850-10001-01B

15
00

S5
5S3C4-350 350NPD

WT-4750M10850-10001-01A
6
FW
SPOOL 2A/119 -
6000mm
MASTER COPY
-RAPID PROJECT- SPOOL 2A/122 - 350 1C136DA N/0
6000mm WT-4750-10001 40 1C136DA N/0
15 1C136DA N/0

AS-BUILT
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
00 ASB - AS-BUILT 06-AUG-19 SEJ JLC JDL OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
FOR THE ACTUAL WELD NUMBER AND LOCATIONS, REFER TO RLMU REVISION 1 IFC-ISSUED FOR CONSTRUCTION 19-SEP-16 JAP RMR BMB PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC-ISSUED FOR CONSTRUCTION 10-AUG-16 JAP RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-4750-10001-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-4750-0090
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-4750M10850-10001-01
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
2 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 4700 UNIT : 4750 SHT. NO. 1 OF 1 REV. NO. 00

6-Aug-2019
N BOLT CIRCLE
DIAMETER SHOP MATERIALS

#63 (Note1) 

DN15
 (Note1)
DN15
PT
NO.
__
PMRC

________
PART & DESCRIPTION

__________________
SIZE
(DN)
____
QTY

___
(Note2) (Note2)
BOLT HOLES
TO STRADDLE TUBING BY 1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 15.6 M
TUBING BY THIS CL
INST. INST.
2 NCAFKRBEAN1P3E ELL 90 DEG LR SCH 20 STL A234 WPB 350 2
DOWNWARD TAPPING ORIENTATION
FOR ORIFICE FLANGES
3 FGAJDCFRFZZ1P3E WN ORIF SET 300# RF SCH 20 STL A105 350 1
Note1: Ref dwg no. D12.92.343-F From
SPOOL 1A/123 - RAPID-P0014-OUI-PIP-STD-0001-0002
Note2: Ref dwg no. (Appendix 3) From 4 FLALDCERFZZ0F3K FLG WN 150# RF SCH 80 STL A105 15 2
RAPID-P0014-OUI-PIP-SPN-0001-0019
2240mm Note3: Internal welds to be Ground Smooth PIPE SUPPORTS
DETAIL- A 5 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 3
CS

FIELD MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


NO. (DN)
__ ________ __________________ ____ ___

6 FFALDCEFLBZ0F3K FLG LAP JOINT 150# STL A105 15 2

7 GEASDUFRFDJ1P0D GASKET 300# 316SS SPIRAL WOUND GRAPHITE IR 350 2

*WT-4750M00650-10001-02*
8 GEASDUERFDJ0F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 15 4

9 BAAAAAZZ1B2A STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1.1/8 20


200 mm Length
10 BAAAAAZZ0F0Q STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 16
70 mm Length
11 VJBJCBERFAJEKMZZ0F GATE 150# RF CS BODY, 316SS/ST6 TRIM RB 15 2
35
0N WT-4750M00650-10001-02B ORIFFLG-NIPPLE
PD INSTRUMENTS
BY INSTRUMENT
E 4063969
N 5177676
SPOOL 2A/125 - 12 4750FE-0002 FLOW ELEMENT ORIFICE PLATE 350 1
4750 G7
1 EL +114142
FE ORIFFLG-NIPPLE
BY INSTRUMENT
6000mm 13 4750FT-0002 FLOW XMTR DP 15 1
0002
PIPE SUPPORTS
FW 12 10
15 14 5G2 GUIDE - TYPE2 350 1
S5 83 50 143 F4 G8 B10
50 0 150
5S3C4-350 60 SPOOL NO.
SEE ISO 00 15NPD 108 10
WT-4750M10850-10001-01 S14 WT-4750M00650-10001-02A | WT-4750M00650-10001-02B
7
E 4055500 5G2 3
N 5177450 1
GRID LINE
EL +113978 S5 297 F6 B
5S3C4-350 99
F3 G7 B9 3
SEE DETAIL A
GRID LINE 150
9
2 4750
F4 G8 B10
7 1 2000 FT
29
11
G8 0002
STEM WEST
108 4 5
69 1
90 24
2
969 26
EL +113978
7 175 11
4750 1
24 STEM EAST
17

