Professional Documents
Culture Documents
P0571-Brake Switch 1 Performance: 2010 Jeep Grand Cherokee Limited 2010 Jeep Grand Cherokee Limited
P0571-Brake Switch 1 Performance: 2010 Jeep Grand Cherokee Limited 2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
ADDITIONAL WIRING
For a complete wiring diagram, refer to appropriate SYSTEM WIRING DIAGRAMS article(s).
THEORY OF OPERATION
The brake switch rationality checks both failure modes of the brake switch. The brake switch stuck on test
checks for a high vehicle speed condition where the brake switch is unexpectedly depressed. The brake switch
stuck off test checks for repeated vehicle stop maneuvers without the brake switch depressed.
MONITOR CONDITIONS
When Monitored:
Ignition on.
SET CONDITIONS
Set Condition:
If the output of Brake Switch No. 1 to the PCM looks like it is not applied, while Brake Lamp Switch
Output circuit is applied the fault will mature in 60ms. One Trip Fault.
POSSIBLE CAUSES
Possible Causes
(B15) BRAKE SWITCH NO. 1 SIGNAL CIRCUIT SHORTED TO GROUND
(B16) BRAKE SWITCH NO. 2 SIGNAL CIRCUIT OPEN
(B16) BRAKE SWITCH NO. 2 SIGNAL CIRCUIT SHORTED TO GROUND
(Z904) GROUND CIRCUIT OPEN
STOP LAMP SWITCH
POWERTRAIN CONTROL MODULE (PCM)
Always perform the Pre-Diagnostic Troubleshooting procedure before proceeding. See DTC-Based
Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
DIAGNOSTIC TEST
1. ACTIVE DTC
NOTE: Make sure the Stop Lamp Switch is properly adjusted before continuing.
NOTE: Make sure the Stop Lamp Switch is properly wired, such as (B15) Brake
Switch No. 1 and (B16) Brake Switch No. 2 Signal circuit are not switched
at the harness connector.
domingo, 9 de julio de 2023 04:19:38 a. m. Page 2 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
Yes
Go to step 2
No
domingo, 9 de julio de 2023 04:19:38 a. m. Page 3 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
Yes
Repair the short to ground in the (B15) Brake Switch No. 1 Signal circuit.
Perform the POWERTRAIN VERIFICATION TEST. See DTC-Based
Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
No
Go to step 3
domingo, 9 de julio de 2023 04:19:38 a. m. Page 4 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
Yes
Go to step 4
No
domingo, 9 de julio de 2023 04:19:38 a. m. Page 5 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
Repair the open in the (B16) Brake Switch No. 2 Signal circuit.
1. Measure the resistance between ground and the (B16) Brake Switch No. 2 Signal circuit in the Stop
Lamp Switch harness connector.
Yes
Repair the short to ground in the (B16) Brake Switch No. 2 Signal circuit.
domingo, 9 de julio de 2023 04:19:38 a. m. Page 6 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
No
Go to step 5
Fig. 65: Measuring Resistance Between Ground And Ground Circuit In Stop Lamp Switch Harness
Connector
Courtesy of CHRYSLER LLC
1. Measure the resistance between ground and the (Z904) Ground circuit in the Stop Lamp Switch
harness connector.
domingo, 9 de julio de 2023 04:19:38 a. m. Page 7 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
Yes
Go to step 6
No
Does the resistance change from below 5.0 ohms to an open circuit for one or both of the
measurements taken?
Yes
Go to step 7
No
Verify that there is good pin to terminal contact in the Switch and Powertrain Control
Module connectors. If OK, replace the Stop Lamp Switch.
Perform the POWERTRAIN VERIFICATION TEST. See DTC-Based
Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
7. POWERTRAIN CONTROL MODULE (PCM)
1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Stop
Lamp Switch and the Powertrain Control Module (PCM).
2. Look for any chafed, pierced, pinched, or partially broken wires.
3. Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal
contact in the Switch and Powertrain Control Module connectors.
4. Refer to any Technical Service Bulletins that may apply.
Yes
Repair as necessary.
Perform the POWERTRAIN VERIFICATION TEST. See DTC-Based
Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
domingo, 9 de julio de 2023 04:19:38 a. m. Page 8 © 2011 Mitchell Repair Information Company, LLC.
2010 Jeep Grand Cherokee Limited
2010 ENGINE PERFORMANCE Powertrain Control Module (PCM) - Electrical Diagnostics - NGC - Grand Cherokee
No
Replace and program the Powertrain Control Module per Service Information.
Perform the POWERTRAIN VERIFICATION TEST. See DTC-Based
Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
domingo, 9 de julio de 2023 04:19:38 a. m. Page 9 © 2011 Mitchell Repair Information Company, LLC.