2000
FT E 4064033 20
15NPD 6
0002 N 5177224
WT-4750M00650-10001-02A

1
EL +114142 G8 B10
13
F6 B10 7
175

SPOOL 2A/124 -
S5
6000mm 350NPD

MASTER COPY
5S3C4-350
2
8
SEE ISO FW
WT-4750M01050-10001-03 SPOOL 2A/127 -
E 4071000
N 5177983
EL +111978
534 940mm -RAPID PROJECT-
SPOOL 2A/126 -
320mm AS-BUILT
350 1C136DA N/0
15 1C136DA N/0
WT-4750-10001
15 1C136DA N/0
15 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
00 ASB - AS-BUILT 27-JUL-19 JMP KSI JDL PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC-ISSUED FOR CONSTRUCTION 22-SEP-16 RRR RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-4750-10001-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-4750-0090
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-4750M00650-10001-02
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
2 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 4700 UNIT : 4750 SHT. NO. 1 OF 1 REV. NO. 00

27-Jul-2019
N SHOP MATERIALS

#63 PT
NO.
__
PMRC

________
PART & DESCRIPTION

__________________
SIZE
(DN)
____
QTY

___

1 PAATFRZPEES1P3E PIPE SCH 20 ERW STL API-5L-B 350 4.3 M

2 PAATFRZPEES1K3E PIPE SCH 20 ERW STL API-5L-B 250 3.4 M


5
3 NEAFKRBEAN1P3E1K3E REDUCER CONC SCH 20 STL A234 WPB 350X250 2
EL +111978
SPOOL 2A/128 - 1 4 NKAGDCBEZZ1P3E2A3K WELDOLET SCH 20 (HD) X SCH 80 (BR) STL A105 350X50 1
GRID LINE
10 1980mm SPOOL 2A/129 - 5 NCAFKRBEAN1P3E ELL 90 DEG LR SCH 20 STL A234 WPB 350 3
980mm 6 NHAFKRBEAN1K3E TEE SCH 20 STL A234 WPB 250X250 2
SEE ISO 534
WT-4750M00650-10001-05 7 NCAFKRBEAN1K3E ELL 90 DEG LR SCH 20 STL A234 WPB 250 2
E 4071000 330
50 00 2
N 5178650 18 15 3 8 FLALDCERFZZ1P3E FLG WN 150# RF SCH 20 STL A105 350 2
EL +112194
350X250NPD stop here
9 FLALDCERFZZ1K3E FLG WN 150# RF SCH 20 STL A105 250 4
4
3
20 350X50NPD
00 PIPE SUPPORTS
S10

2
10 5S3C4-350 WELDED STANDARD SHOE - TYPE3, 100MM HIGH, 350 2

2064
6 5S3C4-350
SEE ISO 66 CS
GRID LINE SEE ISO

984
WT-4750M00650-10001-02 1 216 WT-4750M00650-10002-05

*WT-4750M01050-10001-03*
E 4071000 21 B
WT-4750M01050-10001-03B E 4074000
N 5177983 FW FIELD MATERIALS
N 5177950
EL +111978 400NPD EL +113698
PT PMRC PART & DESCRIPTION SIZE QTY
17
20 10 NO. (DN)
350NPD __ ________ __________________ ____ ___
400X350NPD 19 15
WT-4750M01050-10001-03D
FW 11 GEASDUERFDJ1P0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 350 2
FW 5
4 F8 G11 B13
FW 12 GEASDUERFDJ1K0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 250 2

216 16 534 13 BAAAAAZZ1A3G STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1 12


15 330 mm Length

318
330

1
WT-4750M01050-10001-03A 6 17 14 BAAAAAZZ0J1G STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 7/8 24
7
59 14

1721
130 mm Length
5 6 1 15 LQBDBKERFZRCHC1P CHECK-DUAL PLATE LUG 150# RF CS BODY, 350 1
SEE ISO 0
250X250NPD 66 13 410SS/ST6 TRIM
WT-4750M01050-10001-04 3
F9 STEM WEST 16 VUBNATERFAJBKMHX1K GLOBE 150# RF CS BODY, 410SS/ST6 TRIM FB GO 250 1
E 4071000 7 350X250NPD
7
N 5180500 18 184 SPOOL NO.
EL +109597 16 50

2063
10 99 50
8 STEM SOUTH 16 25 WT-4750M01050-10001-03A | WT-4750M01050-10001-03B | WT-4750M01050-10001-03C |
HW WEST WT-4750M01050-10001-03D
F9 G12 B14 48

1199
3 F8 G11

2
5
S10
EL +111978
622 5S3C4-350

WT-4750M01050-10001-03C 6
250X250NPD
12
F9 G12 B14
30 18
SPOOL 2A/131 -
00 89

7
980mm

318
59
10
9

7 F9
11

STEM EAST
SEE ISO
WT-4750M01050-10001-04
E 4074000
SPOOL 2A/130 - N 5180500
EL +109597
1400mm

MASTER COPY
-RAPID PROJECT- WT-4750-10001
250
350
1C136DA
1C136DA
N/0
N/0
50 1C136DA N/0
250 1C136DA N/0

AS-BUILT
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
00 ASB - AS-BUILT 04-JUN-19 SEJ JLC JDL PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC-ISSUED FOR CONSTRUCTION 06-OCT-16 RRR HIC BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
350-WT-4750-10001-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-4750-0090
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-4750M01050-10001-03
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
2 1A N 5% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 4700 UNIT : 4750 SHT. NO. 1 OF 1 REV. NO. 00

4-Jun-2019
N SHOP MATERIALS

#63 PT
NO.
__
PMRC

________
PART & DESCRIPTION

__________________
SIZE
(DN)
____
QTY

___

1 PAATFRZPEES1K3E PIPE SCH 20 ERW STL API-5L-B 250 1.7 M

2 PAATFRZPEES6A3G PIPE SCH 40 ERW STL API-5L-B 150 0.8 M

3 NMAGDCERFZZ1K1F3K FLANGED OLET 150# RF (BR) SCH 80 STL A105 250X40 2

4 NCAFKRBEAN1K3E ELL 90 DEG LR SCH 20 STL A234 WPB 250 2

5 FLALDCERFZZ1K3E FLG WN 150# RF SCH 20 STL A105 250 2

6 FLALDCFRFZZ1K3E FLG WN 300# RF SCH 20 STL A105 250 2

SPOOL 2A/132 - FIELD MATERIALS


SEE ISO
WT-4750M01050-10001-03 850mm PT PMRC PART & DESCRIPTION SIZE QTY
E 4071000 NO. (DN)
N 5180500 __ ________ __________________ ____ ___
EL +109597
F5 G7 B11
71 7 GEASDUERFDJ1K0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 250 4
13
G7 STEM WEST

557
DO NOT CUT HOLE IN PIPE 8 GEASDUFRFDJ1K0D GASKET 300# 316SS SPIRAL WOUND GRAPHITE IR 250 2
HW NORTH

*WT-4750M01050-10001-04*
E S20
483
1 9 GEASDUERFDJ1F0D GASKET 150# 316SS SPIRAL WOUND GRAPHITE IR 40 4
LIN
ID 5BSGA2
GR
10 BAAAAAZZ1A1Q STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1 32
10 2 170 mm Length
4 DUMMY WELD WT-4750M01050-10001-04B 11 BAAAAAZZ0J2A STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 7/8 24
250NPD 70
0 200 mm Length
387

1 12 BAAAAAZZ0F0S STUD-BOLT A193 GR B7 W/A194 GR 2H NUTS - 1/2 16


S18 289 80 mm Length
150NPD

20
5BP2 00 3 13 LGBUCBERFZBPJZZ1K BUTTERFLY-LUG 150# RF CS BODY, 250 2
3
457
REF: MPS-ML-4750-1055 4 250X40NPD SS/PTFE/ALY625 TRIM GO
2

14 VJBJCBERFAJEKMZZ1F GATE 150# RF CS BODY, 316SS/ST6 TRIM RB 40 2


S17 64
8
5BS2 15 FEALDCERFZZ1F FLG BLIND 150# RF STL A105 40 2
165 14
STEM NORTH SEE ISO
G9 B12 INSTRUMENTS
15 G9 B12 WT-4750M01050-10001-03
29
7 E 4074000 16 4750FCV-0002 FLOW CONTROL VALVE 250 1
E 4071000
N 5180500
N 5180500
00 5 EL +109597 PIPE SUPPORTS
15 EL +108699 F6 G8 B10
GR 4750
ID 16 17 5BS2 BASE SUPPORT 250 2
L FCV 00 WT-4750M01050-10001-04A S18
B INE F6 G8 B10 1
0002 5BP2
64 13 18 5BP2 BASE PLATE 150 2
9 REF: MPS-ML-4750-1056
16 STEM EAST
3 HW NORTH 71 19 5BSG2E BASE SUPPORT GUIDE - FREE EAST-WEST 150 1
6
250X40NPD G7
F5 G7 B11 20 5BSGA2 BASE SUPPORT GUIDE - ALL AROUND 150 1
289
SPOOL NO.

457

557
14 7
70
STEM NORTH 0 WT-4750M01050-10001-04A | WT-4750M01050-10001-04B

483
10 S17
165 5BS2
G9 B12 DO NOT CUT HOLE IN PIPE
G9 B12
15 250NPD
8
4

387
S19 EL +109037

150NPD
5BSG2E

2
SPOOL 2A/133 - 9

MASTER COPY
DUMMY WELD
850mm

E 4074000
N 5180500
-RAPID PROJECT-
EL +108699

AS-BUILT

250 1C136DA N/0


150 1C136DA N/0
WT-4750-10001
40 1C136DA N/0
40 1C136DA N/0
LINE NO SIZE LINE SPEC. INSUL/ THK(mm)
SERVICE: WT CODE: B31.3
OPERATING DESIGN Barg 3.00 C 28.00
17.50 75.00
OWNER : PROJECT TITLE:
PETRONAS RAPID PROJECT, PENGERANG
00 ASB - AS-BUILT 20-JUL-19 JBJ KSI JDL PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
:NOTES: P&ID REF: PIPING LINE:
0 IFC-ISSUED FOR CONSTRUCTION 05-OCT-16 RRR RMR BMB
1. FOR ISOMETRIC FABRICATION NOTES REFER TO RAPID-P0014-OUI-PIP-DWG-0001-5006 PRPC Utilities and Facilities Sdn Bhd
250-WT-4750-10001-1C136DA-N
2. IF ANY DISCREPANCY ENCOUNTERED BETWEEN REF. DATA WITH LINE LIST AND NDE EXTENT, LINE LIST SHALL PREVAIL. RAPID-P0014-OUI-PRO-PID-4750-0090
REV DESCRIPTION DATE DRAWN CHKD APPD CONTRACTOR :
3. ABOVEGROUND AND UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR THE FINAL WELD MAPPING BASED ON THE MATERIAL DWG NO : WT-4750M01050-10001-04
JOB NO : P0014
& SITE CONDITION. STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
2 1A N 5'% TEST PRESSURE: 29.40 Barg Technip Geoproduction (M) Sdn Bhd AREA : 4700 UNIT : 4750 SHT. NO. 1 OF 1 REV. NO. 00